现代科技型公共建设项目稳健承包商评价标准分类

IF 1.6 Q3 PUBLIC ADMINISTRATION Journal of Public Procurement Pub Date : 2021-03-24 DOI:10.1108/JOPP-06-2020-0053
Ali Raza Khoso, A. Yusof, C. Chai, Muhammad Aslam Laghari
{"title":"现代科技型公共建设项目稳健承包商评价标准分类","authors":"Ali Raza Khoso, A. Yusof, C. Chai, Muhammad Aslam Laghari","doi":"10.1108/JOPP-06-2020-0053","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThe emergence of massive modern technology construction projects is seen to be a real occurrence in Pakistan’s construction industry, which in turn demands a better and systematic way of undertaking the project. Hence, this requires capable contractors to perform the task. A plethora of research studies are carried in the past three decades on the identification of evaluation criteria of contractor’s selection, but the road of modern technology construction projects is still unpaved.\n\n\nDesign/methodology/approach\nThis study strives for the most essential but exhaustive criteria, especially for modern technology construction projects in Pakistan. A pilot survey followed by an exhaustive questionnaire survey was carried out alongside with one-on-one interactions with professional experts serving in various public organizations under public procurement department. A total of 87 attributes were analyzed, correlated, rotated and weighted using exploratory factor analysis for identification of evaluation criteria.\n\n\nFindings\nThe study finds that for modern technology construction projects basic format of contractor’s selection attributes is not extensive. Henceforth, the most robust, comprehensive and precise assessment is required for such modern technology construction projects. Consequently, four inimitable sets of evaluation criteria groups are designed keeping in view the growing demands of public projects around the globe.\n\n\nResearch limitations/implications\nThe research work added a novel contribution in this research area which is in quest of resolutions from the past three decades. This research opens the novel avenues in the future in terms of designing the evaluation criteria while keeping the project demands and scope in mind.\n\n\nSocial implications\nThe research is a blueprint for the construction organizations and other authorities especially to those agencies involved in the modern construction technology projects. This eye-opening work will further stimulate the clients to focus on not only the designing phase but also the execution part of such advanced construction projects which turn in the successful project outcome.\n\n\nOriginality/value\nThe larger number of past studies addressed so for from the last couple of decades is very useful to a certain extend for instance for small to medium-sized traditional construction projects. This research delineates the future to call upon the most alarming future issues and consequences of selecting the traditional contractors for their advanced projects. Being premier research in this realm, the study filled the gap of evaluating the contractors inimitably compared to what was practiced in the past.\n","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2021-03-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Robust contractor evaluation criteria classification for modern technology public construction projects\",\"authors\":\"Ali Raza Khoso, A. Yusof, C. Chai, Muhammad Aslam Laghari\",\"doi\":\"10.1108/JOPP-06-2020-0053\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThe emergence of massive modern technology construction projects is seen to be a real occurrence in Pakistan’s construction industry, which in turn demands a better and systematic way of undertaking the project. Hence, this requires capable contractors to perform the task. A plethora of research studies are carried in the past three decades on the identification of evaluation criteria of contractor’s selection, but the road of modern technology construction projects is still unpaved.\\n\\n\\nDesign/methodology/approach\\nThis study strives for the most essential but exhaustive criteria, especially for modern technology construction projects in Pakistan. A pilot survey followed by an exhaustive questionnaire survey was carried out alongside with one-on-one interactions with professional experts serving in various public organizations under public procurement department. A total of 87 attributes were analyzed, correlated, rotated and weighted using exploratory factor analysis for identification of evaluation criteria.\\n\\n\\nFindings\\nThe study finds that for modern technology construction projects basic format of contractor’s selection attributes is not extensive. Henceforth, the most robust, comprehensive and precise assessment is required for such modern technology construction projects. Consequently, four inimitable sets of evaluation criteria groups are designed keeping in view the growing demands of public projects around the globe.\\n\\n\\nResearch limitations/implications\\nThe research work added a novel contribution in this research area which is in quest of resolutions from the past three decades. This research opens the novel avenues in the future in terms of designing the evaluation criteria while keeping the project demands and scope in mind.\\n\\n\\nSocial implications\\nThe research is a blueprint for the construction organizations and other authorities especially to those agencies involved in the modern construction technology projects. This eye-opening work will further stimulate the clients to focus on not only the designing phase but also the execution part of such advanced construction projects which turn in the successful project outcome.\\n\\n\\nOriginality/value\\nThe larger number of past studies addressed so for from the last couple of decades is very useful to a certain extend for instance for small to medium-sized traditional construction projects. This research delineates the future to call upon the most alarming future issues and consequences of selecting the traditional contractors for their advanced projects. Being premier research in this realm, the study filled the gap of evaluating the contractors inimitably compared to what was practiced in the past.\\n\",\"PeriodicalId\":45136,\"journal\":{\"name\":\"Journal of Public Procurement\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2021-03-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Public Procurement\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/JOPP-06-2020-0053\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"PUBLIC ADMINISTRATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Procurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/JOPP-06-2020-0053","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 5

