{"title":"中国机场航站楼建设工期估算:考虑案例检索方法和案例保留策略的基于案例的推理模型","authors":"Mingxiao Li, Guangbin Wang, Dongping Cao, Jide Sun, Guangshe Jia","doi":"10.1061/jcemd4.coeng-13168","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":50219,"journal":{"name":"Journal of Construction Engineering and Management","volume":" ","pages":""},"PeriodicalIF":4.1000,"publicationDate":"2023-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Construction Duration Estimation for Airport Terminals in China: Case-Based Reasoning Model Considering Case Retrieval Methods and Case Retention Strategies\",\"authors\":\"Mingxiao Li, Guangbin Wang, Dongping Cao, Jide Sun, Guangshe Jia\",\"doi\":\"10.1061/jcemd4.coeng-13168\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":50219,\"journal\":{\"name\":\"Journal of Construction Engineering and Management\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":4.1000,\"publicationDate\":\"2023-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1061/jcemd4.coeng-13168\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Construction Engineering and Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1061/jcemd4.coeng-13168","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Construction Duration Estimation for Airport Terminals in China: Case-Based Reasoning Model Considering Case Retrieval Methods and Case Retention Strategies
期刊介绍:
The Journal of Construction Engineering and Management publishes quality papers that aim to advance the science of construction engineering, harmonize construction practices with design theories, and further education and research in construction engineering and management. Topics include, but are not limited to, the following: construction material handling, equipment, production planning, specifications, scheduling, estimating, cost control, quality control, labor productivity, inspection, contract administration, construction management, computer applications, and environmental concerns.