{"title":"乌干达中央政府采购和处置实体的制度压力和采购周期:机会主义行为的中介作用","authors":"Peter Simon Olupot","doi":"10.1108/jopp-04-2023-0024","DOIUrl":null,"url":null,"abstract":"\nPurpose\nThis study focused on establishing the mediating role of opportunistic behavior in the relationship between institutional pressures and procurement cycle time (PCT) in Uganda’s central government (CG) procuring and disposing entities (PDEs). The study also sought to establish the relationship between institutional pressures and PCT, between institutional pressures and opportunity behavior and between opportunistic behavior and PCT. This study was carried out because most PDEs had failed to perform well in terms of PCT, and beneficiaries had often complained of the lengthy PCT.\n\n\nDesign/methodology/approach\nThe unit of analysis was 126 CG PDEs within Uganda while the unit of inquiry was three employees per PDE, namely, giving a total of 378 respondents. Using a quantitative cross-sectional survey, the study realized a response rate of 88% for the unit of analysis and 71.7% for unit of inquiry. Data were analyzed using SmartPLS 4 with focus on ascertaining regression and mediation results.\n\n\nFindings\nThe findings show that institutional pressures negatively and significantly predict both institutional pressures and PCT (ß = –0.569**; ß = –0.688**, respectively). Also, institutional pressures and opportunistic behavior are significant predictors of PCT, predicting 60.6% change in PCT. Furthermore, opportunity behavior partially moderates the relationship between institutional pressures and PCT.\n\n\nResearch limitations/implications\nFor Uganda’s CG PDEs to reduce procurement delays and to procure within PCT, they should put more emphasis on institutional pressures and curtailing opportunistic behavior. The study recommends further amendment of the Public Procurement and Disposal of Public Assets (PPDA) Act 2003 to reduce delays.\n\n\nPractical implications\nThere is need for further amendment of the PPDA Act 2003 to reduce delays, especially those attributed to approvals by contracts committee and the minimum bidding period for competitive bidding.\n\n\nSocial implications\nThe study explores PCT and its antecedents whose understanding is critical in exploring avenues of reducing PCT and boosting service delivery to the beneficiaries.\n\n\nOriginality/value\nThe PPDA Act (2003) was amended in 2014, but still the time spent in the procurement processes has remained long, hence delaying or denying citizens service delivery. This is a matter of concern to the country at large and may spill into political unrests, and yet, there is scant literature exploring PCT and its antecedents. This makes the present study one of the pioneer empirical studies on PCT, with emphasis on Uganda. This study provides a framework for examining PCT in a context where scholarly explanation of PCT is still limited.\n","PeriodicalId":45136,"journal":{"name":"Journal of Public Procurement","volume":" ","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-08-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Institutional pressures and procurement cycle time in Uganda’s central government procuring and disposing entities: the mediating role of opportunistic behavior\",\"authors\":\"Peter Simon Olupot\",\"doi\":\"10.1108/jopp-04-2023-0024\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nPurpose\\nThis study focused on establishing the mediating role of opportunistic behavior in the relationship between institutional pressures and procurement cycle time (PCT) in Uganda’s central government (CG) procuring and disposing entities (PDEs). The study also sought to establish the relationship between institutional pressures and PCT, between institutional pressures and opportunity behavior and between opportunistic behavior and PCT. This study was carried out because most PDEs had failed to perform well in terms of PCT, and beneficiaries had often complained of the lengthy PCT.\\n\\n\\nDesign/methodology/approach\\nThe unit of analysis was 126 CG PDEs within Uganda while the unit of inquiry was three employees per PDE, namely, giving a total of 378 respondents. Using a quantitative cross-sectional survey, the study realized a response rate of 88% for the unit of analysis and 71.7% for unit of inquiry. Data were analyzed using SmartPLS 4 with focus on ascertaining regression and mediation results.\\n\\n\\nFindings\\nThe findings show that institutional pressures negatively and significantly predict both institutional pressures and PCT (ß = –0.569**; ß = –0.688**, respectively). Also, institutional pressures and opportunistic behavior are significant predictors of PCT, predicting 60.6% change in PCT. Furthermore, opportunity behavior partially moderates the relationship between institutional pressures and PCT.\\n\\n\\nResearch limitations/implications\\nFor Uganda’s CG PDEs to reduce procurement delays and to procure within PCT, they should put more emphasis on institutional pressures and curtailing opportunistic behavior. The study recommends further amendment of the Public Procurement and Disposal of Public Assets (PPDA) Act 2003 to reduce delays.\\n\\n\\nPractical implications\\nThere is need for further amendment of the PPDA Act 2003 to reduce delays, especially those attributed to approvals by contracts committee and the minimum bidding period for competitive bidding.\\n\\n\\nSocial implications\\nThe study explores PCT and its antecedents whose understanding is critical in exploring avenues of reducing PCT and boosting service delivery to the beneficiaries.\\n\\n\\nOriginality/value\\nThe PPDA Act (2003) was amended in 2014, but still the time spent in the procurement processes has remained long, hence delaying or denying citizens service delivery. This is a matter of concern to the country at large and may spill into political unrests, and yet, there is scant literature exploring PCT and its antecedents. This makes the present study one of the pioneer empirical studies on PCT, with emphasis on Uganda. This study provides a framework for examining PCT in a context where scholarly explanation of PCT is still limited.\\n\",\"PeriodicalId\":45136,\"journal\":{\"name\":\"Journal of Public Procurement\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-08-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Public Procurement\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/jopp-04-2023-0024\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"PUBLIC ADMINISTRATION\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Procurement","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/jopp-04-2023-0024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"PUBLIC ADMINISTRATION","Score":null,"Total":0}
