泄水道涵洞设计的改进——以印尼燃煤电厂为例

IF 0.9 Q3 ENGINEERING, MULTIDISCIPLINARY Journal of Engineering and Technological Sciences Pub Date : 2023-07-17 DOI:10.5614/j.eng.technol.sci.2023.55.10
Dwi Rian Sulaeman, Zakie Anugia, Muhammad Idris, I. Istiarto, S. Nurhady
{"title":"泄水道涵洞设计的改进——以印尼燃煤电厂为例","authors":"Dwi Rian Sulaeman, Zakie Anugia, Muhammad Idris, I. Istiarto, S. Nurhady","doi":"10.5614/j.eng.technol.sci.2023.55.10","DOIUrl":null,"url":null,"abstract":"The construction of a new CFPP in Indonesia, which was located next to three existing power plants and utilized an existing discharge channel, faced the problem of insufficient capacity of the existing discharge channel to deliver water to four power plants. The problem occurred not only because of the overcapacity of the cooling water flow proposed by the new CFPP but also because of the small size of the culvert located in the discharge channel. This paper discusses several methods to overcome this problem by enlarging the culvert area or by removing the culvert from the channel and replacing it with a bridge. A hydraulic study was investigated using the HEC-RAS software by utilizing inputs obtained from the existing channel geometry and flow measurement data. It was found that additional culverts on both sides with a size of 2 m x 4 m and 3 m x 1 m could reduce the water level by 1.12 m and 0.39 m, respectively. Meanwhile, removing the culvert provided a significant water level reduction of 1.39 m. Enlarging the culvert was chosen as the solution to the discharge channel capacity issue since removing the culvert would require temporarily closing the channel during construction and stopping the operation of the existing power plant.","PeriodicalId":15689,"journal":{"name":"Journal of Engineering and Technological Sciences","volume":null,"pages":null},"PeriodicalIF":0.9000,"publicationDate":"2023-07-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modification of Culvert Design on Discharge Channel: A Case Study in Indonesian Coal-Fired Power Plant\",\"authors\":\"Dwi Rian Sulaeman, Zakie Anugia, Muhammad Idris, I. Istiarto, S. Nurhady\",\"doi\":\"10.5614/j.eng.technol.sci.2023.55.10\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction of a new CFPP in Indonesia, which was located next to three existing power plants and utilized an existing discharge channel, faced the problem of insufficient capacity of the existing discharge channel to deliver water to four power plants. The problem occurred not only because of the overcapacity of the cooling water flow proposed by the new CFPP but also because of the small size of the culvert located in the discharge channel. This paper discusses several methods to overcome this problem by enlarging the culvert area or by removing the culvert from the channel and replacing it with a bridge. A hydraulic study was investigated using the HEC-RAS software by utilizing inputs obtained from the existing channel geometry and flow measurement data. It was found that additional culverts on both sides with a size of 2 m x 4 m and 3 m x 1 m could reduce the water level by 1.12 m and 0.39 m, respectively. Meanwhile, removing the culvert provided a significant water level reduction of 1.39 m. Enlarging the culvert was chosen as the solution to the discharge channel capacity issue since removing the culvert would require temporarily closing the channel during construction and stopping the operation of the existing power plant.\",\"PeriodicalId\":15689,\"journal\":{\"name\":\"Journal of Engineering and Technological Sciences\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2023-07-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Engineering and Technological Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5614/j.eng.technol.sci.2023.55.10\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Engineering and Technological Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5614/j.eng.technol.sci.2023.55.10","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

在印度尼西亚建设新的CFPP,该项目位于三个现有发电厂旁边,利用现有的排放通道,面临现有排放通道容量不足的问题,无法向四个发电厂供水。出现问题的原因不仅是由于新CFPP提出的冷却水流量过剩,而且由于位于排放通道中的涵洞尺寸较小。本文讨论了几种克服这一问题的方法,即扩大涵洞面积或将涵洞从通道中移除并用桥梁代替。使用HEC-RAS软件,利用从现有通道几何形状和流量测量数据中获得的输入,进行了水力研究。研究发现,两侧加设2 m × 4 m和3 m × 1 m的涵洞,可分别降低水位1.12 m和0.39 m。同时,拆除涵洞使水位显著降低1.39米。由于拆除涵洞需要在施工期间暂时关闭涵洞并停止现有发电厂的运行,因此选择扩大涵洞作为解决排放渠道容量问题的办法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Modification of Culvert Design on Discharge Channel: A Case Study in Indonesian Coal-Fired Power Plant
The construction of a new CFPP in Indonesia, which was located next to three existing power plants and utilized an existing discharge channel, faced the problem of insufficient capacity of the existing discharge channel to deliver water to four power plants. The problem occurred not only because of the overcapacity of the cooling water flow proposed by the new CFPP but also because of the small size of the culvert located in the discharge channel. This paper discusses several methods to overcome this problem by enlarging the culvert area or by removing the culvert from the channel and replacing it with a bridge. A hydraulic study was investigated using the HEC-RAS software by utilizing inputs obtained from the existing channel geometry and flow measurement data. It was found that additional culverts on both sides with a size of 2 m x 4 m and 3 m x 1 m could reduce the water level by 1.12 m and 0.39 m, respectively. Meanwhile, removing the culvert provided a significant water level reduction of 1.39 m. Enlarging the culvert was chosen as the solution to the discharge channel capacity issue since removing the culvert would require temporarily closing the channel during construction and stopping the operation of the existing power plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Engineering and Technological Sciences
Journal of Engineering and Technological Sciences ENGINEERING, MULTIDISCIPLINARY-
CiteScore
2.30
自引率
11.10%
发文量
77
审稿时长
24 weeks
期刊介绍: Journal of Engineering and Technological Sciences welcomes full research articles in the area of Engineering Sciences from the following subject areas: Aerospace Engineering, Biotechnology, Chemical Engineering, Civil Engineering, Electrical Engineering, Engineering Physics, Environmental Engineering, Industrial Engineering, Information Engineering, Mechanical Engineering, Material Science and Engineering, Manufacturing Processes, Microelectronics, Mining Engineering, Petroleum Engineering, and other application of physical, biological, chemical and mathematical sciences in engineering. Authors are invited to submit articles that have not been published previously and are not under consideration elsewhere.
期刊最新文献
Green Energy Technologies: A Key Driver in Carbon Emission Reduction The Effect of Illumination, Electrode Distance, and Illumination Periods on the Performance of Phototrophic Sediment Microbial Fuel Cells (PSMFCs) Comparison Study of Corn Leaf Disease Detection based on Deep Learning YOLO-v5 and YOLO-v8 Hematite-Gamma Alumina-based Solid Catalyst Development for Biodiesel Production from Palm Oil Minimize Total Cost and Maximize Total Profit for Power Systems with Pumped Storage Hydro and Renewable Power Plants Using Improved Self-Organizing Migration Algorithm
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1