根据地震风险和施工成本优先考虑配水管更新

IF 0.8 4区 工程技术 Q4 ENGINEERING, CHEMICAL Membrane Water Treatment Pub Date : 2021-09-01 DOI:10.12989/MWT.2021.12.5.195
H. Youn, H. Oh, Dooil Kim
{"title":"根据地震风险和施工成本优先考虑配水管更新","authors":"H. Youn, H. Oh, Dooil Kim","doi":"10.12989/MWT.2021.12.5.195","DOIUrl":null,"url":null,"abstract":"Natural disasters such as earthquakes can cause damage to water distribution pipe, resulting in water interruption. For a contingency plan for earthquakes, calculating the possibility of failure and the consequence of failure are necessary. The empirical formula for the vulnerability of water distribution pipe after earthquake was developed considering deterioration effect with aging in this study. The degree of water outage was assumed to be a consequence of failure. The earthquake risk with pipe aging was obtained through the product of them. Although the risk alone might be used to prioritize pipe network improvement, it was recommended to consider the construction cost as well. It was also proposed to use a score-based method by graphically tabulating construction cost and risk. The methodology proposed was demonstrated on a real-scale water distribution pipe in Korea. The improved prioritization using the scoring method will help create a future earthquake preparedness plan for a water distribution system.","PeriodicalId":18416,"journal":{"name":"Membrane Water Treatment","volume":"12 1","pages":"195"},"PeriodicalIF":0.8000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Prioritizing water distribution pipe renewal based on seismic risk and construction cost\",\"authors\":\"H. Youn, H. Oh, Dooil Kim\",\"doi\":\"10.12989/MWT.2021.12.5.195\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Natural disasters such as earthquakes can cause damage to water distribution pipe, resulting in water interruption. For a contingency plan for earthquakes, calculating the possibility of failure and the consequence of failure are necessary. The empirical formula for the vulnerability of water distribution pipe after earthquake was developed considering deterioration effect with aging in this study. The degree of water outage was assumed to be a consequence of failure. The earthquake risk with pipe aging was obtained through the product of them. Although the risk alone might be used to prioritize pipe network improvement, it was recommended to consider the construction cost as well. It was also proposed to use a score-based method by graphically tabulating construction cost and risk. The methodology proposed was demonstrated on a real-scale water distribution pipe in Korea. The improved prioritization using the scoring method will help create a future earthquake preparedness plan for a water distribution system.\",\"PeriodicalId\":18416,\"journal\":{\"name\":\"Membrane Water Treatment\",\"volume\":\"12 1\",\"pages\":\"195\"},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2021-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Membrane Water Treatment\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.12989/MWT.2021.12.5.195\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CHEMICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Membrane Water Treatment","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.12989/MWT.2021.12.5.195","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CHEMICAL","Score":null,"Total":0}
引用次数: 0

摘要

地震等自然灾害会对配水管造成破坏,造成供水中断。对于一个地震应急计划,计算失败的可能性和失败的后果是必要的。考虑老化劣化效应,建立了配水管地震后易损性的经验公式。供水中断的程度被认为是故障的后果。通过二者的乘积,得到了管道老化的地震危险性。虽然风险可以单独用于管网改进的优先级,但建议也考虑建设成本。还提出了采用基于分数的方法,将建筑成本和风险图表化。该方法在韩国的一个实际配水管道上进行了验证。使用评分方法改进的优先级排序将有助于为供水系统制定未来的地震准备计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Prioritizing water distribution pipe renewal based on seismic risk and construction cost
Natural disasters such as earthquakes can cause damage to water distribution pipe, resulting in water interruption. For a contingency plan for earthquakes, calculating the possibility of failure and the consequence of failure are necessary. The empirical formula for the vulnerability of water distribution pipe after earthquake was developed considering deterioration effect with aging in this study. The degree of water outage was assumed to be a consequence of failure. The earthquake risk with pipe aging was obtained through the product of them. Although the risk alone might be used to prioritize pipe network improvement, it was recommended to consider the construction cost as well. It was also proposed to use a score-based method by graphically tabulating construction cost and risk. The methodology proposed was demonstrated on a real-scale water distribution pipe in Korea. The improved prioritization using the scoring method will help create a future earthquake preparedness plan for a water distribution system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Membrane Water Treatment
Membrane Water Treatment ENGINEERING, CHEMICAL-WATER RESOURCES
CiteScore
1.90
自引率
30.00%
发文量
0
审稿时长
>12 weeks
期刊介绍: The Membrane and Water Treatment(MWT), An International Journal, aims at opening an access to the valuable source of technical information and providing an excellent publication channel for the global community of researchers in Membrane and Water Treatment related area. Specific emphasis of the journal may include but not limited to; the engineering and scientific aspects of understanding the basic mechanisms and applying membranes for water and waste water treatment, such as transport phenomena, surface characteristics, fouling, scaling, desalination, membrane bioreactors, water reuse, and system optimization.
期刊最新文献
Modeling of biofilm growth and the related changes in hydraulic properties of porous media fMWNTs/GO/MnO2 nanocomposites as additives in a membrane for the removal of crystal violet Prioritizing water distribution pipe renewal based on seismic risk and construction cost Comparison of pollutants in stormwater runoff from asphalt and concrete roads Application of graphene, graphene oxide, and boron nitride nanosheets in the water treatment
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1