克赖斯特彻奇中央商务区受损和被忽视建筑的灾后恢复面临的挑战

O. Filippova, K. Elwood, T. Collins
{"title":"克赖斯特彻奇中央商务区受损和被忽视建筑的灾后恢复面临的挑战","authors":"O. Filippova, K. Elwood, T. Collins","doi":"10.5459/bnzsee.56.1.38-54","DOIUrl":null,"url":null,"abstract":"More than a decade since the 22 February 2011 earthquake devastated Christchurch CBD, partially demolished and neglected buildings remain present in the post-earthquake landscape. Christchurch City Council has made significant progress in recent years to reduce the level of neglected buildings across the central parts of the city. To encourage remediation of these buildings, the Council initiated the Barrier Sites programme to keep track of central city sites. This paper documents the current inventory of derelict properties and investigates issues that are delaying progress on these sites. We explore regulatory levers that can be used to influence action on these buildings (e.g. provisions in the Building Act and council bylaws). We also investigate how the local market drivers influence the speed of regeneration. Our review identifies gaps in the regulatory powers to act on barrier sites. Taking action involves meeting difficult definitions and tests under legislation and/or taking court proceedings. Specific legislative tools are needed to provide Councils with the powers they need to ensure action is taken on barrier sites to progress the regeneration of the city after a disaster. We also find that the delays in removing the cordon and uncertainties of the public sector anchor projects contained in the Blueprint have led to the loss of private investment and forced central city developments compete with more affordable commercial and residential offerings outside the CBD. With the passing of the 10-year anniversary of the earthquakes, this project offers a timely reminder of the mammoth struggles that the city has overcome evident in the numerous modern and resilient buildings, yet a few ‘battle sites’ slow the much-needed regeneration towards a resilient city centre.","PeriodicalId":46396,"journal":{"name":"Bulletin of the New Zealand Society for Earthquake Engineering","volume":null,"pages":null},"PeriodicalIF":0.8000,"publicationDate":"2023-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Challenges in post-earthquake recovery of damaged and neglected buildings in Christchurch CBD\",\"authors\":\"O. Filippova, K. Elwood, T. Collins\",\"doi\":\"10.5459/bnzsee.56.1.38-54\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"More than a decade since the 22 February 2011 earthquake devastated Christchurch CBD, partially demolished and neglected buildings remain present in the post-earthquake landscape. Christchurch City Council has made significant progress in recent years to reduce the level of neglected buildings across the central parts of the city. To encourage remediation of these buildings, the Council initiated the Barrier Sites programme to keep track of central city sites. This paper documents the current inventory of derelict properties and investigates issues that are delaying progress on these sites. We explore regulatory levers that can be used to influence action on these buildings (e.g. provisions in the Building Act and council bylaws). We also investigate how the local market drivers influence the speed of regeneration. Our review identifies gaps in the regulatory powers to act on barrier sites. Taking action involves meeting difficult definitions and tests under legislation and/or taking court proceedings. Specific legislative tools are needed to provide Councils with the powers they need to ensure action is taken on barrier sites to progress the regeneration of the city after a disaster. We also find that the delays in removing the cordon and uncertainties of the public sector anchor projects contained in the Blueprint have led to the loss of private investment and forced central city developments compete with more affordable commercial and residential offerings outside the CBD. With the passing of the 10-year anniversary of the earthquakes, this project offers a timely reminder of the mammoth struggles that the city has overcome evident in the numerous modern and resilient buildings, yet a few ‘battle sites’ slow the much-needed regeneration towards a resilient city centre.\",\"PeriodicalId\":46396,\"journal\":{\"name\":\"Bulletin of the New Zealand Society for Earthquake Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.8000,\"publicationDate\":\"2023-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the New Zealand Society for Earthquake Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5459/bnzsee.56.1.38-54\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, GEOLOGICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the New Zealand Society for Earthquake Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5459/bnzsee.56.1.38-54","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, GEOLOGICAL","Score":null,"Total":0}
引用次数: 0

摘要

自2011年2月22日地震摧毁基督城CBD以来,十多年来,部分被拆除和被忽视的建筑仍然存在于地震后的景观中。近年来,克赖斯特彻奇市议会在减少城市中心地区被忽视的建筑水平方面取得了重大进展。为了鼓励修复这些建筑物,市议会发起了“屏障地点计划”,以追踪市中心的地点。本文记录了目前被遗弃财产的清单,并调查了延迟这些地点进展的问题。我们探讨了可用于影响对这些建筑物采取行动的监管杠杆(例如《建筑法》和理事会章程中的规定)。我们还研究了当地市场驱动因素如何影响再生速度。我们的审查确定了监管权力对障碍地点采取行动的差距。采取行动涉及满足立法规定的困难定义和检验标准和/或提起法庭诉讼。需要具体的立法工具来为地方议会提供他们所需的权力,以确保在灾害发生后采取行动,推进城市的重建。我们还发现,蓝图中包含的公共部门核心项目的拆除延误和不确定性导致了私人投资的损失,并迫使中心城市的开发项目与CBD以外更实惠的商业和住宅项目竞争。随着地震十周年的过去,这个项目及时地提醒人们,这座城市已经克服了巨大的斗争,这在众多现代和有弹性的建筑中是显而易见的,然而一些“战斗遗址”延缓了城市中心急需的重建。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Challenges in post-earthquake recovery of damaged and neglected buildings in Christchurch CBD
More than a decade since the 22 February 2011 earthquake devastated Christchurch CBD, partially demolished and neglected buildings remain present in the post-earthquake landscape. Christchurch City Council has made significant progress in recent years to reduce the level of neglected buildings across the central parts of the city. To encourage remediation of these buildings, the Council initiated the Barrier Sites programme to keep track of central city sites. This paper documents the current inventory of derelict properties and investigates issues that are delaying progress on these sites. We explore regulatory levers that can be used to influence action on these buildings (e.g. provisions in the Building Act and council bylaws). We also investigate how the local market drivers influence the speed of regeneration. Our review identifies gaps in the regulatory powers to act on barrier sites. Taking action involves meeting difficult definitions and tests under legislation and/or taking court proceedings. Specific legislative tools are needed to provide Councils with the powers they need to ensure action is taken on barrier sites to progress the regeneration of the city after a disaster. We also find that the delays in removing the cordon and uncertainties of the public sector anchor projects contained in the Blueprint have led to the loss of private investment and forced central city developments compete with more affordable commercial and residential offerings outside the CBD. With the passing of the 10-year anniversary of the earthquakes, this project offers a timely reminder of the mammoth struggles that the city has overcome evident in the numerous modern and resilient buildings, yet a few ‘battle sites’ slow the much-needed regeneration towards a resilient city centre.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.50
自引率
17.60%
发文量
14
期刊最新文献
Method to identify if torsional mode of a building is its first mode Earthquake design loads for retaining walls Infrastructure planning emergency levels of service for the Wellington region, Aotearoa New Zealand – An operationalised framework Seismic fragility of reinforced concrete buildings with hollow-core flooring systems Evaluation of the Inter-frequency Correlation of New Zealand CyberShake Crustal Earthquake Simulations
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1