在保护区发展的环境影响评估中考虑废物管理

IF 1.8 4区 社会学 Q3 ENVIRONMENTAL STUDIES Impact Assessment and Project Appraisal Pub Date : 2022-05-26 DOI:10.1080/14615517.2022.2080491
C.E. Claassens, D. Cilliers, F. Retief, C. Roos, R. Alberts
{"title":"在保护区发展的环境影响评估中考虑废物管理","authors":"C.E. Claassens, D. Cilliers, F. Retief, C. Roos, R. Alberts","doi":"10.1080/14615517.2022.2080491","DOIUrl":null,"url":null,"abstract":"ABSTRACT Waste management is an important consideration for developments within protected areas (PAs). With the growing demand for mainly tourism-related infrastructure in PAs, more urgent and innovate ways of dealing with waste management are required. Internationally environmental impact assessment (EIA) is considered a key policy instrument to inform waste management-related decision-making for new developments. The EIA process makes provision for the identification of waste-related impacts and mitigation measures during the construction-, operation- and decommissioning phases of a development. However, there has been scant reflection on the role of EIA in dealing with waste management decision-making in PAs. Therefore, this research aims to review the extent to which waste management measures are considered in EIAs for developments in PAs. The results show that waste management measures are, for the most part, poorly considered. For example, EIAs failed to provide estimates of expected waste types and quantities and mostly failed to consider the waste management hierarchy. Recommendations are made towards improving the consideration of waste management measures in EIAs for developments within PAs. These include the drafting of guidelines for waste management in protected areas; training relevant roleplayers on waste management measures; and promoting specialist input on waste-related matters for EIAs in PAs.","PeriodicalId":47528,"journal":{"name":"Impact Assessment and Project Appraisal","volume":"40 1","pages":"320 - 330"},"PeriodicalIF":1.8000,"publicationDate":"2022-05-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"The consideration of waste management in environmental impact assessment (EIA) for developments in protected areas\",\"authors\":\"C.E. Claassens, D. Cilliers, F. Retief, C. Roos, R. Alberts\",\"doi\":\"10.1080/14615517.2022.2080491\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Waste management is an important consideration for developments within protected areas (PAs). With the growing demand for mainly tourism-related infrastructure in PAs, more urgent and innovate ways of dealing with waste management are required. Internationally environmental impact assessment (EIA) is considered a key policy instrument to inform waste management-related decision-making for new developments. The EIA process makes provision for the identification of waste-related impacts and mitigation measures during the construction-, operation- and decommissioning phases of a development. However, there has been scant reflection on the role of EIA in dealing with waste management decision-making in PAs. Therefore, this research aims to review the extent to which waste management measures are considered in EIAs for developments in PAs. The results show that waste management measures are, for the most part, poorly considered. For example, EIAs failed to provide estimates of expected waste types and quantities and mostly failed to consider the waste management hierarchy. Recommendations are made towards improving the consideration of waste management measures in EIAs for developments within PAs. These include the drafting of guidelines for waste management in protected areas; training relevant roleplayers on waste management measures; and promoting specialist input on waste-related matters for EIAs in PAs.\",\"PeriodicalId\":47528,\"journal\":{\"name\":\"Impact Assessment and Project Appraisal\",\"volume\":\"40 1\",\"pages\":\"320 - 330\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2022-05-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Impact Assessment and Project Appraisal\",\"FirstCategoryId\":\"90\",\"ListUrlMain\":\"https://doi.org/10.1080/14615517.2022.2080491\",\"RegionNum\":4,\"RegionCategory\":\"社会学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENVIRONMENTAL STUDIES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Impact Assessment and Project Appraisal","FirstCategoryId":"90","ListUrlMain":"https://doi.org/10.1080/14615517.2022.2080491","RegionNum":4,"RegionCategory":"社会学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL STUDIES","Score":null,"Total":0}
引用次数: 4

摘要

摘要废物管理是保护区内开发的一个重要考虑因素。随着对保护区主要与旅游业相关的基础设施的需求不断增长,需要更紧迫和创新的方式来处理废物管理。国际环境影响评估(EIA)被认为是为新开发项目的废物管理相关决策提供信息的关键政策工具。环境影响评估程序规定了在开发项目的施工、运营和退役阶段识别废物相关影响和缓解措施。然而,很少有人反思环境影响评估在处理巴勒斯坦权力机构废物管理决策方面的作用。因此,本研究旨在审查环境影响评估中对PA发展的废物管理措施的考虑程度。结果表明,废物管理措施在很大程度上考虑不周。例如,环境影响评价未能提供预期废物类型和数量的估计,而且大多未能考虑废物管理层级。建议改进环境影响评价中对废物管理措施的考虑,以便在规划区内进行开发。其中包括起草保护区废物管理准则;就废物管理措施培训相关角色扮演者;以及促进专门机构就废物相关事项向环境影响评价机构提供专家意见。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The consideration of waste management in environmental impact assessment (EIA) for developments in protected areas
ABSTRACT Waste management is an important consideration for developments within protected areas (PAs). With the growing demand for mainly tourism-related infrastructure in PAs, more urgent and innovate ways of dealing with waste management are required. Internationally environmental impact assessment (EIA) is considered a key policy instrument to inform waste management-related decision-making for new developments. The EIA process makes provision for the identification of waste-related impacts and mitigation measures during the construction-, operation- and decommissioning phases of a development. However, there has been scant reflection on the role of EIA in dealing with waste management decision-making in PAs. Therefore, this research aims to review the extent to which waste management measures are considered in EIAs for developments in PAs. The results show that waste management measures are, for the most part, poorly considered. For example, EIAs failed to provide estimates of expected waste types and quantities and mostly failed to consider the waste management hierarchy. Recommendations are made towards improving the consideration of waste management measures in EIAs for developments within PAs. These include the drafting of guidelines for waste management in protected areas; training relevant roleplayers on waste management measures; and promoting specialist input on waste-related matters for EIAs in PAs.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.60
自引率
22.70%
发文量
52
期刊介绍: This is the international, peer-reviewed journal of the International Association for Impact Assessment (IAIA). It covers environmental, social, health and other impact assessments, cost-benefit analysis, technology assessment, and other approaches to anticipating and managing impacts. It has readers in universities, government and public agencies, consultancies, NGOs and elsewhere in over 100 countries. It has editorials, main articles, book reviews, and a professional practice section.
期刊最新文献
A game theoretic decision-making approach to reduce mine closure risks throughout the mine-life cycle Consideration of risks to people and the environment related to accidents on natural gas transmission pipelines in LUP and SEA processes in Poland Landscape, EIA and decision-making. A case study of the Vistula Spit Canal, Poland SEA and EIA: uncertain boundaries in Spain Influence factors on the quality of regulatory impact analysis in Brazil
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1