{"title":"道路施工测量工程的风险分析","authors":"Magdalena Kowacka, A. Duchaczek, Dominika Dudziak-Gajowiak, D. Skorupka, Agnieszka Waniewska","doi":"10.22630/pniks.2019.28.3.35","DOIUrl":null,"url":null,"abstract":"This study aimed to indicate the identified risk factors, which is the first stage in the presented method for risk analysis in geodetic works. The experts’ opinion, analysis of available documentation, experience, subject literature review, and observation allowed for obtaining information due to which 20 risk factors were selected. The presented method for risk analysis was developed as a result of investigations and verification of existing risk analysis methods, as well as the market needs. The results of the study on the identification of risk factors and the presented risk analysis method are the first stage of the research on the given subject, the continuation of which will be presented in subsequent works.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-09-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Risk analysis in surveying works related to roads construction\",\"authors\":\"Magdalena Kowacka, A. Duchaczek, Dominika Dudziak-Gajowiak, D. Skorupka, Agnieszka Waniewska\",\"doi\":\"10.22630/pniks.2019.28.3.35\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aimed to indicate the identified risk factors, which is the first stage in the presented method for risk analysis in geodetic works. The experts’ opinion, analysis of available documentation, experience, subject literature review, and observation allowed for obtaining information due to which 20 risk factors were selected. The presented method for risk analysis was developed as a result of investigations and verification of existing risk analysis methods, as well as the market needs. The results of the study on the identification of risk factors and the presented risk analysis method are the first stage of the research on the given subject, the continuation of which will be presented in subsequent works.\",\"PeriodicalId\":38397,\"journal\":{\"name\":\"Scientific Review Engineering and Environmental Sciences\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Review Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22630/pniks.2019.28.3.35\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/pniks.2019.28.3.35","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 2

摘要

本研究旨在指出已识别的风险因素,这是所提出的大地测量工程风险分析方法的第一阶段。专家的意见、对现有文献的分析、经验、受试者文献综述和观察结果允许获得信息,因此选择了20个风险因素。所提出的风险分析方法是在调查和验证现有风险分析方法以及市场需求的基础上开发的。识别风险因素的研究结果和提出的风险分析方法是对特定主题的研究的第一阶段,后续工作将继续介绍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Risk analysis in surveying works related to roads construction
This study aimed to indicate the identified risk factors, which is the first stage in the presented method for risk analysis in geodetic works. The experts’ opinion, analysis of available documentation, experience, subject literature review, and observation allowed for obtaining information due to which 20 risk factors were selected. The presented method for risk analysis was developed as a result of investigations and verification of existing risk analysis methods, as well as the market needs. The results of the study on the identification of risk factors and the presented risk analysis method are the first stage of the research on the given subject, the continuation of which will be presented in subsequent works.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientific Review Engineering and Environmental Sciences
Scientific Review Engineering and Environmental Sciences Earth and Planetary Sciences-Earth-Surface Processes
CiteScore
1.50
自引率
0.00%
发文量
24
审稿时长
26 weeks
期刊介绍: Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.
期刊最新文献
Enhancement of tensile performance of concrete by using synthetic polypropylene fibers Labor costs in a construction company in the Czech Republic – a case study A systematic review of clay shale research development for slope construction Implementing GIS and linear regression models to investigate partial building failures Evaluation of physical and mechanical properties of cement-treated base incorporating crushed waste tires
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1