考虑高比例集成光伏的配电网储能分配和线路升级的综合配置策略

IF 1.6 Q4 ENERGY & FUELS IET Energy Systems Integration Pub Date : 2022-11-17 DOI:10.1049/esi2.12084
Xiaohui Zhang, Liang Wang, Bo Zhang, Jia Li, Yongchao Pan, Lu Zhang, Wei Tang
{"title":"考虑高比例集成光伏的配电网储能分配和线路升级的综合配置策略","authors":"Xiaohui Zhang,&nbsp;Liang Wang,&nbsp;Bo Zhang,&nbsp;Jia Li,&nbsp;Yongchao Pan,&nbsp;Lu Zhang,&nbsp;Wei Tang","doi":"10.1049/esi2.12084","DOIUrl":null,"url":null,"abstract":"<p>The rapid development of photovoltaics (PVs) and load caused a significant increase in peak loads and peak-valley differences in rural distribution networks, which require load peak shifting and line upgrading. Large peak-valley differences also bring challenges on the safe operation of the utility power grid. Considering the integration of a high proportion of PVs, this study establishes a bilevel comprehensive configuration model for energy storage allocation and line upgrading in distribution networks, which can reduce peak loads and peak-valley differences. In the upper level, a minimum annual planning cost is obtained by developing the installation capacity of centralised energy storage in transformer stations, the installation location and capacity of decentralised energy storage on lines and a scheme of line upgrading. In the lower level, the minimum total annual operation cost of the distribution network is obtained by developing an optimal scheduling for the centralised energy storage in transformer stations and decentralised energy storage on lines. Simulation results show that compared with the conventional energy storage planning strategy, the configuration investment can be reduced by 467.66 million yuan at least with the proposed strategy.</p>","PeriodicalId":33288,"journal":{"name":"IET Energy Systems Integration","volume":"5 1","pages":"54-65"},"PeriodicalIF":1.6000,"publicationDate":"2022-11-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://onlinelibrary.wiley.com/doi/epdf/10.1049/esi2.12084","citationCount":"0","resultStr":"{\"title\":\"Comprehensive configuration strategy of energy storage allocation and line upgrading for distribution networks considering a high proportion of integrated photovoltaics\",\"authors\":\"Xiaohui Zhang,&nbsp;Liang Wang,&nbsp;Bo Zhang,&nbsp;Jia Li,&nbsp;Yongchao Pan,&nbsp;Lu Zhang,&nbsp;Wei Tang\",\"doi\":\"10.1049/esi2.12084\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<p>The rapid development of photovoltaics (PVs) and load caused a significant increase in peak loads and peak-valley differences in rural distribution networks, which require load peak shifting and line upgrading. Large peak-valley differences also bring challenges on the safe operation of the utility power grid. Considering the integration of a high proportion of PVs, this study establishes a bilevel comprehensive configuration model for energy storage allocation and line upgrading in distribution networks, which can reduce peak loads and peak-valley differences. In the upper level, a minimum annual planning cost is obtained by developing the installation capacity of centralised energy storage in transformer stations, the installation location and capacity of decentralised energy storage on lines and a scheme of line upgrading. In the lower level, the minimum total annual operation cost of the distribution network is obtained by developing an optimal scheduling for the centralised energy storage in transformer stations and decentralised energy storage on lines. Simulation results show that compared with the conventional energy storage planning strategy, the configuration investment can be reduced by 467.66 million yuan at least with the proposed strategy.</p>\",\"PeriodicalId\":33288,\"journal\":{\"name\":\"IET Energy Systems Integration\",\"volume\":\"5 1\",\"pages\":\"54-65\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-11-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://onlinelibrary.wiley.com/doi/epdf/10.1049/esi2.12084\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IET Energy Systems Integration\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://onlinelibrary.wiley.com/doi/10.1049/esi2.12084\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IET Energy Systems Integration","FirstCategoryId":"1085","ListUrlMain":"https://onlinelibrary.wiley.com/doi/10.1049/esi2.12084","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

随着光伏发电和负荷的快速发展,农村配电网的峰值负荷和峰谷差显著增大,需要进行负荷调峰和线路改造。巨大的峰谷差异也给电网的安全运行带来了挑战。考虑到高比例光伏的整合,本文建立了一种能够降低峰负荷和峰谷差异的配电网储能配置和线路升级的双层综合配置模型。上层通过制定变电站集中储能安装容量、线路上分散储能安装位置和容量以及线路升级方案,使年规划成本最小。在下一级,通过制定变电站集中储能和线路分散储能的最优调度,获得配电网年总运行成本的最小值。仿真结果表明,与传统的储能规划策略相比,该策略至少可减少配置投资4.6766亿元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。

摘要图片

查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Comprehensive configuration strategy of energy storage allocation and line upgrading for distribution networks considering a high proportion of integrated photovoltaics

The rapid development of photovoltaics (PVs) and load caused a significant increase in peak loads and peak-valley differences in rural distribution networks, which require load peak shifting and line upgrading. Large peak-valley differences also bring challenges on the safe operation of the utility power grid. Considering the integration of a high proportion of PVs, this study establishes a bilevel comprehensive configuration model for energy storage allocation and line upgrading in distribution networks, which can reduce peak loads and peak-valley differences. In the upper level, a minimum annual planning cost is obtained by developing the installation capacity of centralised energy storage in transformer stations, the installation location and capacity of decentralised energy storage on lines and a scheme of line upgrading. In the lower level, the minimum total annual operation cost of the distribution network is obtained by developing an optimal scheduling for the centralised energy storage in transformer stations and decentralised energy storage on lines. Simulation results show that compared with the conventional energy storage planning strategy, the configuration investment can be reduced by 467.66 million yuan at least with the proposed strategy.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
IET Energy Systems Integration
IET Energy Systems Integration Engineering-Engineering (miscellaneous)
CiteScore
5.90
自引率
8.30%
发文量
29
审稿时长
11 weeks
期刊最新文献
A reinforcement learning method for two-layer shipboard real-time energy management considering battery state estimation Cover Image Guest Editorial: Identification, stability analysis, control, and situation awareness of power systems with high penetrations of renewable energy resources Transient overvoltage suppression of LCC-HVDC sending-end system based on DC current control optimisation Theoretical study on Stark effect of Rydberg atom in super low frequency electric field measurement
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1