解开尼日利亚基础设施发展采购管理的障碍:项目的陷阱和前景

IF 1.1 Q4 MANAGEMENT Property Management Pub Date : 2022-04-05 DOI:10.1108/pm-11-2021-0103
Andrew Ebekozien, M. S. Samsurijan, C. Aigbavboa, E. Awe, G. C. Amadi, Faith Ebekozien Emuchay
{"title":"解开尼日利亚基础设施发展采购管理的障碍:项目的陷阱和前景","authors":"Andrew Ebekozien, M. S. Samsurijan, C. Aigbavboa, E. Awe, G. C. Amadi, Faith Ebekozien Emuchay","doi":"10.1108/pm-11-2021-0103","DOIUrl":null,"url":null,"abstract":"PurposeProcurement management in infrastructure development has gained considerable attention in developing countries. It is because of the success in the developed nations. Studies have shown that Nigeria's infrastructure development needs far exceed its current provision. Also, studies are scarce to reveal whether procurement management has been successful in infrastructure development projects in Nigeria. Therefore, this paper investigated the root cause of the perceived encumbrances impeding procurement management in infrastructure development projects and proffered policy measures to improve future Nigeria's infrastructure development.Design/methodology/approachData were collected via unexplored exploratory virtual interviews and selected cases from secondary sources. The engaged construction and engineering consultants have been involved in the procurement management of infrastructure projects in Nigeria. Thematic analysis was adopted to analyse the collected data.FindingsThe root causes of the pitfalls that emerged from the study include lack of competition and transparency, embezzlement and mismanagement of public funds, snail speed bureaucracy and bottleneck and lack of skills and knowledge. Others are collusion/bid-rigging/price-fixing/cartel formation, corruption, lack of professionalism, unbridled politicking, embezzlement and mismanagement of public funds, incompetence of tender boards, lack of patriotism to national service and lack of government organisations’ procurement capacity.Research limitations/implicationsThis paper is restricted to unravelling the encumbrances in procurement management of Nigeria's infrastructure development projects. Future research is desirable to adopt a quantitative approach for more extensive coverage and validate findings from this paper.Practical implicationsThe paper findings, including those learnt from each case study evaluated, would undoubtedly influence policymakers and construction and engineering practitioners on the key strategies to employ in implementing future procurement management in Nigeria's infrastructure development projects.Originality/valueThis paper would assist policymakers and other stakeholders desirous of improved infrastructure to focus their priorities in mitigating the identified root cause hindering procurement management in Nigeria's infrastructure management.","PeriodicalId":46102,"journal":{"name":"Property Management","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2022-04-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Unravelling the encumbrances in procurement management of Nigeria's infrastructure development: pitfalls and prospects of projects\",\"authors\":\"Andrew Ebekozien, M. S. Samsurijan, C. Aigbavboa, E. Awe, G. C. Amadi, Faith Ebekozien Emuchay\",\"doi\":\"10.1108/pm-11-2021-0103\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeProcurement management in infrastructure development has gained considerable attention in developing countries. It is because of the success in the developed nations. Studies have shown that Nigeria's infrastructure development needs far exceed its current provision. Also, studies are scarce to reveal whether procurement management has been successful in infrastructure development projects in Nigeria. Therefore, this paper investigated the root cause of the perceived encumbrances impeding procurement management in infrastructure development projects and proffered policy measures to improve future Nigeria's infrastructure development.Design/methodology/approachData were collected via unexplored exploratory virtual interviews and selected cases from secondary sources. The engaged construction and engineering consultants have been involved in the procurement management of infrastructure projects in Nigeria. Thematic analysis was adopted to analyse the collected data.FindingsThe root causes of the pitfalls that emerged from the study include lack of competition and transparency, embezzlement and mismanagement of public funds, snail speed bureaucracy and bottleneck and lack of skills and knowledge. Others are collusion/bid-rigging/price-fixing/cartel formation, corruption, lack of professionalism, unbridled politicking, embezzlement and mismanagement of public funds, incompetence of tender boards, lack of patriotism to national service and lack of government organisations’ procurement capacity.Research limitations/implicationsThis paper is restricted to unravelling the encumbrances in procurement management of Nigeria's infrastructure development projects. Future research is desirable to adopt a quantitative approach for more extensive coverage and validate findings from this paper.Practical implicationsThe paper findings, including those learnt from each case study evaluated, would undoubtedly influence policymakers and construction and engineering practitioners on the key strategies to employ in implementing future procurement management in Nigeria's infrastructure development projects.Originality/valueThis paper would assist policymakers and other stakeholders desirous of improved infrastructure to focus their priorities in mitigating the identified root cause hindering procurement management in Nigeria's infrastructure management.\",\"PeriodicalId\":46102,\"journal\":{\"name\":\"Property Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2022-04-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Property Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/pm-11-2021-0103\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Property Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/pm-11-2021-0103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 3

