{"title":"双机可重入流车间的批流调度","authors":"F. C. Çetinkaya, Mehmet Duman","doi":"10.31181/oresta111221142c","DOIUrl":null,"url":null,"abstract":"Lot streaming is splitting a job-lot of identical items into several sublots (portions of a lot) that can be moved to the next machines upon completion so that operations on successive machines can be overlapped; hence, the overall performance of a multi-stage manufacturing environment can be improved. In this study, we consider a scheduling problem with lot streaming in a two-machine re-entrant flow shop in which each job-lot is processed first on Machine 1, then goes to Machine 2 for its second operation before it returns to the primary machine (either Machine 1 or Machine 2) for the third operation. For the two cases of the primary machine, both single-job and multi-job cases are studied independently. Optimal and near-optimal solution procedures are developed. Our objective is to minimize the makespan, which is the maximum completion time of the sublots and job lots in the single-job and multi-job cases, respectively. We prove that the single-job problem is optimally solved in polynomial-time regardless of whether the third operation is performed on Machine 1 or Machine 2. The multi-job problem is also optimally solvable in polynomial time when the third operation is performed on Machine 2. However, we prove that the multi-job problem is NP-hard when the third operation is performed on Machine 1. A global lower bound on the makespan and a simple heuristic algorithm are developed. Our computational experiment results reveal that our proposed heuristic algorithm provides optimal or near-optimal solutions in a very short time.","PeriodicalId":36055,"journal":{"name":"Operational Research in Engineering Sciences: Theory and Applications","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Scheduling with lot streaming in a two-machine re-entrant flow shop\",\"authors\":\"F. C. Çetinkaya, Mehmet Duman\",\"doi\":\"10.31181/oresta111221142c\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Lot streaming is splitting a job-lot of identical items into several sublots (portions of a lot) that can be moved to the next machines upon completion so that operations on successive machines can be overlapped; hence, the overall performance of a multi-stage manufacturing environment can be improved. In this study, we consider a scheduling problem with lot streaming in a two-machine re-entrant flow shop in which each job-lot is processed first on Machine 1, then goes to Machine 2 for its second operation before it returns to the primary machine (either Machine 1 or Machine 2) for the third operation. For the two cases of the primary machine, both single-job and multi-job cases are studied independently. Optimal and near-optimal solution procedures are developed. Our objective is to minimize the makespan, which is the maximum completion time of the sublots and job lots in the single-job and multi-job cases, respectively. We prove that the single-job problem is optimally solved in polynomial-time regardless of whether the third operation is performed on Machine 1 or Machine 2. The multi-job problem is also optimally solvable in polynomial time when the third operation is performed on Machine 2. However, we prove that the multi-job problem is NP-hard when the third operation is performed on Machine 1. A global lower bound on the makespan and a simple heuristic algorithm are developed. Our computational experiment results reveal that our proposed heuristic algorithm provides optimal or near-optimal solutions in a very short time.\",\"PeriodicalId\":36055,\"journal\":{\"name\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operational Research in Engineering Sciences: Theory and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31181/oresta111221142c\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operational Research in Engineering Sciences: Theory and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31181/oresta111221142c","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
Scheduling with lot streaming in a two-machine re-entrant flow shop
Lot streaming is splitting a job-lot of identical items into several sublots (portions of a lot) that can be moved to the next machines upon completion so that operations on successive machines can be overlapped; hence, the overall performance of a multi-stage manufacturing environment can be improved. In this study, we consider a scheduling problem with lot streaming in a two-machine re-entrant flow shop in which each job-lot is processed first on Machine 1, then goes to Machine 2 for its second operation before it returns to the primary machine (either Machine 1 or Machine 2) for the third operation. For the two cases of the primary machine, both single-job and multi-job cases are studied independently. Optimal and near-optimal solution procedures are developed. Our objective is to minimize the makespan, which is the maximum completion time of the sublots and job lots in the single-job and multi-job cases, respectively. We prove that the single-job problem is optimally solved in polynomial-time regardless of whether the third operation is performed on Machine 1 or Machine 2. The multi-job problem is also optimally solvable in polynomial time when the third operation is performed on Machine 2. However, we prove that the multi-job problem is NP-hard when the third operation is performed on Machine 1. A global lower bound on the makespan and a simple heuristic algorithm are developed. Our computational experiment results reveal that our proposed heuristic algorithm provides optimal or near-optimal solutions in a very short time.