锡安基督教堂复活节周末朝圣期间车辆交通减少

A. Mathebula, J. Smallwood
{"title":"锡安基督教堂复活节周末朝圣期间车辆交通减少","authors":"A. Mathebula, J. Smallwood","doi":"10.2478/otmcj-2022-0015","DOIUrl":null,"url":null,"abstract":"Abstract The study investigated the impact of the high volume of vehicular traffic on pilgrims and the community during the Zion Christian Church Easter weekend pilgrimage. The findings indicate that the South African transport planning approach is ossified and divorced from reality. There is a lacuna to address peak traffic challenges during the Easter weekend and the festive season. Notably, the government-led seasonal road safety campaigns, such as “Arrive Alive”, are curiously inadequate to address peak traffic and road accidents challenges in South Africa. The study employed the action research approach by collaborating with the Polokwane Local Municipality (PLM) to come up with lasting solutions to traffic congestion during the Easter weekend. The study found that the vehicular mode of transport was inadequate to cater for the mobility of pilgrims as well as other motorists during Easter weekend. The transport management framework for the PLM and a peak traffic standard were developed as part of the study recommendations. These recommendations augur a shift to transport planning in South Africa.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2731 - 2740"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The reduction of vehicular traffic during the Zion Christian Church Easter weekend pilgrimage\",\"authors\":\"A. Mathebula, J. Smallwood\",\"doi\":\"10.2478/otmcj-2022-0015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The study investigated the impact of the high volume of vehicular traffic on pilgrims and the community during the Zion Christian Church Easter weekend pilgrimage. The findings indicate that the South African transport planning approach is ossified and divorced from reality. There is a lacuna to address peak traffic challenges during the Easter weekend and the festive season. Notably, the government-led seasonal road safety campaigns, such as “Arrive Alive”, are curiously inadequate to address peak traffic and road accidents challenges in South Africa. The study employed the action research approach by collaborating with the Polokwane Local Municipality (PLM) to come up with lasting solutions to traffic congestion during the Easter weekend. The study found that the vehicular mode of transport was inadequate to cater for the mobility of pilgrims as well as other motorists during Easter weekend. The transport management framework for the PLM and a peak traffic standard were developed as part of the study recommendations. These recommendations augur a shift to transport planning in South Africa.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"14 1\",\"pages\":\"2731 - 2740\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2022-0015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

摘要本研究调查了锡安基督教会复活节周末朝圣期间大量车辆交通对朝圣者和社区的影响。研究结果表明,南非的交通规划方法僵化且脱离现实。在复活节周末和节日期间,应对高峰交通挑战存在漏洞。值得注意的是,政府领导的季节性道路安全运动,如“活着到达”,奇怪地不足以应对南非的高峰交通和道路事故挑战。这项研究采用了行动研究的方法,与波洛克瓦内地方市政当局(PLM)合作,为复活节周末的交通拥堵提出了持久的解决方案。研究发现,复活节周末期间,车辆交通方式不足以满足朝圣者和其他驾车者的出行需求。PLM的交通管理框架和高峰交通标准是作为研究建议的一部分制定的。这些建议预示着南非交通规划的转变。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The reduction of vehicular traffic during the Zion Christian Church Easter weekend pilgrimage
Abstract The study investigated the impact of the high volume of vehicular traffic on pilgrims and the community during the Zion Christian Church Easter weekend pilgrimage. The findings indicate that the South African transport planning approach is ossified and divorced from reality. There is a lacuna to address peak traffic challenges during the Easter weekend and the festive season. Notably, the government-led seasonal road safety campaigns, such as “Arrive Alive”, are curiously inadequate to address peak traffic and road accidents challenges in South Africa. The study employed the action research approach by collaborating with the Polokwane Local Municipality (PLM) to come up with lasting solutions to traffic congestion during the Easter weekend. The study found that the vehicular mode of transport was inadequate to cater for the mobility of pilgrims as well as other motorists during Easter weekend. The transport management framework for the PLM and a peak traffic standard were developed as part of the study recommendations. These recommendations augur a shift to transport planning in South Africa.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1