{"title":"破裂的管道和破碎的梦想:关于肯尼亚巴林戈县大规模水利基础设施的破坏和重新利用","authors":"David Greven","doi":"10.1080/17531055.2023.2231790","DOIUrl":null,"url":null,"abstract":"ABSTRACT In the course of Kenya’s Vision 2030 development plan, the Kenyan Northern Rift Valley recently became the playground for new stakeholders, interests and speculations. Large-scale development projects, such as the geothermal exploration in Tiaty East sub-county, is one of them and is described as game-changer in a formerly marginalized area. This article explores the case of Mt. Paka, a dormant volcano, where the Kenyan Geothermal Development Company (GDC) recently finished their exploratory drillings and established a road and water infrastructure for the geothermal project and the adjacent communities. Drawing on ethnographic research, this contribution examines the dynamic processes of ruination, reappropriation and negotiation along the newly built water infrastructure. While GDC is constantly trying to counter the ruination of pipelines with maintenance and retrofitting, local communities utilize leakages along the infrastructure, maintaining it in its ruined state to satisfy their own needs. This study highlights how the water infrastructure at Mt. Paka materializes in unexpected ways and shows its transformative potential in two directions: the ruination and the reappropriation of it.","PeriodicalId":46968,"journal":{"name":"Journal of Eastern African Studies","volume":"17 1","pages":"241 - 261"},"PeriodicalIF":0.9000,"publicationDate":"2023-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Bursting pipes and broken dreams: on ruination and reappropriation of large-scale water infrastructure in Baringo County, Kenya\",\"authors\":\"David Greven\",\"doi\":\"10.1080/17531055.2023.2231790\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT In the course of Kenya’s Vision 2030 development plan, the Kenyan Northern Rift Valley recently became the playground for new stakeholders, interests and speculations. Large-scale development projects, such as the geothermal exploration in Tiaty East sub-county, is one of them and is described as game-changer in a formerly marginalized area. This article explores the case of Mt. Paka, a dormant volcano, where the Kenyan Geothermal Development Company (GDC) recently finished their exploratory drillings and established a road and water infrastructure for the geothermal project and the adjacent communities. Drawing on ethnographic research, this contribution examines the dynamic processes of ruination, reappropriation and negotiation along the newly built water infrastructure. While GDC is constantly trying to counter the ruination of pipelines with maintenance and retrofitting, local communities utilize leakages along the infrastructure, maintaining it in its ruined state to satisfy their own needs. This study highlights how the water infrastructure at Mt. Paka materializes in unexpected ways and shows its transformative potential in two directions: the ruination and the reappropriation of it.\",\"PeriodicalId\":46968,\"journal\":{\"name\":\"Journal of Eastern African Studies\",\"volume\":\"17 1\",\"pages\":\"241 - 261\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2023-04-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Eastern African Studies\",\"FirstCategoryId\":\"90\",\"ListUrlMain\":\"https://doi.org/10.1080/17531055.2023.2231790\",\"RegionNum\":3,\"RegionCategory\":\"社会学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"AREA STUDIES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Eastern African Studies","FirstCategoryId":"90","ListUrlMain":"https://doi.org/10.1080/17531055.2023.2231790","RegionNum":3,"RegionCategory":"社会学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"AREA STUDIES","Score":null,"Total":0}
Bursting pipes and broken dreams: on ruination and reappropriation of large-scale water infrastructure in Baringo County, Kenya
ABSTRACT In the course of Kenya’s Vision 2030 development plan, the Kenyan Northern Rift Valley recently became the playground for new stakeholders, interests and speculations. Large-scale development projects, such as the geothermal exploration in Tiaty East sub-county, is one of them and is described as game-changer in a formerly marginalized area. This article explores the case of Mt. Paka, a dormant volcano, where the Kenyan Geothermal Development Company (GDC) recently finished their exploratory drillings and established a road and water infrastructure for the geothermal project and the adjacent communities. Drawing on ethnographic research, this contribution examines the dynamic processes of ruination, reappropriation and negotiation along the newly built water infrastructure. While GDC is constantly trying to counter the ruination of pipelines with maintenance and retrofitting, local communities utilize leakages along the infrastructure, maintaining it in its ruined state to satisfy their own needs. This study highlights how the water infrastructure at Mt. Paka materializes in unexpected ways and shows its transformative potential in two directions: the ruination and the reappropriation of it.
期刊介绍:
Journal of Eastern African Studies is an international publication of the British Institute in Eastern Africa, published four times each year. It aims to promote fresh scholarly enquiry on the region from within the humanities and the social sciences, and to encourage work that communicates across disciplinary boundaries. It seeks to foster inter-disciplinary analysis, strong comparative perspectives, and research employing the most significant theoretical or methodological approaches for the region.