{"title":"贸易信贷和部分积压条件下非瞬时退化库存的控制","authors":"P. Meena, A. Sharma, G. Kumar","doi":"10.31181/oresta111221122m","DOIUrl":null,"url":null,"abstract":"Inventory management is an extremely difficult task. It has become usual practice for a provider during the last few decades to provide a retailer with a credit term. In this article, a non-instantly degradable products inventory system is built with a price-sensitive demand and a Weibull credit term allocation reduction rate. Some backlogged deficiencies are permitted. The aim is to maximize the total profit in this study by taking three cases into account. Numerical examples, graphical representations and sensitivity analysis demonstrate the application of the approach developed in this study.","PeriodicalId":36055,"journal":{"name":"Operational Research in Engineering Sciences: Theory and Applications","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Control of Non-instantaneous Degrading Inventory under Trade Credit and Partial Backlogging\",\"authors\":\"P. Meena, A. Sharma, G. Kumar\",\"doi\":\"10.31181/oresta111221122m\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Inventory management is an extremely difficult task. It has become usual practice for a provider during the last few decades to provide a retailer with a credit term. In this article, a non-instantly degradable products inventory system is built with a price-sensitive demand and a Weibull credit term allocation reduction rate. Some backlogged deficiencies are permitted. The aim is to maximize the total profit in this study by taking three cases into account. Numerical examples, graphical representations and sensitivity analysis demonstrate the application of the approach developed in this study.\",\"PeriodicalId\":36055,\"journal\":{\"name\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31181/oresta111221122m\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operational Research in Engineering Sciences: Theory and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31181/oresta111221122m","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
Control of Non-instantaneous Degrading Inventory under Trade Credit and Partial Backlogging
Inventory management is an extremely difficult task. It has become usual practice for a provider during the last few decades to provide a retailer with a credit term. In this article, a non-instantly degradable products inventory system is built with a price-sensitive demand and a Weibull credit term allocation reduction rate. Some backlogged deficiencies are permitted. The aim is to maximize the total profit in this study by taking three cases into account. Numerical examples, graphical representations and sensitivity analysis demonstrate the application of the approach developed in this study.