12 .影响刚果民主共和国建设项目绩效的因素研究

IF 0.5 4区 工程技术 Q4 ENGINEERING, INDUSTRIAL South African Journal of Industrial Engineering Pub Date : 2020-05-29 DOI:10.7166/30-4-2193
B. F. Bitamba, S. An
{"title":"12 .影响刚果民主共和国建设项目绩效的因素研究","authors":"B. F. Bitamba, S. An","doi":"10.7166/30-4-2193","DOIUrl":null,"url":null,"abstract":"The Congolese construction industry faces many difficulties in dealing with the different factors that affect the proper performance of the construction process. Several key indicators (factors) that influence the construction performance in the Congo were selected for study and discussion. This study aimed to identify and evaluate the most significant key performance indicators that affect construction projects in the Congo, and to classify them using the relative importance index (RII). The most important factors affecting Congolese construction projects were design, client management, contractor productivity, scheduling, and the contract. The experience and skill of the design team were found to affect the design-related factors, whereas delayed payments and delivery of the construction site to the contractor were found to be the most important factors affecting client/owner-related factors. Client and management factors shared an equal average significant value of 0.68, while the productivity scheduling and contract related factors for the contractor shared an equal average value of 0.67. Finally, this work makes some recommendations to the Congolese construction industry in order to ensure proper project performance and successful projects.","PeriodicalId":49493,"journal":{"name":"South African Journal of Industrial Engineering","volume":"31 1","pages":"12-25"},"PeriodicalIF":0.5000,"publicationDate":"2020-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"12 STUDY ON FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE DEMOCRATIC REPUBLIC OF THE CONGO\",\"authors\":\"B. F. Bitamba, S. An\",\"doi\":\"10.7166/30-4-2193\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Congolese construction industry faces many difficulties in dealing with the different factors that affect the proper performance of the construction process. Several key indicators (factors) that influence the construction performance in the Congo were selected for study and discussion. This study aimed to identify and evaluate the most significant key performance indicators that affect construction projects in the Congo, and to classify them using the relative importance index (RII). The most important factors affecting Congolese construction projects were design, client management, contractor productivity, scheduling, and the contract. The experience and skill of the design team were found to affect the design-related factors, whereas delayed payments and delivery of the construction site to the contractor were found to be the most important factors affecting client/owner-related factors. Client and management factors shared an equal average significant value of 0.68, while the productivity scheduling and contract related factors for the contractor shared an equal average value of 0.67. Finally, this work makes some recommendations to the Congolese construction industry in order to ensure proper project performance and successful projects.\",\"PeriodicalId\":49493,\"journal\":{\"name\":\"South African Journal of Industrial Engineering\",\"volume\":\"31 1\",\"pages\":\"12-25\"},\"PeriodicalIF\":0.5000,\"publicationDate\":\"2020-05-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"South African Journal of Industrial Engineering\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.7166/30-4-2193\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"South African Journal of Industrial Engineering","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.7166/30-4-2193","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 4

摘要

刚果建筑业在处理影响施工过程正常进行的各种因素方面面临许多困难。选择影响刚果建设绩效的几个关键指标(因素)进行研究和讨论。本研究旨在确定和评估影响刚果建设项目的最重要的关键绩效指标,并使用相对重要性指数(RII)对其进行分类。影响刚果建筑项目的最重要因素是设计、客户管理、承包商生产力、进度安排和合同。设计团队的经验和技能影响设计相关因素,而延迟付款和向承包商交付施工场地是影响客户/业主相关因素的最重要因素。客户和管理因素的平均显著值为0.68,而承包商的生产力调度和合同相关因素的平均显著值为0.67。最后,本工作对刚果建筑业提出了一些建议,以确保适当的项目绩效和成功的项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
12 STUDY ON FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE DEMOCRATIC REPUBLIC OF THE CONGO
The Congolese construction industry faces many difficulties in dealing with the different factors that affect the proper performance of the construction process. Several key indicators (factors) that influence the construction performance in the Congo were selected for study and discussion. This study aimed to identify and evaluate the most significant key performance indicators that affect construction projects in the Congo, and to classify them using the relative importance index (RII). The most important factors affecting Congolese construction projects were design, client management, contractor productivity, scheduling, and the contract. The experience and skill of the design team were found to affect the design-related factors, whereas delayed payments and delivery of the construction site to the contractor were found to be the most important factors affecting client/owner-related factors. Client and management factors shared an equal average significant value of 0.68, while the productivity scheduling and contract related factors for the contractor shared an equal average value of 0.67. Finally, this work makes some recommendations to the Congolese construction industry in order to ensure proper project performance and successful projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.10
自引率
20.00%
发文量
15
审稿时长
6 weeks
期刊介绍: The South African Journal of Industrial Engineering (SAJIE) publishes articles with the emphasis on research, development and application within the fields of Industrial Engineering and Engineering and Technology Management. In this way, it aims to contribute to the further development of these fields of study and to serve as a vehicle for the effective interchange of knowledge, ideas and experience between the research and training oriented institutions and the application oriented industry. Articles on practical applications, original research and meaningful new developments as well as state of the art surveys are encouraged.
期刊最新文献
THE APPLICATION OF SIX SIGMA TO IMPROVE THE YIELD OF PLASTIC INJECTION MOLDING IMPROVING ENERGY USAGE IN COMMERCIAL BUILDINGS USING SIX SIGMA DMAIC CAPTURING THE REALITY OF INDUSTRY 4.0 READINESS DIMENSIONS AND INDICATORS IN A DEVELOPING COUNTRY: AN ANALYSIS OF APPLYING I4.0 IN INDONESIA PROJECT MANAGEMENT MATURITY AND PROJECT MANAGEMENT SUCCESS IN DEVELOPING COUNTRIES ASSESSING ORGANISATIONS’ READINESS TO ADOPT GREEN INFORMATION TECHNOLOGY: THE CASE OF A SOUTH AFRICAN INFORMATION TECHNOLOGY SERVICES VENDOR
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1