{"title":"设计了一个基于MCDM模型的建筑工程分包商选择框架","authors":"R. Kishore, Seyed Ali Mousavi Dehmourdi, M. Naik, Malek Hassanpour","doi":"10.31181/oresta20303048k","DOIUrl":null,"url":null,"abstract":"The difficulties discovered in selecting subcontractors via a simple method of bid price as the main factor along with an initial screening of subcontractor properties impressed us to look at a little beyond the existing trend and offer a coherent procedure for this purpose. Despite this, we know that the main factor in outsourcing a project is a bid price and this is in full agreement with the existing circumstances of subcontractor selection in Iran, but the objective of this research was integrating all criteria with the same importance for selecting a subcontractor. The questionnaire was used for collecting initial data of research to pass through the Analytic Hierarchy Process (AHP) and Multi-Criteria Decision-Making (MCDM) model of Simple Additive Weighting (SAW). The findings showed the priority in subcontractors' selection as Hejrat Manesh Izeh (1), Khesht Sazan Karoun (2), Yeganeh saze omid (3), Sakht karan Moongasht (4), Darya Sanat Khavarmianeh (5), Omran mehragane Yosef (6) respectively. The present study offered a coherent procedure to select the subcontractor regardless of the bid price importance and integrating all interfering criteria in the same importance.","PeriodicalId":36055,"journal":{"name":"Operational Research in Engineering Sciences: Theory and Applications","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Designing a framework for Subcontractor’s selection in construction projects using AN MCDM model\",\"authors\":\"R. Kishore, Seyed Ali Mousavi Dehmourdi, M. Naik, Malek Hassanpour\",\"doi\":\"10.31181/oresta20303048k\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The difficulties discovered in selecting subcontractors via a simple method of bid price as the main factor along with an initial screening of subcontractor properties impressed us to look at a little beyond the existing trend and offer a coherent procedure for this purpose. Despite this, we know that the main factor in outsourcing a project is a bid price and this is in full agreement with the existing circumstances of subcontractor selection in Iran, but the objective of this research was integrating all criteria with the same importance for selecting a subcontractor. The questionnaire was used for collecting initial data of research to pass through the Analytic Hierarchy Process (AHP) and Multi-Criteria Decision-Making (MCDM) model of Simple Additive Weighting (SAW). The findings showed the priority in subcontractors' selection as Hejrat Manesh Izeh (1), Khesht Sazan Karoun (2), Yeganeh saze omid (3), Sakht karan Moongasht (4), Darya Sanat Khavarmianeh (5), Omran mehragane Yosef (6) respectively. The present study offered a coherent procedure to select the subcontractor regardless of the bid price importance and integrating all interfering criteria in the same importance.\",\"PeriodicalId\":36055,\"journal\":{\"name\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31181/oresta20303048k\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operational Research in Engineering Sciences: Theory and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31181/oresta20303048k","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 8

摘要

通过以投标价格作为主要因素的简单方法以及对分包商属性的初步筛选来选择分包商时所发现的困难给我们留下了深刻的印象,使我们看到了现有趋势之外的一点,并为此目的提供了一个连贯的程序。尽管如此,我们知道外包项目的主要因素是投标价格,这与伊朗选择分包商的现有情况完全一致,但本研究的目的是将所有选择分包商的标准整合在一起,这些标准对选择分包商具有相同的重要性。利用问卷收集研究的初始数据,通过层次分析法(AHP)和简单加性加权(SAW)的多准则决策(MCDM)模型。结果表明,选择分包商的优先级分别为Hejrat Manesh Izeh(1)、Khesht Sazan Karoun(2)、Yeganeh saze omid(3)、Sakht karan Moongasht(4)、Darya Sanat Khavarmianeh(5)、Omran mehragane Yosef(6)。本研究提供了一个连贯的程序来选择分包商,而不考虑投标价格的重要性,并将所有干扰标准整合在同一重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Designing a framework for Subcontractor’s selection in construction projects using AN MCDM model
The difficulties discovered in selecting subcontractors via a simple method of bid price as the main factor along with an initial screening of subcontractor properties impressed us to look at a little beyond the existing trend and offer a coherent procedure for this purpose. Despite this, we know that the main factor in outsourcing a project is a bid price and this is in full agreement with the existing circumstances of subcontractor selection in Iran, but the objective of this research was integrating all criteria with the same importance for selecting a subcontractor. The questionnaire was used for collecting initial data of research to pass through the Analytic Hierarchy Process (AHP) and Multi-Criteria Decision-Making (MCDM) model of Simple Additive Weighting (SAW). The findings showed the priority in subcontractors' selection as Hejrat Manesh Izeh (1), Khesht Sazan Karoun (2), Yeganeh saze omid (3), Sakht karan Moongasht (4), Darya Sanat Khavarmianeh (5), Omran mehragane Yosef (6) respectively. The present study offered a coherent procedure to select the subcontractor regardless of the bid price importance and integrating all interfering criteria in the same importance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
7.90
自引率
0.00%
发文量
25
审稿时长
15 weeks
期刊最新文献
Non-Pharmaceutical Intervention Strategies to Respond to the COVID-19 Pandemic: Preference Ranking Method Ranking the Recreational Leadership Factors in the Behavioral Dimension and Selection of the Most Ideal Organizational Citizenship Model A Two-Stage Integrated Model for Supplier Selection and Order Allocation: An Application in Dairy Industry Simulation of Job Sequencing for Stochastic Scheduling with a Genetic Algorithm Optimal Load Scheduling of Home Appliances Considering Operation Conditions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1