Chukwuedozie N. Ezema, Nnenna Harmony Nwobodo-Nzeribe, J. Eneh, Uche Chinweoke Ogbuefi, M. J. Mbunwe, B. Anyaka, J. N. Ngene
{"title":"利用计算机控制看板循环优化制造系统","authors":"Chukwuedozie N. Ezema, Nnenna Harmony Nwobodo-Nzeribe, J. Eneh, Uche Chinweoke Ogbuefi, M. J. Mbunwe, B. Anyaka, J. N. Ngene","doi":"10.3329/bjsir.v57i4.61400","DOIUrl":null,"url":null,"abstract":"The study assessed manufacturing system optimization using computer-based control kanban loops. The study assessed JIT's effect on average throughput-time, demand fill rate, net operating income for a certain product mix complexity and manufacturing overhead level. ARENA/SIMAN and WITNESS simulation tools were used to study implementation. The Drug Process Plant's JIT system reduced end buffer inventory, shortened customer lead time, and improved visual control. The mean response of the simulated new physical system in terms of NOI was 85.54 but gave a mean response of 85.30 when implemented on the shop floor. The mean response of the simulated new physical system in terms of cycle time was 617 but gave a mean response of 634 when implemented on the shop floor. Simulated new physical system in terms of DFR gave a mean response of 93.11 when implemented on the shop floor. Overwhelmingly, the new JIT system outperformed the old physical system.\nBangladesh J. Sci. Ind. Res. 57(4), 221-228, 2022","PeriodicalId":8735,"journal":{"name":"Bangladesh Journal of Scientific and Industrial Research","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Manufacturing system optimization using computer-based control kanban loops\",\"authors\":\"Chukwuedozie N. Ezema, Nnenna Harmony Nwobodo-Nzeribe, J. Eneh, Uche Chinweoke Ogbuefi, M. J. Mbunwe, B. Anyaka, J. N. Ngene\",\"doi\":\"10.3329/bjsir.v57i4.61400\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study assessed manufacturing system optimization using computer-based control kanban loops. The study assessed JIT's effect on average throughput-time, demand fill rate, net operating income for a certain product mix complexity and manufacturing overhead level. ARENA/SIMAN and WITNESS simulation tools were used to study implementation. The Drug Process Plant's JIT system reduced end buffer inventory, shortened customer lead time, and improved visual control. The mean response of the simulated new physical system in terms of NOI was 85.54 but gave a mean response of 85.30 when implemented on the shop floor. The mean response of the simulated new physical system in terms of cycle time was 617 but gave a mean response of 634 when implemented on the shop floor. Simulated new physical system in terms of DFR gave a mean response of 93.11 when implemented on the shop floor. Overwhelmingly, the new JIT system outperformed the old physical system.\\nBangladesh J. Sci. Ind. Res. 57(4), 221-228, 2022\",\"PeriodicalId\":8735,\"journal\":{\"name\":\"Bangladesh Journal of Scientific and Industrial Research\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bangladesh Journal of Scientific and Industrial Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3329/bjsir.v57i4.61400\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bangladesh Journal of Scientific and Industrial Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3329/bjsir.v57i4.61400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Manufacturing system optimization using computer-based control kanban loops
The study assessed manufacturing system optimization using computer-based control kanban loops. The study assessed JIT's effect on average throughput-time, demand fill rate, net operating income for a certain product mix complexity and manufacturing overhead level. ARENA/SIMAN and WITNESS simulation tools were used to study implementation. The Drug Process Plant's JIT system reduced end buffer inventory, shortened customer lead time, and improved visual control. The mean response of the simulated new physical system in terms of NOI was 85.54 but gave a mean response of 85.30 when implemented on the shop floor. The mean response of the simulated new physical system in terms of cycle time was 617 but gave a mean response of 634 when implemented on the shop floor. Simulated new physical system in terms of DFR gave a mean response of 93.11 when implemented on the shop floor. Overwhelmingly, the new JIT system outperformed the old physical system.
Bangladesh J. Sci. Ind. Res. 57(4), 221-228, 2022