{"title":"新冠肺炎疫情和根据FIDIC一般条款和条件根据《公共采购法》签订的建筑工程合同","authors":"Bójko Justyna","doi":"10.35117/a_eng_20_06-07-08_02","DOIUrl":null,"url":null,"abstract":"The COVID-19 epidemic does not stop investment processes. Moreover, the stimulation of the economy will consist, inter alia, in the strong stimulation of the public investment sector. Therefore, entrepreneurs who currently meet the challenges will not cease to fulfill their obligations and will meet the contractual conditions have a chance to implement further contracts - otherwise, they risk being excluded from future proceedings.","PeriodicalId":52762,"journal":{"name":"Przeglad Komunikacyjny","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The COVID-19 epidemic and contracts for construction works concluded on the general terms and conditions of FIDIC under the Act on Public Procurement\",\"authors\":\"Bójko Justyna\",\"doi\":\"10.35117/a_eng_20_06-07-08_02\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The COVID-19 epidemic does not stop investment processes. Moreover, the stimulation of the economy will consist, inter alia, in the strong stimulation of the public investment sector. Therefore, entrepreneurs who currently meet the challenges will not cease to fulfill their obligations and will meet the contractual conditions have a chance to implement further contracts - otherwise, they risk being excluded from future proceedings.\",\"PeriodicalId\":52762,\"journal\":{\"name\":\"Przeglad Komunikacyjny\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Przeglad Komunikacyjny\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.35117/a_eng_20_06-07-08_02\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Przeglad Komunikacyjny","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35117/a_eng_20_06-07-08_02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The COVID-19 epidemic and contracts for construction works concluded on the general terms and conditions of FIDIC under the Act on Public Procurement
The COVID-19 epidemic does not stop investment processes. Moreover, the stimulation of the economy will consist, inter alia, in the strong stimulation of the public investment sector. Therefore, entrepreneurs who currently meet the challenges will not cease to fulfill their obligations and will meet the contractual conditions have a chance to implement further contracts - otherwise, they risk being excluded from future proceedings.