大型能源设施建设中的时间与成本管理

Q4 Mathematics Philippine Statistician Pub Date : 2022-03-31 DOI:10.17762/msea.v71i2.76
Nikolay Y. Kuzmin, Andrey A. Mihasek
{"title":"大型能源设施建设中的时间与成本管理","authors":"Nikolay Y. Kuzmin, Andrey A. Mihasek","doi":"10.17762/msea.v71i2.76","DOIUrl":null,"url":null,"abstract":"The article deals with the problems of time and cost management in the construction of large energy facilities. The practical value of standards in the field of time and cost management in the construction of large energy facilities is often questioned by specialists in various fields of project activity. Practitioners at lower and intermediate levels often complain about the lack of clear and effective tools for solving specific problems in project management practice. However, the skillful application of standards can not only increase the likelihood of success for a wide range of diverse projects of large energy facilities with obtaining expected business values \"at the output\" of the project. The purpose of this study was to study the features of management terms and cost in the construction of large energy facilities. The objectives of the study included establishing links between the methods recommended by the project management body of knowledge (PMBoK) guidelines for determining the project budget and the methods used in practice for determining the cost of construction projects for large energy facilities, formalized in the current regulatory documents and state building codes of Russia. For this (according to the PMBoK standard), the basic methodological foundations of the project cost management process, its components and characteristic features were determined. The main stages of the life cycle of construction projects of large energy facilities, in which the cost of design work is assessed, are determined, the goals of such an assessment and the project participants who carry it out are determined. As a result, a complete methodological identity was established between the methods for assessing the project cost of large energy facilities recommended by the PMBoK standard and the methods for determining the cost of construction specified in the current regulatory documents in the construction industry in Russia.","PeriodicalId":37943,"journal":{"name":"Philippine Statistician","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Time and Cost Management in the Construction of Large Energy Facilities\",\"authors\":\"Nikolay Y. Kuzmin, Andrey A. Mihasek\",\"doi\":\"10.17762/msea.v71i2.76\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article deals with the problems of time and cost management in the construction of large energy facilities. The practical value of standards in the field of time and cost management in the construction of large energy facilities is often questioned by specialists in various fields of project activity. Practitioners at lower and intermediate levels often complain about the lack of clear and effective tools for solving specific problems in project management practice. However, the skillful application of standards can not only increase the likelihood of success for a wide range of diverse projects of large energy facilities with obtaining expected business values \\\"at the output\\\" of the project. The purpose of this study was to study the features of management terms and cost in the construction of large energy facilities. The objectives of the study included establishing links between the methods recommended by the project management body of knowledge (PMBoK) guidelines for determining the project budget and the methods used in practice for determining the cost of construction projects for large energy facilities, formalized in the current regulatory documents and state building codes of Russia. For this (according to the PMBoK standard), the basic methodological foundations of the project cost management process, its components and characteristic features were determined. The main stages of the life cycle of construction projects of large energy facilities, in which the cost of design work is assessed, are determined, the goals of such an assessment and the project participants who carry it out are determined. As a result, a complete methodological identity was established between the methods for assessing the project cost of large energy facilities recommended by the PMBoK standard and the methods for determining the cost of construction specified in the current regulatory documents in the construction industry in Russia.\",\"PeriodicalId\":37943,\"journal\":{\"name\":\"Philippine Statistician\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Philippine Statistician\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17762/msea.v71i2.76\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Mathematics\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Philippine Statistician","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17762/msea.v71i2.76","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Mathematics","Score":null,"Total":0}
引用次数: 1

摘要

本文论述了大型能源设施建设中的时间和成本管理问题。大型能源设施建设中时间和成本管理领域的标准的实际价值经常受到项目活动各个领域专家的质疑。初级和中级从业者经常抱怨在项目管理实践中缺乏明确有效的工具来解决具体问题。然而,标准的熟练应用不仅可以增加大型能源设施的各种项目的成功可能性,并在项目的“产出”中获得预期的商业价值。本研究的目的是研究大型能源设施建设中管理条款和成本的特点。该研究的目标包括建立项目管理知识机构(PMBoK)指导方针建议的确定项目预算的方法与俄罗斯现行监管文件和国家建筑规范中正式规定的确定大型能源设施建设项目成本的实践方法之间的联系。为此(根据PMBoK标准),确定了项目成本管理过程的基本方法基础、组成部分和特征。确定了大型能源设施建设项目生命周期中评估设计工作成本的主要阶段,确定了此类评估的目标和实施该评估的项目参与者。因此,在PMBoK标准推荐的大型能源设施项目成本评估方法和俄罗斯建筑业现行监管文件中规定的建筑成本确定方法之间建立了完整的方法认同。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Time and Cost Management in the Construction of Large Energy Facilities
The article deals with the problems of time and cost management in the construction of large energy facilities. The practical value of standards in the field of time and cost management in the construction of large energy facilities is often questioned by specialists in various fields of project activity. Practitioners at lower and intermediate levels often complain about the lack of clear and effective tools for solving specific problems in project management practice. However, the skillful application of standards can not only increase the likelihood of success for a wide range of diverse projects of large energy facilities with obtaining expected business values "at the output" of the project. The purpose of this study was to study the features of management terms and cost in the construction of large energy facilities. The objectives of the study included establishing links between the methods recommended by the project management body of knowledge (PMBoK) guidelines for determining the project budget and the methods used in practice for determining the cost of construction projects for large energy facilities, formalized in the current regulatory documents and state building codes of Russia. For this (according to the PMBoK standard), the basic methodological foundations of the project cost management process, its components and characteristic features were determined. The main stages of the life cycle of construction projects of large energy facilities, in which the cost of design work is assessed, are determined, the goals of such an assessment and the project participants who carry it out are determined. As a result, a complete methodological identity was established between the methods for assessing the project cost of large energy facilities recommended by the PMBoK standard and the methods for determining the cost of construction specified in the current regulatory documents in the construction industry in Russia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Philippine Statistician
Philippine Statistician Mathematics-Statistics and Probability
CiteScore
0.50
自引率
0.00%
发文量
92
期刊介绍: The Journal aims to provide a media for the dissemination of research by statisticians and researchers using statistical method in resolving their research problems. While a broad spectrum of topics will be entertained, those with original contribution to the statistical science or those that illustrates novel applications of statistics in solving real-life problems will be prioritized. The scope includes, but is not limited to the following topics:  Official Statistics  Computational Statistics  Simulation Studies  Mathematical Statistics  Survey Sampling  Statistics Education  Time Series Analysis  Biostatistics  Nonparametric Methods  Experimental Designs and Analysis  Econometric Theory and Applications  Other Applications
期刊最新文献
Mechanical Analysis Carrired out to a Single Basin Solar Still Integrated with Nano -Composite PCM Analyzing the Impact of Welfare Measures on Job Performance and Job Satisfaction of the Teachers Design and Performance Assessment of Split Gate Dielectric Modulated Junction less TFET Variation of Hfo2 by the Divided Gate Insulator for High Sensitivity Using Tcad Simulation Perpend, Pair, And Partake (3ps) Strategy: A Collaborative Approach in Teaching Mathematics Kurdish Language Sentiment Analysis: Problems and Challenges
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1