克罗地亚建筑劳动力和技能短缺的原因及应对策略

A. Cerić, I. Ivić
{"title":"克罗地亚建筑劳动力和技能短缺的原因及应对策略","authors":"A. Cerić, I. Ivić","doi":"10.2478/otmcj-2020-0019","DOIUrl":null,"url":null,"abstract":"Abstract The construction labor is crucial to the construction industry, which is known globally for its creation of jobs at different skill and professional levels. The world's construction industry is currently experiencing a rapid recovery after the 2008 global crisis. This positive growth is also noticeable in Croatia. Nevertheless, the industry is experiencing a considerable shortage of skilled labor. First, this paper investigates the main causes of the current condition of the labor market through an extensive literature review and construction market analysis. Second, the case study of the Croatian construction labor market is presented. The longitudinal study of official statistical data shows that the total number of workers employed over the last 10 years has decreased significantly. There has been an increase in the number of unskilled workers and a decrease in the number of all other types of workers between 2016 and 2017. Following the literature review and market analysis, the response strategies for the problem of labor shortage in Croatian construction are provided and discussed.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"12 1","pages":"2232 - 2244"},"PeriodicalIF":1.6000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.2478/otmcj-2020-0019","citationCount":"7","resultStr":"{\"title\":\"Construction labor and skill shortages in Croatia: causes and response strategies\",\"authors\":\"A. Cerić, I. Ivić\",\"doi\":\"10.2478/otmcj-2020-0019\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The construction labor is crucial to the construction industry, which is known globally for its creation of jobs at different skill and professional levels. The world's construction industry is currently experiencing a rapid recovery after the 2008 global crisis. This positive growth is also noticeable in Croatia. Nevertheless, the industry is experiencing a considerable shortage of skilled labor. First, this paper investigates the main causes of the current condition of the labor market through an extensive literature review and construction market analysis. Second, the case study of the Croatian construction labor market is presented. The longitudinal study of official statistical data shows that the total number of workers employed over the last 10 years has decreased significantly. There has been an increase in the number of unskilled workers and a decrease in the number of all other types of workers between 2016 and 2017. Following the literature review and market analysis, the response strategies for the problem of labor shortage in Croatian construction are provided and discussed.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"12 1\",\"pages\":\"2232 - 2244\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.2478/otmcj-2020-0019\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2020-0019\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2020-0019","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 7

摘要

建筑劳动力对建筑业至关重要,建筑业以其创造不同技能和专业水平的工作而闻名于世。2008年全球金融危机后,世界建筑业目前正经历快速复苏。这种积极的增长在克罗地亚也很明显。然而,该行业正经历着熟练劳动力的严重短缺。首先,本文通过广泛的文献回顾和建筑市场分析,调查了劳动力市场现状的主要原因。其次,介绍了克罗地亚建筑劳动力市场的案例研究。对官方统计数据的纵向研究表明,在过去10年里,被雇佣的工人总数显著减少。2016年至2017年期间,非技术工人的数量有所增加,所有其他类型工人的数量有所减少。在文献回顾和市场分析的基础上,提出了克罗地亚建筑业劳动力短缺问题的应对策略并进行了讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Construction labor and skill shortages in Croatia: causes and response strategies
Abstract The construction labor is crucial to the construction industry, which is known globally for its creation of jobs at different skill and professional levels. The world's construction industry is currently experiencing a rapid recovery after the 2008 global crisis. This positive growth is also noticeable in Croatia. Nevertheless, the industry is experiencing a considerable shortage of skilled labor. First, this paper investigates the main causes of the current condition of the labor market through an extensive literature review and construction market analysis. Second, the case study of the Croatian construction labor market is presented. The longitudinal study of official statistical data shows that the total number of workers employed over the last 10 years has decreased significantly. There has been an increase in the number of unskilled workers and a decrease in the number of all other types of workers between 2016 and 2017. Following the literature review and market analysis, the response strategies for the problem of labor shortage in Croatian construction are provided and discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1