IT项目中信息鸿沟的原因和后果分析。波兰客户和供应商的观点

Q2 Engineering Archives of Transport Pub Date : 2021-12-31 DOI:10.5604/01.3001.0015.6932
Bartosz Wachnik, Piotr Pryciński, Jakub Murawski, M. Nader
{"title":"IT项目中信息鸿沟的原因和后果分析。波兰客户和供应商的观点","authors":"Bartosz Wachnik, Piotr Pryciński, Jakub Murawski, M. Nader","doi":"10.5604/01.3001.0015.6932","DOIUrl":null,"url":null,"abstract":"The high IT project failure rate means that the stakeholders start recognizing the need to analyze the factors influencing project success, previously deemed irrelevant in the face of technology, including the agile approach, eliminating project documentation, effective prototyping, information asymmetry between project parties, while also perfecting communication and the methods of knowledge transfer between team members. Currently, IT projects are researched using a holistic approach, seeing an implementation project as a whole, subject to specific regularities, which may not be deduced based on the knowledge of their individual components. We would like to enrich the research perspective with the notion of the information gap. The article aims to evaluate and analyze the information gap in ERP and CRM project implementations. We have researched the information gap from the perspective of project managers on the supplier’s and the client’s sides. The study was conducted in Poland between 2014 and 2021 in a group of medium companies, using qualitative research methods: unstructured interview and direct observation. The study led to a qualitative characterization of the information gap and the identification of its causes and consequences. The presented research result can help achieve three goals, i.e. studying the information gap in the selected group of IT projects, indicating the nature of imperfection in information access by the project participants, and raising awareness amongst project managers regarding risk management issues, especially uncertainty. Reducing the information gap can be used by the transaction parties to implement a strategy of building the object’s resilience to uncertainty and its consequences. These results can help develop methodologies of IT project implementation, limiting the level of risk and uncertainty.\n\n","PeriodicalId":53541,"journal":{"name":"Archives of Transport","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"An analysis of the causes and consequences of the information gap in IT projects. The client’s and the supplier’s perspective in Poland\",\"authors\":\"Bartosz Wachnik, Piotr Pryciński, Jakub Murawski, M. Nader\",\"doi\":\"10.5604/01.3001.0015.6932\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The high IT project failure rate means that the stakeholders start recognizing the need to analyze the factors influencing project success, previously deemed irrelevant in the face of technology, including the agile approach, eliminating project documentation, effective prototyping, information asymmetry between project parties, while also perfecting communication and the methods of knowledge transfer between team members. Currently, IT projects are researched using a holistic approach, seeing an implementation project as a whole, subject to specific regularities, which may not be deduced based on the knowledge of their individual components. We would like to enrich the research perspective with the notion of the information gap. The article aims to evaluate and analyze the information gap in ERP and CRM project implementations. We have researched the information gap from the perspective of project managers on the supplier’s and the client’s sides. The study was conducted in Poland between 2014 and 2021 in a group of medium companies, using qualitative research methods: unstructured interview and direct observation. The study led to a qualitative characterization of the information gap and the identification of its causes and consequences. The presented research result can help achieve three goals, i.e. studying the information gap in the selected group of IT projects, indicating the nature of imperfection in information access by the project participants, and raising awareness amongst project managers regarding risk management issues, especially uncertainty. Reducing the information gap can be used by the transaction parties to implement a strategy of building the object’s resilience to uncertainty and its consequences. These results can help develop methodologies of IT project implementation, limiting the level of risk and uncertainty.\\n\\n\",\"PeriodicalId\":53541,\"journal\":{\"name\":\"Archives of Transport\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Transport\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5604/01.3001.0015.6932\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Transport","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0015.6932","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 3

摘要

高IT项目失败率意味着利益相关者开始认识到需要分析影响项目成功的因素,这些因素以前在技术面前被认为是无关紧要的,包括敏捷方法、消除项目文档、有效的原型设计、项目各方之间的信息不对称,同时也完善了团队成员之间的沟通和知识转移方法。目前,IT项目是使用整体方法进行研究的,将实施项目视为一个整体,受制于特定的规律,而这些规律可能不是基于对其单个组件的了解来推断的。我们希望用信息差距的概念来丰富研究视角。本文旨在评估和分析ERP和CRM项目实施中的信息差距。我们从项目经理的角度研究了供应商和客户双方的信息差距。这项研究于2014年至2021年在波兰的一组中型公司中进行,采用了定性研究方法:非结构化访谈和直接观察。这项研究对信息差距进行了定性描述,并确定了其原因和后果。所提出的研究结果有助于实现三个目标,即研究所选IT项目组中的信息差距,表明项目参与者在信息访问方面存在缺陷的性质,以及提高项目经理对风险管理问题,特别是不确定性的认识。交易各方可以利用减少信息差距来实施一项战略,建立对象对不确定性及其后果的抵御能力。这些结果可以帮助开发IT项目实施的方法,限制风险和不确定性的水平。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An analysis of the causes and consequences of the information gap in IT projects. The client’s and the supplier’s perspective in Poland
The high IT project failure rate means that the stakeholders start recognizing the need to analyze the factors influencing project success, previously deemed irrelevant in the face of technology, including the agile approach, eliminating project documentation, effective prototyping, information asymmetry between project parties, while also perfecting communication and the methods of knowledge transfer between team members. Currently, IT projects are researched using a holistic approach, seeing an implementation project as a whole, subject to specific regularities, which may not be deduced based on the knowledge of their individual components. We would like to enrich the research perspective with the notion of the information gap. The article aims to evaluate and analyze the information gap in ERP and CRM project implementations. We have researched the information gap from the perspective of project managers on the supplier’s and the client’s sides. The study was conducted in Poland between 2014 and 2021 in a group of medium companies, using qualitative research methods: unstructured interview and direct observation. The study led to a qualitative characterization of the information gap and the identification of its causes and consequences. The presented research result can help achieve three goals, i.e. studying the information gap in the selected group of IT projects, indicating the nature of imperfection in information access by the project participants, and raising awareness amongst project managers regarding risk management issues, especially uncertainty. Reducing the information gap can be used by the transaction parties to implement a strategy of building the object’s resilience to uncertainty and its consequences. These results can help develop methodologies of IT project implementation, limiting the level of risk and uncertainty.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Archives of Transport
Archives of Transport Engineering-Automotive Engineering
CiteScore
2.50
自引率
0.00%
发文量
26
审稿时长
24 weeks
期刊最新文献
Proactive safety assessment of urban through-roads based on GPS data The Multidimensional Threats of Unmanned Aerial Systems: Exploring Biomechanical, Technical, Operational, and Legal Solutions for Ensuring Safety and Security Predicting severe wildlife vehicle crashes (WVCs) on New Hampshire roads using a hybrid generalized additive model Research on port AGV trajectory tracking control based on improved fuzzy sliding mode control Suitable law-based location selection of high-power electric vehicles charging stations on the TEN-T core network for sustainability: a case of Poland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1