{"title":"收到投标书的时限对投标人人数的影响:希腊公共采购的证据","authors":"Andreas Christos Pliatsidis","doi":"10.1108/jopp-05-2022-0025","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe purpose of this paper is to examine how the period for which a public procurement notice remains open for bidding (Δt) affects the number of bids.\n\n\nDesign/methodology/approach\nThe authors investigated data for 2.404 open procurement tenders in Greece for the years 2018–2021. Using Δt as the grouping factor, the authors defined two samples based on the European Union time limits for the receipt of tenders. Group 1 (Δt ≤ 35) contains all tenders for which the contracting authorities (CAs) have chosen to limit themselves to the minimum number of days allowed by law. Group 2 (Δt>35) includes the remaining tenders where CAs have chosen to keep their notices open for periods beyond the existing minimum time limits, as they are encouraged to do by law.\n\n\nFindings\nA Mann–Whitney U test, in combination with graphical analysis, revealed that CAs from Group 2 tend to enjoy more bids per tender, that is, more intense competition.\n\n\nSocial implications\nThe paper allows decision-makers and legislators to understand the relationship between the time CAs choose to keep their notices open for bidding and the number of bidders in each tender, that is, competition, which according to other authors, affects the outcomes of public procurement procedures.\n\n\nOriginality/value\nThe paper fills the research gap regarding the relationship between time for preparation and the number of bids in each tender.\n","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":"1 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of the time limits for the receipt of tenders on the number of bidders: evidence from public procurement in Greece\",\"authors\":\"Andreas Christos Pliatsidis\",\"doi\":\"10.1108/jopp-05-2022-0025\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThe purpose of this paper is to examine how the period for which a public procurement notice remains open for bidding (Δt) affects the number of bids.\\n\\n\\nDesign/methodology/approach\\nThe authors investigated data for 2.404 open procurement tenders in Greece for the years 2018–2021. Using Δt as the grouping factor, the authors defined two samples based on the European Union time limits for the receipt of tenders. Group 1 (Δt ≤ 35) contains all tenders for which the contracting authorities (CAs) have chosen to limit themselves to the minimum number of days allowed by law. Group 2 (Δt>35) includes the remaining tenders where CAs have chosen to keep their notices open for periods beyond the existing minimum time limits, as they are encouraged to do by law.\\n\\n\\nFindings\\nA Mann–Whitney U test, in combination with graphical analysis, revealed that CAs from Group 2 tend to enjoy more bids per tender, that is, more intense competition.\\n\\n\\nSocial implications\\nThe paper allows decision-makers and legislators to understand the relationship between the time CAs choose to keep their notices open for bidding and the number of bidders in each tender, that is, competition, which according to other authors, affects the outcomes of public procurement procedures.\\n\\n\\nOriginality/value\\nThe paper fills the research gap regarding the relationship between time for preparation and the number of bids in each tender.\\n\",\"PeriodicalId\":45136,\"journal\":{\"name\":\"Journal of Public Procurement\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Public Procurement\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jopp-05-2022-0025\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"PUBLIC ADMINISTRATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Procurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jopp-05-2022-0025","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 0

摘要

本文的目的是研究公共采购通知开放招标的期限(Δt)如何影响投标数量。设计/方法/方法作者调查了2018-2021年希腊2.404个公开采购招标的数据。作者使用Δt作为分组因子,根据欧洲联盟收到投标书的时间限制定义了两个样本。第1组(Δt≤35)包含所有订约当局(ca)选择将自己限制在法律允许的最低天数内的投标。第2组(Δt>35)包括其余核证机关选择在超过现行最低时限的时间内继续开放通知的投标,因为法律鼓励核证机关这样做。Mann-Whitney U测试结合图形分析显示,来自第二组的ca往往在每次投标中获得更多的投标,即更激烈的竞争。社会意义本文使决策者和立法者能够理解ca选择将其公告公开招标的时间与每次招标中的投标人数量之间的关系,也就是说,根据其他作者的观点,竞争会影响公共采购程序的结果。原创性/价值本文填补了关于准备时间与每次投标中投标数之间关系的研究空白。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Impact of the time limits for the receipt of tenders on the number of bidders: evidence from public procurement in Greece
Purpose The purpose of this paper is to examine how the period for which a public procurement notice remains open for bidding (Δt) affects the number of bids. Design/methodology/approach The authors investigated data for 2.404 open procurement tenders in Greece for the years 2018–2021. Using Δt as the grouping factor, the authors defined two samples based on the European Union time limits for the receipt of tenders. Group 1 (Δt ≤ 35) contains all tenders for which the contracting authorities (CAs) have chosen to limit themselves to the minimum number of days allowed by law. Group 2 (Δt>35) includes the remaining tenders where CAs have chosen to keep their notices open for periods beyond the existing minimum time limits, as they are encouraged to do by law. Findings A Mann–Whitney U test, in combination with graphical analysis, revealed that CAs from Group 2 tend to enjoy more bids per tender, that is, more intense competition. Social implications The paper allows decision-makers and legislators to understand the relationship between the time CAs choose to keep their notices open for bidding and the number of bidders in each tender, that is, competition, which according to other authors, affects the outcomes of public procurement procedures. Originality/value The paper fills the research gap regarding the relationship between time for preparation and the number of bids in each tender.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Public Procurement
Journal of Public Procurement PUBLIC ADMINISTRATION-
CiteScore
4.40
自引率
4.00%
发文量
13
期刊介绍: The Journal of Public Procurement (JOPP) seeks to further the understanding of public procurement. JOPP publishes original, high-quality research that explores the theories and practices of public procurement. The journal ensures that high-quality research is collected and disseminated widely to both academics and practitioners, and provides a forum for debate. It covers all subjects relating to the purchase of goods, services and works by public organizations at a local, regional, national and international level. JOPP is multi-disciplinary, with a broad approach towards methods and styles of research as well as the level of issues addressed. The Journal welcomes the submission of papers from researchers internationally. The journal welcomes research papers, narrative essays, exemplar cases, forums, and book reviews.
期刊最新文献
Approaching transcendence: a conceptual discussion on procurement fraud, education, professionalism maturity, ethics and implications Procurement practices and operational performance: a study of linear and curvilinear relationships in a developing economy The predicting role of sustainable supplier selection on lead-time performance in public procurement: relational capability as a moderator Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa Streamlining professionalisation in public procurement: Romanian competency frameworks as a case study (Part B)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1