{"title":"在BIM模型上自动创建nD模型","authors":"Miroslav Vyčítal, Č. Jarský","doi":"10.2478/otmcj-2020-0018","DOIUrl":null,"url":null,"abstract":"Abstract The construction technology (CONTEC) method was originally developed for automated CONTEC planning and project management based on the data in the form of a budget or bill of quantities. This article outlines a new approach in an automated creation of the discrete nD building information modeling (BIM) models by using data from the BIM model and their processing by existing CONTEC method through the CONTEC software. This article outlines the discrete modeling approach on BIM models as one of the applicable approaches for nD modeling. It also defines the methodology of interlinking BIM model data and CONTEC software through the classification of items. The interlink enables automation in the production of discrete nD BIM model data, such as schedule (4D) including work distribution end resource planning, budget (5D)—based on integrated pricing system, but also nD data such as health and safety risks (6D) plans (H&S Risk register), quality plans, and quality assurance checklists (7D) including their monitoring and environmental plans (8D). The methodology of the direct application of the selected classification system, as well as means of data transfer and conditions of data transferability, is described. The method was tested on the case study of an office building project, and acquired data were compared to actual construction time and costs. The case study proves the application of the CONTEC method as a usable method in the BIM model environment, enabling the creation of not only 4D, 5D models but also nD discrete models up to 8D models in the perception of the construction management process. In comparison with the existing BIM classification systems, further development of the method will enable full automated discrete nD model creation in the BIM model environment.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"12 1","pages":"2218 - 2231"},"PeriodicalIF":1.6000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"An automated nD model creation on BIM models\",\"authors\":\"Miroslav Vyčítal, Č. Jarský\",\"doi\":\"10.2478/otmcj-2020-0018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The construction technology (CONTEC) method was originally developed for automated CONTEC planning and project management based on the data in the form of a budget or bill of quantities. This article outlines a new approach in an automated creation of the discrete nD building information modeling (BIM) models by using data from the BIM model and their processing by existing CONTEC method through the CONTEC software. This article outlines the discrete modeling approach on BIM models as one of the applicable approaches for nD modeling. It also defines the methodology of interlinking BIM model data and CONTEC software through the classification of items. The interlink enables automation in the production of discrete nD BIM model data, such as schedule (4D) including work distribution end resource planning, budget (5D)—based on integrated pricing system, but also nD data such as health and safety risks (6D) plans (H&S Risk register), quality plans, and quality assurance checklists (7D) including their monitoring and environmental plans (8D). The methodology of the direct application of the selected classification system, as well as means of data transfer and conditions of data transferability, is described. The method was tested on the case study of an office building project, and acquired data were compared to actual construction time and costs. The case study proves the application of the CONTEC method as a usable method in the BIM model environment, enabling the creation of not only 4D, 5D models but also nD discrete models up to 8D models in the perception of the construction management process. In comparison with the existing BIM classification systems, further development of the method will enable full automated discrete nD model creation in the BIM model environment.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"12 1\",\"pages\":\"2218 - 2231\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2020-0018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2020-0018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 3

摘要

摘要施工技术(CONTEC)方法最初是为了基于预算或工程量清单形式的数据进行自动化CONTEC规划和项目管理而开发的。本文概述了一种自动化创建离散nD建筑信息建模(BIM)模型的新方法,该方法使用BIM模型中的数据,并通过CONTEC软件使用现有的CONTEC方法对其进行处理。本文概述了BIM模型的离散建模方法,作为nD建模的适用方法之一。它还定义了通过项目分类将BIM模型数据和CONTEC软件互连的方法。这种互连可以实现离散的BIM模型数据的自动化生产,例如进度(4D),包括工作分配,资源规划,基于集成定价系统的预算(5D),以及健康和安全风险(6D)计划(H&S风险登记册),质量计划和质量保证检查清单(7D),包括其监测和环境计划(8D)。描述了直接应用所选分类系统的方法,以及数据传输的手段和数据可传输的条件。以某办公楼工程为例,对该方法进行了验证,并将所得数据与实际施工时间和成本进行了对比。该案例研究证明了CONTEC方法在BIM模型环境中的应用,不仅可以创建4D, 5D模型,还可以创建nD离散模型,直至8D模型,从而感知施工管理过程。与现有的BIM分类系统相比,该方法的进一步发展将使BIM模型环境中完全自动化的离散nD模型创建成为可能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An automated nD model creation on BIM models
Abstract The construction technology (CONTEC) method was originally developed for automated CONTEC planning and project management based on the data in the form of a budget or bill of quantities. This article outlines a new approach in an automated creation of the discrete nD building information modeling (BIM) models by using data from the BIM model and their processing by existing CONTEC method through the CONTEC software. This article outlines the discrete modeling approach on BIM models as one of the applicable approaches for nD modeling. It also defines the methodology of interlinking BIM model data and CONTEC software through the classification of items. The interlink enables automation in the production of discrete nD BIM model data, such as schedule (4D) including work distribution end resource planning, budget (5D)—based on integrated pricing system, but also nD data such as health and safety risks (6D) plans (H&S Risk register), quality plans, and quality assurance checklists (7D) including their monitoring and environmental plans (8D). The methodology of the direct application of the selected classification system, as well as means of data transfer and conditions of data transferability, is described. The method was tested on the case study of an office building project, and acquired data were compared to actual construction time and costs. The case study proves the application of the CONTEC method as a usable method in the BIM model environment, enabling the creation of not only 4D, 5D models but also nD discrete models up to 8D models in the perception of the construction management process. In comparison with the existing BIM classification systems, further development of the method will enable full automated discrete nD model creation in the BIM model environment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1