调查从Owner到承包商延迟建设项目付款的影响

Teknik Pub Date : 2022-08-29 DOI:10.14710/teknik.v43i2.45876
J. U. D. Hatmoko, Arif Hidayat, M. Zachari, Satria Sentik Herman Merukh
{"title":"调查从Owner到承包商延迟建设项目付款的影响","authors":"J. U. D. Hatmoko, Arif Hidayat, M. Zachari, Satria Sentik Herman Merukh","doi":"10.14710/teknik.v43i2.45876","DOIUrl":null,"url":null,"abstract":"[Title: Investigating The Impact of Construction Project Delay Payment from The Owner to The Contractor] Existing literature shows that project delays are still a common problem in many countries. Generally, factors causing project delays are mostly attributed to the contractor's responsibility. Meanwhile, it is still rare to find research that examines the causal factors of project delays from the owner's side. This study intends to investigate the effect of late payments from the owner to the contractor in construction projects. The preliminary study was conducted through an interview, followed by data collection through questionnaires distributed to 80 contractors as the respondents, using a mixed method of qualitative and quantitative analysis techniques. The results show that the three biggest impacts are late payments by contractors to subcontractors and suppliers, disruption of contractor cashflows, and difficulty in obtaining materials. The main causes of delays in owner payments include complex bureaucracy in submitting payments, incomplete document requirements, and poor quality of work. The solutions taken by the contractor include, among others, billing the owner continuously, demanding the owner to pay the interest due to late payments, and delaying payment obligations to suppliers and subcontractors. The results of this study indicate that late payment from the owner is still a serious problem in the construction industry in Indonesia. The findings of this study serve as inputs for stakeholders in the construction industry to understand the problems of late owner payment and their impact on the project, as well as to formulate appropriate preventive strategies.","PeriodicalId":30795,"journal":{"name":"Teknik","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigasi Pengaruh Keterlambatan Pembayaran Proyek Konstruksi dari Owner kepada Kontraktor\",\"authors\":\"J. U. D. Hatmoko, Arif Hidayat, M. Zachari, Satria Sentik Herman Merukh\",\"doi\":\"10.14710/teknik.v43i2.45876\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"[Title: Investigating The Impact of Construction Project Delay Payment from The Owner to The Contractor] Existing literature shows that project delays are still a common problem in many countries. Generally, factors causing project delays are mostly attributed to the contractor's responsibility. Meanwhile, it is still rare to find research that examines the causal factors of project delays from the owner's side. This study intends to investigate the effect of late payments from the owner to the contractor in construction projects. The preliminary study was conducted through an interview, followed by data collection through questionnaires distributed to 80 contractors as the respondents, using a mixed method of qualitative and quantitative analysis techniques. The results show that the three biggest impacts are late payments by contractors to subcontractors and suppliers, disruption of contractor cashflows, and difficulty in obtaining materials. The main causes of delays in owner payments include complex bureaucracy in submitting payments, incomplete document requirements, and poor quality of work. The solutions taken by the contractor include, among others, billing the owner continuously, demanding the owner to pay the interest due to late payments, and delaying payment obligations to suppliers and subcontractors. The results of this study indicate that late payment from the owner is still a serious problem in the construction industry in Indonesia. The findings of this study serve as inputs for stakeholders in the construction industry to understand the problems of late owner payment and their impact on the project, as well as to formulate appropriate preventive strategies.\",\"PeriodicalId\":30795,\"journal\":{\"name\":\"Teknik\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Teknik\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14710/teknik.v43i2.45876\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Teknik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14710/teknik.v43i2.45876","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

[题目:调查业主对承包商的建设项目延期付款的影响]现有文献表明,项目延期在许多国家仍然是一个普遍的问题。一般来说,造成项目延误的因素主要归咎于承包商的责任。同时,从业主方角度考察项目延期原因的研究还不多见。本研究旨在探讨建筑工程中业主对承包商逾期付款的影响。初步研究通过访谈进行,随后通过向80家承包商分发问卷的方式收集数据,采用定性和定量分析技术相结合的方法。结果表明,三个最大的影响是承包商对分包商和供应商的延迟付款,承包商现金流中断,以及难以获得材料。业主付款延迟的主要原因包括提交付款的复杂官僚主义,文件要求不完整以及工作质量差。承包商采取的解决方案包括:持续向业主开票、要求业主支付因逾期付款而产生的利息、延迟对供应商和分包商的付款义务等。本研究的结果表明,业主逾期付款在印尼建筑业仍然是一个严重的问题。研究结果有助建造业持份者了解业主逾期付款的问题及其对工程项目的影响,并制订适当的预防策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Investigasi Pengaruh Keterlambatan Pembayaran Proyek Konstruksi dari Owner kepada Kontraktor
[Title: Investigating The Impact of Construction Project Delay Payment from The Owner to The Contractor] Existing literature shows that project delays are still a common problem in many countries. Generally, factors causing project delays are mostly attributed to the contractor's responsibility. Meanwhile, it is still rare to find research that examines the causal factors of project delays from the owner's side. This study intends to investigate the effect of late payments from the owner to the contractor in construction projects. The preliminary study was conducted through an interview, followed by data collection through questionnaires distributed to 80 contractors as the respondents, using a mixed method of qualitative and quantitative analysis techniques. The results show that the three biggest impacts are late payments by contractors to subcontractors and suppliers, disruption of contractor cashflows, and difficulty in obtaining materials. The main causes of delays in owner payments include complex bureaucracy in submitting payments, incomplete document requirements, and poor quality of work. The solutions taken by the contractor include, among others, billing the owner continuously, demanding the owner to pay the interest due to late payments, and delaying payment obligations to suppliers and subcontractors. The results of this study indicate that late payment from the owner is still a serious problem in the construction industry in Indonesia. The findings of this study serve as inputs for stakeholders in the construction industry to understand the problems of late owner payment and their impact on the project, as well as to formulate appropriate preventive strategies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
8
审稿时长
12 weeks
期刊最新文献
Studi Komparasi Dampak Lingkungan Produksi Campuran Aspal Hangat Modifikasi Polimer EVA dengan Campuran Aspal Panas Skala Laboratorium Menggunakan Life Cycle Assessment (LCA) Deteksi Kerusakan Jalan Menggunakan Pengolahan Citra Deep Learning di Kota Semarang Metode Weight In Motion (WIM) dalam Menentukan Indikator Utama Penyebab Kongesti Perjalanan Truk Petikemas dari Pelabuhan Tanjung Emas ke Wilayah Hinterland Perbaikan Kualitas Energi Biomassa Kayu Jati Menggunakan Torefaksi Microwave Untuk Produksi Bioarang Pengaruh Variasi Temperatur Solution Treatment pada Kekerasan dan Presipitat Paduan Co-30Cr-5Mo-0,32C-0,23N
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1