{"title":"基于有限元的机器人施工仿真实时任务规划","authors":"Qingfeng Xu, Aiyu Zhu, Gangyan Xu, Zimu Shao, Junjun Zhang, Hong Zhang","doi":"10.1016/j.autcon.2024.105935","DOIUrl":null,"url":null,"abstract":"Real-time prefabricated construction faces challenges in robot planning using Building Information Modeling (BIM) due to the need for temporary structure stability. Existing static analysis methods fail to account for dynamic changes and uncertainties. This paper introduces a framework to streamline construction planning, focusing on real-time stability checks for prefabricated structures. Construction procedures are defined in BIM, with structural information automatically transferred to the Finite Element Method (FEM) domain via the BIM-2-FEM converter for stability analysis based on Eurocode standards. Upon successful stability checks, construction is implemented using Robot Operating System (ROS). A case study validates the framework, showcasing improved decision-making, efficiency, and structural integrity through procedures like component assembly and selection optimization. By integrating BIM, FEM, and ROS, this framework enables efficient planning and real-time structural analysis for prefabricated and temporary structures, ultimately enhancing construction productivity and safety.","PeriodicalId":8660,"journal":{"name":"Automation in Construction","volume":"25 1","pages":""},"PeriodicalIF":9.6000,"publicationDate":"2024-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"FEM-based real-time task planning for robotic construction simulation\",\"authors\":\"Qingfeng Xu, Aiyu Zhu, Gangyan Xu, Zimu Shao, Junjun Zhang, Hong Zhang\",\"doi\":\"10.1016/j.autcon.2024.105935\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Real-time prefabricated construction faces challenges in robot planning using Building Information Modeling (BIM) due to the need for temporary structure stability. Existing static analysis methods fail to account for dynamic changes and uncertainties. This paper introduces a framework to streamline construction planning, focusing on real-time stability checks for prefabricated structures. Construction procedures are defined in BIM, with structural information automatically transferred to the Finite Element Method (FEM) domain via the BIM-2-FEM converter for stability analysis based on Eurocode standards. Upon successful stability checks, construction is implemented using Robot Operating System (ROS). A case study validates the framework, showcasing improved decision-making, efficiency, and structural integrity through procedures like component assembly and selection optimization. By integrating BIM, FEM, and ROS, this framework enables efficient planning and real-time structural analysis for prefabricated and temporary structures, ultimately enhancing construction productivity and safety.\",\"PeriodicalId\":8660,\"journal\":{\"name\":\"Automation in Construction\",\"volume\":\"25 1\",\"pages\":\"\"},\"PeriodicalIF\":9.6000,\"publicationDate\":\"2024-12-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation in Construction\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1016/j.autcon.2024.105935\",\"RegionNum\":1,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation in Construction","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1016/j.autcon.2024.105935","RegionNum":1,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
FEM-based real-time task planning for robotic construction simulation
Real-time prefabricated construction faces challenges in robot planning using Building Information Modeling (BIM) due to the need for temporary structure stability. Existing static analysis methods fail to account for dynamic changes and uncertainties. This paper introduces a framework to streamline construction planning, focusing on real-time stability checks for prefabricated structures. Construction procedures are defined in BIM, with structural information automatically transferred to the Finite Element Method (FEM) domain via the BIM-2-FEM converter for stability analysis based on Eurocode standards. Upon successful stability checks, construction is implemented using Robot Operating System (ROS). A case study validates the framework, showcasing improved decision-making, efficiency, and structural integrity through procedures like component assembly and selection optimization. By integrating BIM, FEM, and ROS, this framework enables efficient planning and real-time structural analysis for prefabricated and temporary structures, ultimately enhancing construction productivity and safety.
期刊介绍:
Automation in Construction is an international journal that focuses on publishing original research papers related to the use of Information Technologies in various aspects of the construction industry. The journal covers topics such as design, engineering, construction technologies, and the maintenance and management of constructed facilities.
The scope of Automation in Construction is extensive and covers all stages of the construction life cycle. This includes initial planning and design, construction of the facility, operation and maintenance, as well as the eventual dismantling and recycling of buildings and engineering structures.