{"title":"露天工程与地下工程边界的合理化方法","authors":"Nikolay Murzin, B. Talgamer, F. Dudinskiy","doi":"10.21177/1998-4502-2023-15-2-298-307","DOIUrl":null,"url":null,"abstract":"Introduction. Currently, in the development of mineral deposits, the most widely used are open and underground methods. At the same time, open-pit mining is characterized by an extremely negative impact on the environmental situation, while at enterprises that develop deposits by underground methods, labor productivity is lower and, with some development systems, the extraction of minerals is much worse. The possibility of using open pit and underground works at one field makes it possible to use the advantages of each of the development methods, while reducing the negative factors of one of them at the expense of the other. The aim of the work is to assess the impact of technological solutions involving internal dumping on the establishment of a boundary between open pit and underground operations, taking into account the reduction of the technogenic impact on the environment. Methods for determining the boundaries of the open pit can be divided into 2 groups: the first includes methods for determining the boundaries of the open pit by the minimum total costs or the maximum total profit, the other includes methods using the boundary stripping ratio. In this work, when developing an economic-mathematical model, the methodology proposed by Professor A.I. Arsentiev, where profit is used as a criterion for the transition from open to underground work. As a result of the research, an economic-mathematical model was developed and tested to solve the problem of determining the boundary of the transition from open to underground work, based on obtaining additional profit by reducing environmental costs and taking into account the change in the order of dumping. Dependences have been obtained that reflect the change in the economically justified depth of the open pit on the degree of use of the mined-out space, as well as on the area of external dumps. The analysis of the obtained dependences shows that within the established limits and the given modeling parameters, the use of the worked-out space of the quarry allows to reduce the area of external dumps from 13 ha to 2 ha, while the boundary stripping ratio increases to 5.04, and the depth of the open pit increases from 105 m to 116 m. The results of the study can be used in the design of field development by open pit and combined methods.","PeriodicalId":37608,"journal":{"name":"Sustainable Development of Mountain Territories","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"To the method of justification of borders between open and underground works\",\"authors\":\"Nikolay Murzin, B. Talgamer, F. Dudinskiy\",\"doi\":\"10.21177/1998-4502-2023-15-2-298-307\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction. Currently, in the development of mineral deposits, the most widely used are open and underground methods. At the same time, open-pit mining is characterized by an extremely negative impact on the environmental situation, while at enterprises that develop deposits by underground methods, labor productivity is lower and, with some development systems, the extraction of minerals is much worse. The possibility of using open pit and underground works at one field makes it possible to use the advantages of each of the development methods, while reducing the negative factors of one of them at the expense of the other. The aim of the work is to assess the impact of technological solutions involving internal dumping on the establishment of a boundary between open pit and underground operations, taking into account the reduction of the technogenic impact on the environment. Methods for determining the boundaries of the open pit can be divided into 2 groups: the first includes methods for determining the boundaries of the open pit by the minimum total costs or the maximum total profit, the other includes methods using the boundary stripping ratio. In this work, when developing an economic-mathematical model, the methodology proposed by Professor A.I. Arsentiev, where profit is used as a criterion for the transition from open to underground work. As a result of the research, an economic-mathematical model was developed and tested to solve the problem of determining the boundary of the transition from open to underground work, based on obtaining additional profit by reducing environmental costs and taking into account the change in the order of dumping. Dependences have been obtained that reflect the change in the economically justified depth of the open pit on the degree of use of the mined-out space, as well as on the area of external dumps. The analysis of the obtained dependences shows that within the established limits and the given modeling parameters, the use of the worked-out space of the quarry allows to reduce the area of external dumps from 13 ha to 2 ha, while the boundary stripping ratio increases to 5.04, and the depth of the open pit increases from 105 m to 116 m. The results of the study can be used in the design of field development by open pit and combined methods.\",\"PeriodicalId\":37608,\"journal\":{\"name\":\"Sustainable Development of Mountain Territories\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sustainable Development of Mountain Territories\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21177/1998-4502-2023-15-2-298-307\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sustainable Development of Mountain Territories","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21177/1998-4502-2023-15-2-298-307","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 0