引用次数: 0

摘要

目的本研究的重点是建立机会主义行为在乌干达中央政府采购和处置实体(PDE)的制度压力和采购周期时间(PCT)之间关系中的中介作用。该研究还试图建立制度压力与PCT之间、制度压力与机会行为之间以及机会行为与PCT之间的关系。之所以进行这项研究,是因为大多数PDE在PCT方面表现不佳,受益人经常抱怨PCT.Design/方法/方法冗长。分析单位是乌干达境内的126个CG PDE,而调查单位是每个PDE三名员工,即总共有378名受访者。通过定量横断面调查,该研究的分析单位和调查单位的回答率分别为88%和71.7%。使用SmartPLS 4对数据进行分析,重点是确定回归和中介结果。研究结果表明,制度压力对制度压力和PCT都有负面和显著的预测作用(分别为ß=–0.569**;ß;=-0.688**)。此外,制度压力和机会主义行为是PCT的重要预测因素,预测PCT变化60.6%。此外,机会行为部分调节了制度压力和PCT之间的关系。研究局限性/含义对于乌干达的CG PDE减少采购延迟和在PCT内采购,他们应该更加重视制度压力和遏制机会主义行为。该研究建议进一步修订2003年《公共资产公共采购和处置法》,以减少延误。实际影响需要进一步修订2003年《PPDA法》,以减少延误,特别是由于合同委员会的批准和竞争性招标的最短投标期造成的延误。社会含义该研究探讨了PCT及其前因,其理解对于探索减少PCT和促进向受益人提供服务的途径至关重要。创意/价值PPDA法案(2003年)于2014年进行了修订,但采购过程中花费的时间仍然很长,因此推迟或拒绝向公民提供服务。这是整个国家关注的问题,可能会导致政治动荡,然而,很少有文献探讨PCT及其前身。这使得本研究成为PCT的先驱实证研究之一,重点是乌干达。本研究为在PCT的学术解释仍然有限的情况下审查PCT提供了一个框架。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Institutional pressures and procurement cycle time in Uganda’s central government procuring and disposing entities: the mediating role of opportunistic behavior
Purpose This study focused on establishing the mediating role of opportunistic behavior in the relationship between institutional pressures and procurement cycle time (PCT) in Uganda’s central government (CG) procuring and disposing entities (PDEs). The study also sought to establish the relationship between institutional pressures and PCT, between institutional pressures and opportunity behavior and between opportunistic behavior and PCT. This study was carried out because most PDEs had failed to perform well in terms of PCT, and beneficiaries had often complained of the lengthy PCT. Design/methodology/approach The unit of analysis was 126 CG PDEs within Uganda while the unit of inquiry was three employees per PDE, namely, giving a total of 378 respondents. Using a quantitative cross-sectional survey, the study realized a response rate of 88% for the unit of analysis and 71.7% for unit of inquiry. Data were analyzed using SmartPLS 4 with focus on ascertaining regression and mediation results. Findings The findings show that institutional pressures negatively and significantly predict both institutional pressures and PCT (ß = –0.569**; ß = –0.688**, respectively). Also, institutional pressures and opportunistic behavior are significant predictors of PCT, predicting 60.6% change in PCT. Furthermore, opportunity behavior partially moderates the relationship between institutional pressures and PCT. Research limitations/implications For Uganda’s CG PDEs to reduce procurement delays and to procure within PCT, they should put more emphasis on institutional pressures and curtailing opportunistic behavior. The study recommends further amendment of the Public Procurement and Disposal of Public Assets (PPDA) Act 2003 to reduce delays. Practical implications There is need for further amendment of the PPDA Act 2003 to reduce delays, especially those attributed to approvals by contracts committee and the minimum bidding period for competitive bidding. Social implications The study explores PCT and its antecedents whose understanding is critical in exploring avenues of reducing PCT and boosting service delivery to the beneficiaries. Originality/value The PPDA Act (2003) was amended in 2014, but still the time spent in the procurement processes has remained long, hence delaying or denying citizens service delivery. This is a matter of concern to the country at large and may spill into political unrests, and yet, there is scant literature exploring PCT and its antecedents. This makes the present study one of the pioneer empirical studies on PCT, with emphasis on Uganda. This study provides a framework for examining PCT in a context where scholarly explanation of PCT is still limited.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Public Procurement
Journal of Public Procurement PUBLIC ADMINISTRATION-
CiteScore
4.40
自引率
4.00%
发文量
13
期刊介绍: The Journal of Public Procurement (JOPP) seeks to further the understanding of public procurement. JOPP publishes original, high-quality research that explores the theories and practices of public procurement. The journal ensures that high-quality research is collected and disseminated widely to both academics and practitioners, and provides a forum for debate. It covers all subjects relating to the purchase of goods, services and works by public organizations at a local, regional, national and international level. JOPP is multi-disciplinary, with a broad approach towards methods and styles of research as well as the level of issues addressed. The Journal welcomes the submission of papers from researchers internationally. The journal welcomes research papers, narrative essays, exemplar cases, forums, and book reviews.
期刊最新文献
Approaching transcendence: a conceptual discussion on procurement fraud, education, professionalism maturity, ethics and implications Procurement practices and operational performance: a study of linear and curvilinear relationships in a developing economy The predicting role of sustainable supplier selection on lead-time performance in public procurement: relational capability as a moderator Challenges of black construction professionals with Black Economic Empowerment as a procurement policy in South Africa Streamlining professionalisation in public procurement: Romanian competency frameworks as a case study (Part B)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1