摘要

大规模现代技术建设项目的出现被认为是巴基斯坦建筑业的真实情况,这反过来又要求一种更好和系统的方式来承担项目。因此,这需要有能力的承包商来执行任务。近三十年来,对承包商选择评价标准的确定进行了大量的研究,但现代技术建设项目的道路仍未铺就。设计/方法/方法本研究力求最基本但详尽的标准,特别是针对巴基斯坦的现代技术建设项目。首先进行了试点调查,然后进行了详尽的问卷调查,同时与公共采购部门下属各公共机构的专业专家进行了一对一的互动。采用探索性因子分析法对87个属性进行分析、关联、旋转和加权,确定评价标准。研究发现,对于现代技术建设项目,承包商选择属性的基本格式并不广泛。因此,这类现代技术建设项目需要最健全、最全面、最精确的评估。因此,考虑到全球公共项目日益增长的需求,设计了四套独特的评价标准组。研究的局限性/意义本研究工作为过去三十年来寻求解决方案的研究领域增添了新的贡献。本研究为未来在考虑项目需求和范围的情况下设计评估标准开辟了新的途径。社会启示本研究为建筑组织和其他权威机构,特别是从事现代建筑技术项目的机构提供了一份蓝图。这项令人大开眼界的工作将进一步激励客户不仅关注设计阶段,而且关注这些先进建筑项目的执行部分,从而带来成功的项目成果。在过去的几十年里,大量的研究在一定程度上是非常有用的,例如对于中小型的传统建筑项目。本研究描绘了未来,呼吁为其先进项目选择传统承包商的最令人担忧的未来问题和后果。作为这一领域的首要研究,与过去的做法相比,该研究填补了对承包商进行评估的空白。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Robust contractor evaluation criteria classification for modern technology public construction projects
Purpose The emergence of massive modern technology construction projects is seen to be a real occurrence in Pakistan’s construction industry, which in turn demands a better and systematic way of undertaking the project. Hence, this requires capable contractors to perform the task. A plethora of research studies are carried in the past three decades on the identification of evaluation criteria of contractor’s selection, but the road of modern technology construction projects is still unpaved. Design/methodology/approach This study strives for the most essential but exhaustive criteria, especially for modern technology construction projects in Pakistan. A pilot survey followed by an exhaustive questionnaire survey was carried out alongside with one-on-one interactions with professional experts serving in various public organizations under public procurement department. A total of 87 attributes were analyzed, correlated, rotated and weighted using exploratory factor analysis for identification of evaluation criteria. Findings The study finds that for modern technology construction projects basic format of contractor’s selection attributes is not extensive. Henceforth, the most robust, comprehensive and precise assessment is required for such modern technology construction projects. Consequently, four inimitable sets of evaluation criteria groups are designed keeping in view the growing demands of public projects around the globe. Research limitations/implications The research work added a novel contribution in this research area which is in quest of resolutions from the past three decades. This research opens the novel avenues in the future in terms of designing the evaluation criteria while keeping the project demands and scope in mind. Social implications The research is a blueprint for the construction organizations and other authorities especially to those agencies involved in the modern construction technology projects. This eye-opening work will further stimulate the clients to focus on not only the designing phase but also the execution part of such advanced construction projects which turn in the successful project outcome. Originality/value The larger number of past studies addressed so for from the last couple of decades is very useful to a certain extend for instance for small to medium-sized traditional construction projects. This research delineates the future to call upon the most alarming future issues and consequences of selecting the traditional contractors for their advanced projects. Being premier research in this realm, the study filled the gap of evaluating the contractors inimitably compared to what was practiced in the past.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Public Procurement
Journal of Public Procurement PUBLIC ADMINISTRATION-
CiteScore
4.40
自引率
4.00%
发文量
13
期刊介绍: The Journal of Public Procurement (JOPP) seeks to further the understanding of public procurement. JOPP publishes original, high-quality research that explores the theories and practices of public procurement. The journal ensures that high-quality research is collected and disseminated widely to both academics and practitioners, and provides a forum for debate. It covers all subjects relating to the purchase of goods, services and works by public organizations at a local, regional, national and international level. JOPP is multi-disciplinary, with a broad approach towards methods and styles of research as well as the level of issues addressed. The Journal welcomes the submission of papers from researchers internationally. The journal welcomes research papers, narrative essays, exemplar cases, forums, and book reviews.
期刊最新文献
Approaching transcendence: a conceptual discussion on procurement fraud, education, professionalism maturity, ethics and implications Procurement practices and operational performance: a study of linear and curvilinear relationships in a developing economy The predicting role of sustainable supplier selection on lead-time performance in public procurement: relational capability as a moderator Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa Streamlining professionalisation in public procurement: Romanian competency frameworks as a case study (Part B)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1