摘要

介绍目前,在矿床开发中,应用最广泛的是露天和地下两种方法。同时,露天开采对环境状况的影响极为不利,而在采用地下开采方法开发矿床的企业中,劳动生产率较低,而且在一些开发系统中,矿物开采情况要糟糕得多。在一个场地使用露天和地下工程的可能性使得可以利用每种开发方法的优势,同时以牺牲另一种为代价减少其中一种方法的负面因素。这项工作的目的是评估涉及内部倾倒的技术解决方案对露天矿场和地下作业之间建立边界的影响,同时考虑到减少技术对环境的影响。露天矿边界的确定方法可分为两组:第一组包括按最小总成本或最大总利润确定露天矿边界,另一组包括采用边界剥离率的方法。在这项工作中,在开发经济数学模型时,采用了A.I.Arsentiev教授提出的方法,其中利润被用作从露天工作向地下工作过渡的标准。作为研究的结果,开发并测试了一个经济数学模型,以解决从露天作业向地下作业过渡的边界确定问题,其基础是通过降低环境成本获得额外利润,并考虑到倾倒顺序的变化。已经获得了反映露天矿经济合理深度变化与采空空间使用程度以及外部倾倒区面积的依赖关系。对所获得相关性的分析表明,在既定的限制和给定的建模参数范围内,使用采石场的计算空间可以将外部倾倒区的面积从13公顷减少到2公顷,而边界剥离率增加到5.04,露天矿坑的深度从105米增加到116米。研究结果可用于露天开采和组合开采的现场开发设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
To the method of justification of borders between open and underground works
Introduction. Currently, in the development of mineral deposits, the most widely used are open and underground methods. At the same time, open-pit mining is characterized by an extremely negative impact on the environmental situation, while at enterprises that develop deposits by underground methods, labor productivity is lower and, with some development systems, the extraction of minerals is much worse. The possibility of using open pit and underground works at one field makes it possible to use the advantages of each of the development methods, while reducing the negative factors of one of them at the expense of the other. The aim of the work is to assess the impact of technological solutions involving internal dumping on the establishment of a boundary between open pit and underground operations, taking into account the reduction of the technogenic impact on the environment. Methods for determining the boundaries of the open pit can be divided into 2 groups: the first includes methods for determining the boundaries of the open pit by the minimum total costs or the maximum total profit, the other includes methods using the boundary stripping ratio. In this work, when developing an economic-mathematical model, the methodology proposed by Professor A.I. Arsentiev, where profit is used as a criterion for the transition from open to underground work. As a result of the research, an economic-mathematical model was developed and tested to solve the problem of determining the boundary of the transition from open to underground work, based on obtaining additional profit by reducing environmental costs and taking into account the change in the order of dumping. Dependences have been obtained that reflect the change in the economically justified depth of the open pit on the degree of use of the mined-out space, as well as on the area of external dumps. The analysis of the obtained dependences shows that within the established limits and the given modeling parameters, the use of the worked-out space of the quarry allows to reduce the area of external dumps from 13 ha to 2 ha, while the boundary stripping ratio increases to 5.04, and the depth of the open pit increases from 105 m to 116 m. The results of the study can be used in the design of field development by open pit and combined methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Sustainable Development of Mountain Territories
Sustainable Development of Mountain Territories Social Sciences-Sociology and Political Science
CiteScore
2.40
自引率
0.00%
发文量
36
期刊介绍: International scientific journal "Sustainable development of mountain territories" covers fundamental and applied regional, national and international research and provides a platform to publish original full papers and related reviews in the following areas: engineering science and Earth science in the field of sustainable development of mountain territories. Main objectives of international scientific journal "Sustainable development of mountain territories" are: raising the level of professional scientific workers, teachers of higher educational institutions and scientific organizations; presentation of research results in the field of sustainable development of mountain areas on the technical aspects and Earth sciences, informing readers about the results of Russian and international scientific forums; improved review and editing of the articles submitted for publication; ensuring wide dissemination for the published articles in the international academic environment; encouraging dissemination and indexing of scientific works in various foreign key citation databases.
期刊最新文献
Socio-economic initiative in the sustainable development of Ural Cities Determination of parameters of elastic damping devices in mining shovel mechanisms Modeling and control of parameters of flow technologies with local hydraulic transport and coal dewatering based on analysis of the structure of the tunneling cycle Analysis of the nanoparticles formation mechanisms in the rock mass Assessment of the current state of the hydrochemical regime and water-environmental problems of the basin of the Gavaraget River flowing into Lake Sevan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1