从局部到整体:将建设项目理解为多团队系统

IF 4.6 Q2 MATERIALS SCIENCE, BIOMATERIALS ACS Applied Bio Materials Pub Date : 2022-11-14 DOI:10.1108/ijmpb-03-2022-0077
Jianyao Jia, Yang Li, Xueqing Gan, G. Ma
{"title":"从局部到整体:将建设项目理解为多团队系统","authors":"Jianyao Jia, Yang Li, Xueqing Gan, G. Ma","doi":"10.1108/ijmpb-03-2022-0077","DOIUrl":null,"url":null,"abstract":"PurposeIn today's digital and post-pandemic era, construction teams can span their boundary to obtain important resources and support in computer-mediated ways. However, the benefits of computer-mediated team boundary spanning (TBS) are mostly assumed. Empirical evidence for these benefits is in lack. Thus, this study attempts to investigate the influence of computer-mediated (instant messaging in this study) TBS on construction project performance and the underlying mechanism.Design/methodology/approachFrom the multiteam system (MTS) perspective, this study employs the input-process-outcome (IPO) framework and coordination theory to explore the influence of instant messaging-based team boundary spanning (IMTBS) on construction project coordination processes and project performance. A theoretical model is built and validated with a survey involving 206 construction projects.FindingsResults show that IMTBS positively affects knowledge integration and project coordination, but negatively affects project commitment. The positive link between IMTBS and project performance is attributable to knowledge integration and project coordination. Further, project commitment is also found to negatively mediate the relationship between IMTBS and construction project performance.Originality/valueTo the best of the authors’ knowledge, this study is the first to empirically investigate the influence of TBS on construction project performance. As such, this study contributes to the literature on TBS in the construction field. In addition, the findings of this study unveil the double-edged characteristic of IMTBS, which should attract managers' attention. This also indicates that the form of TBS is a significant determinant of its effectiveness, which should attract scholars' attention in the future.","PeriodicalId":2,"journal":{"name":"ACS Applied Bio Materials","volume":null,"pages":null},"PeriodicalIF":4.6000,"publicationDate":"2022-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"From local to the whole: understanding construction projects as multiteam systems\",\"authors\":\"Jianyao Jia, Yang Li, Xueqing Gan, G. Ma\",\"doi\":\"10.1108/ijmpb-03-2022-0077\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PurposeIn today's digital and post-pandemic era, construction teams can span their boundary to obtain important resources and support in computer-mediated ways. However, the benefits of computer-mediated team boundary spanning (TBS) are mostly assumed. Empirical evidence for these benefits is in lack. Thus, this study attempts to investigate the influence of computer-mediated (instant messaging in this study) TBS on construction project performance and the underlying mechanism.Design/methodology/approachFrom the multiteam system (MTS) perspective, this study employs the input-process-outcome (IPO) framework and coordination theory to explore the influence of instant messaging-based team boundary spanning (IMTBS) on construction project coordination processes and project performance. A theoretical model is built and validated with a survey involving 206 construction projects.FindingsResults show that IMTBS positively affects knowledge integration and project coordination, but negatively affects project commitment. The positive link between IMTBS and project performance is attributable to knowledge integration and project coordination. Further, project commitment is also found to negatively mediate the relationship between IMTBS and construction project performance.Originality/valueTo the best of the authors’ knowledge, this study is the first to empirically investigate the influence of TBS on construction project performance. As such, this study contributes to the literature on TBS in the construction field. In addition, the findings of this study unveil the double-edged characteristic of IMTBS, which should attract managers' attention. This also indicates that the form of TBS is a significant determinant of its effectiveness, which should attract scholars' attention in the future.\",\"PeriodicalId\":2,\"journal\":{\"name\":\"ACS Applied Bio Materials\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":4.6000,\"publicationDate\":\"2022-11-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ACS Applied Bio Materials\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1108/ijmpb-03-2022-0077\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"MATERIALS SCIENCE, BIOMATERIALS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACS Applied Bio Materials","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1108/ijmpb-03-2022-0077","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"MATERIALS SCIENCE, BIOMATERIALS","Score":null,"Total":0}
引用次数: 2

摘要

目的在当今的数字和后疫情时代,施工团队可以跨越他们的边界,以计算机为媒介的方式获得重要的资源和支持。然而,计算机中介的团队边界跨越(TBS)的好处大多是假设的。缺乏这些好处的经验证据。因此,本研究试图研究计算机中介(本研究中为即时消息)TBS对建设项目绩效的影响及其潜在机制。设计/方法论/方法从多团队系统(MTS)的角度,本研究采用输入-过程-结果(IPO)框架和协调理论,探讨了基于即时消息的团队边界跨越(IMTBS)对建设项目协调过程和项目绩效的影响。建立了一个理论模型,并通过对206个建设项目的调查进行了验证。研究结果表明,IMTBS对知识整合和项目协调有正向影响,但对项目承诺有负向影响。IMTBS与项目绩效之间的积极联系可归因于知识整合和项目协调。此外,项目承诺也被发现对IMTBS与建设项目绩效之间的关系起到了负中介作用。原创性/价值据作者所知,本研究首次实证研究TBS对建设项目绩效的影响。因此,本研究有助于建筑领域TBS的文献研究。此外,本研究的发现揭示了IMTBS的双刃剑特征,这应该引起管理者的注意。这也表明TBS的形式是其有效性的重要决定因素,未来应引起学者的关注。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
From local to the whole: understanding construction projects as multiteam systems
PurposeIn today's digital and post-pandemic era, construction teams can span their boundary to obtain important resources and support in computer-mediated ways. However, the benefits of computer-mediated team boundary spanning (TBS) are mostly assumed. Empirical evidence for these benefits is in lack. Thus, this study attempts to investigate the influence of computer-mediated (instant messaging in this study) TBS on construction project performance and the underlying mechanism.Design/methodology/approachFrom the multiteam system (MTS) perspective, this study employs the input-process-outcome (IPO) framework and coordination theory to explore the influence of instant messaging-based team boundary spanning (IMTBS) on construction project coordination processes and project performance. A theoretical model is built and validated with a survey involving 206 construction projects.FindingsResults show that IMTBS positively affects knowledge integration and project coordination, but negatively affects project commitment. The positive link between IMTBS and project performance is attributable to knowledge integration and project coordination. Further, project commitment is also found to negatively mediate the relationship between IMTBS and construction project performance.Originality/valueTo the best of the authors’ knowledge, this study is the first to empirically investigate the influence of TBS on construction project performance. As such, this study contributes to the literature on TBS in the construction field. In addition, the findings of this study unveil the double-edged characteristic of IMTBS, which should attract managers' attention. This also indicates that the form of TBS is a significant determinant of its effectiveness, which should attract scholars' attention in the future.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
ACS Applied Bio Materials
ACS Applied Bio Materials Chemistry-Chemistry (all)
CiteScore
9.40
自引率
2.10%
发文量
464
期刊最新文献
A Systematic Review of Sleep Disturbance in Idiopathic Intracranial Hypertension. Advancing Patient Education in Idiopathic Intracranial Hypertension: The Promise of Large Language Models. Anti-Myelin-Associated Glycoprotein Neuropathy: Recent Developments. Approach to Managing the Initial Presentation of Multiple Sclerosis: A Worldwide Practice Survey. Association Between LACE+ Index Risk Category and 90-Day Mortality After Stroke.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1