摘要

在发展中国家,基础设施发展中的采购管理已引起相当大的关注。这是因为发达国家的成功。研究表明,尼日利亚的基础设施发展需求远远超过其现有的供应。此外,很少有研究表明采购管理在尼日利亚的基础设施发展项目中是否成功。因此,本文调查了基础设施建设项目中阻碍采购管理的感知障碍的根本原因,并提出了改善未来尼日利亚基础设施发展的政策措施。设计/方法/方法通过未探索的探索性虚拟访谈和从二手来源选择的案例收集数据。所聘用的建筑和工程顾问参与了尼日利亚基础设施项目的采购管理。采用专题分析法对收集到的数据进行分析。研究发现,造成这些问题的根本原因包括缺乏竞争和透明度、公款挪用和管理不善、官僚作风缓慢、瓶颈以及缺乏技能和知识。其他包括串通/串通投标/操纵价格/形成卡特尔、腐败、缺乏专业精神、无约束的政治活动、贪污和公共资金管理不善、投标委员会无能、对国家服务缺乏爱国精神以及政府机构缺乏采购能力。研究局限/启示本文仅限于揭示尼日利亚基础设施发展项目采购管理中的障碍。未来的研究是可取的,采用定量的方法,以更广泛的覆盖和验证从本文的发现。本文的研究结果,包括从评估的每个案例研究中学到的,无疑将影响决策者和建筑和工程从业者在尼日利亚基础设施发展项目中实施未来采购管理时采用的关键策略。原创性/价值本文将帮助希望改善基础设施的政策制定者和其他利益相关者将重点放在减轻尼日利亚基础设施管理中阻碍采购管理的确定根源上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Unravelling the encumbrances in procurement management of Nigeria's infrastructure development: pitfalls and prospects of projects
PurposeProcurement management in infrastructure development has gained considerable attention in developing countries. It is because of the success in the developed nations. Studies have shown that Nigeria's infrastructure development needs far exceed its current provision. Also, studies are scarce to reveal whether procurement management has been successful in infrastructure development projects in Nigeria. Therefore, this paper investigated the root cause of the perceived encumbrances impeding procurement management in infrastructure development projects and proffered policy measures to improve future Nigeria's infrastructure development.Design/methodology/approachData were collected via unexplored exploratory virtual interviews and selected cases from secondary sources. The engaged construction and engineering consultants have been involved in the procurement management of infrastructure projects in Nigeria. Thematic analysis was adopted to analyse the collected data.FindingsThe root causes of the pitfalls that emerged from the study include lack of competition and transparency, embezzlement and mismanagement of public funds, snail speed bureaucracy and bottleneck and lack of skills and knowledge. Others are collusion/bid-rigging/price-fixing/cartel formation, corruption, lack of professionalism, unbridled politicking, embezzlement and mismanagement of public funds, incompetence of tender boards, lack of patriotism to national service and lack of government organisations’ procurement capacity.Research limitations/implicationsThis paper is restricted to unravelling the encumbrances in procurement management of Nigeria's infrastructure development projects. Future research is desirable to adopt a quantitative approach for more extensive coverage and validate findings from this paper.Practical implicationsThe paper findings, including those learnt from each case study evaluated, would undoubtedly influence policymakers and construction and engineering practitioners on the key strategies to employ in implementing future procurement management in Nigeria's infrastructure development projects.Originality/valueThis paper would assist policymakers and other stakeholders desirous of improved infrastructure to focus their priorities in mitigating the identified root cause hindering procurement management in Nigeria's infrastructure management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Property Management
Property Management MANAGEMENT-
CiteScore
2.70
自引率
20.00%
发文量
36
期刊介绍: Property Management publishes: ■Refereed papers on important current trends and reserach issues ■Digests of market reports and data ■In-depth analysis of a specific area ■Legal updates on judgments in landlord and tenant law ■Regular book and internet reviews providing an overview of the growing body of property market research
期刊最新文献
Facilities management as moderator in improving waste separation behaviour among households Contributions of greenery toward student residential mobility: findings from purpose-built university student housing in Northern Ghana Continuous briefing for the future university campus: an evidence-based approach to match spatial supply and demand Stakeholder assessment of design quality indicators for community centers: a Delphi approach The role of gained trust: effects on intrinsic motivation, person-job fit and turnover intentions among real estate brokers
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1