{"title":"具有随机资源可用性的项目中可再生资源成本的最小化","authors":"Hossein Moghaddaszadeh, M. Ranjbar, N. Jamili","doi":"10.1142/s0217595923500082","DOIUrl":null,"url":null,"abstract":"In this paper, we study the well-known resource availability cost problem with stochastic resource availability. The objective is to determine the initial levels of all renewable resources and establish a schedule corresponding to each scenario such that the expected resource availability cost is minimized. We assume that resource shortfalls can be compensated externally but at a noticeable higher cost. We formulate the problem as a two-stage stochastic programming model (TSSPM). We also develop an exact decomposition-based algorithm (DBA) for the particular case of the problem with at most two resources, which also functions as a heuristic for the original problem. Since the number of scenarios influences the performance of the developed solution approaches, we utilize a fast scenario reduction method to reduce the number of scenarios. Computational results indicate that the DBA outperforms the TSSPM formulation in solution quality and CPU runtime.","PeriodicalId":55455,"journal":{"name":"Asia-Pacific Journal of Operational Research","volume":" ","pages":""},"PeriodicalIF":1.1000,"publicationDate":"2023-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Minimizing the Expected Renewable Resource Costs in a Project with Stochastic Resource Availability\",\"authors\":\"Hossein Moghaddaszadeh, M. Ranjbar, N. Jamili\",\"doi\":\"10.1142/s0217595923500082\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we study the well-known resource availability cost problem with stochastic resource availability. The objective is to determine the initial levels of all renewable resources and establish a schedule corresponding to each scenario such that the expected resource availability cost is minimized. We assume that resource shortfalls can be compensated externally but at a noticeable higher cost. We formulate the problem as a two-stage stochastic programming model (TSSPM). We also develop an exact decomposition-based algorithm (DBA) for the particular case of the problem with at most two resources, which also functions as a heuristic for the original problem. Since the number of scenarios influences the performance of the developed solution approaches, we utilize a fast scenario reduction method to reduce the number of scenarios. Computational results indicate that the DBA outperforms the TSSPM formulation in solution quality and CPU runtime.\",\"PeriodicalId\":55455,\"journal\":{\"name\":\"Asia-Pacific Journal of Operational Research\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2023-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Asia-Pacific Journal of Operational Research\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1142/s0217595923500082\",\"RegionNum\":4,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"OPERATIONS RESEARCH & MANAGEMENT SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Asia-Pacific Journal of Operational Research","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1142/s0217595923500082","RegionNum":4,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
Minimizing the Expected Renewable Resource Costs in a Project with Stochastic Resource Availability
In this paper, we study the well-known resource availability cost problem with stochastic resource availability. The objective is to determine the initial levels of all renewable resources and establish a schedule corresponding to each scenario such that the expected resource availability cost is minimized. We assume that resource shortfalls can be compensated externally but at a noticeable higher cost. We formulate the problem as a two-stage stochastic programming model (TSSPM). We also develop an exact decomposition-based algorithm (DBA) for the particular case of the problem with at most two resources, which also functions as a heuristic for the original problem. Since the number of scenarios influences the performance of the developed solution approaches, we utilize a fast scenario reduction method to reduce the number of scenarios. Computational results indicate that the DBA outperforms the TSSPM formulation in solution quality and CPU runtime.
期刊介绍:
The Asia-Pacific Journal of Operational Research (APJOR) provides a forum for practitioners, academics and researchers in Operational Research and related fields, within and beyond the Asia-Pacific region.
APJOR will place submissions in one of the following categories: General, Theoretical, OR Practice, Reviewer Survey, OR Education, and Communications (including short articles and letters). Theoretical papers should carry significant methodological developments. Emphasis is on originality, quality and importance, with particular emphasis given to the practical significance of the results. Practical papers, illustrating the application of Operation Research, are of special interest.