全面质量管理实践及其对印度建筑项目的影响

C. Vijayabanu, S. Karthikeyan, P. Vijay Surya
{"title":"全面质量管理实践及其对印度建筑项目的影响","authors":"C. Vijayabanu, S. Karthikeyan, P. Vijay Surya","doi":"10.2478/otmcj-2022-0013","DOIUrl":null,"url":null,"abstract":"Abstract Introduction The current competitiveness in the business arena of the construction industry has forced players to improve and optimise, forcing them to adopt the iterating process of continuous improvement that ensures the adequate quality of projects, in addition to moderating the cost and time involved in their implementation, the three of which have collectively been recognised as the primary factors causing the client's approval or disfavour in relation to a project. Purpose The primary intention of the current study is to analyse the effects of total quality management (TQM) practices for construction projects and their impact on productivity, cost reduction, quality of service, customer satisfaction and Timeliness of Service by conceptualising a model using second-generation partial least squares (PLS) structural equation model (SEM) approach in Tamil Nadu. Design/Methodology The primary data have been gathered through a sample survey collected from 94 respondents from Chennai, Kanchipuram, Coimbatore, Trichy, Karur and Tirunelveli districts of Tamil Nadu through the questionnaire. The responses were collected from various professionals in the field, such as project managers, contractors, engineers, consultants and supervisors. Findings This study also confirmed a significant and positive relationship between TQM practices and the performance of construction projects. TQM factors such as Benchmarking (BM), Employee Involvement and Empowerment (EMPINV), Innovation (INNOV), Supplier Quality Management (SPQM) and Technical (TECHN) are significant in determining the project's outcome by 79.5%. Practical implications The study's finding is of utmost importance because it helps build strategies and policies for the construction industry in the global competitive scenario, in promoting credibility and in increasing customer satisfaction.","PeriodicalId":42309,"journal":{"name":"Organization Technology and Management in Construction","volume":"14 1","pages":"2697 - 2709"},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Total quality management practices and its impact on Indian construction projects\",\"authors\":\"C. Vijayabanu, S. Karthikeyan, P. Vijay Surya\",\"doi\":\"10.2478/otmcj-2022-0013\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Introduction The current competitiveness in the business arena of the construction industry has forced players to improve and optimise, forcing them to adopt the iterating process of continuous improvement that ensures the adequate quality of projects, in addition to moderating the cost and time involved in their implementation, the three of which have collectively been recognised as the primary factors causing the client's approval or disfavour in relation to a project. Purpose The primary intention of the current study is to analyse the effects of total quality management (TQM) practices for construction projects and their impact on productivity, cost reduction, quality of service, customer satisfaction and Timeliness of Service by conceptualising a model using second-generation partial least squares (PLS) structural equation model (SEM) approach in Tamil Nadu. Design/Methodology The primary data have been gathered through a sample survey collected from 94 respondents from Chennai, Kanchipuram, Coimbatore, Trichy, Karur and Tirunelveli districts of Tamil Nadu through the questionnaire. The responses were collected from various professionals in the field, such as project managers, contractors, engineers, consultants and supervisors. Findings This study also confirmed a significant and positive relationship between TQM practices and the performance of construction projects. TQM factors such as Benchmarking (BM), Employee Involvement and Empowerment (EMPINV), Innovation (INNOV), Supplier Quality Management (SPQM) and Technical (TECHN) are significant in determining the project's outcome by 79.5%. Practical implications The study's finding is of utmost importance because it helps build strategies and policies for the construction industry in the global competitive scenario, in promoting credibility and in increasing customer satisfaction.\",\"PeriodicalId\":42309,\"journal\":{\"name\":\"Organization Technology and Management in Construction\",\"volume\":\"14 1\",\"pages\":\"2697 - 2709\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Organization Technology and Management in Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/otmcj-2022-0013\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Organization Technology and Management in Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/otmcj-2022-0013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

摘要简介当前建筑业商业领域的竞争力迫使参与者进行改进和优化,迫使他们采用不断改进的迭代过程,以确保项目的足够质量,此外还要控制实施过程中涉及的成本和时间,这三个因素被统称为导致客户批准或不喜欢某个项目的主要因素。目的本研究的主要目的是分析建筑项目全面质量管理(TQM)实践的效果及其对生产力、成本降低、服务质量的影响,通过在泰米尔纳德邦使用第二代偏最小二乘(PLS)结构方程模型(SEM)方法对模型进行概念化,来提高客户满意度和服务及时性。设计/方法主要数据是通过问卷调查从泰米尔纳德邦钦奈、坎奇普拉姆、哥印拜陀、特里希、卡鲁尔和蒂鲁内韦利区的94名受访者中收集的。答复来自该领域的各种专业人员,如项目经理、承包商、工程师、顾问和监督员。研究结果本研究还证实了TQM实践与建筑项目绩效之间存在显著且积极的关系。TQM因素,如基准(BM)、员工参与和授权(EMPINV)、创新(INNOV),供应商质量管理(SPQM)和技术(TECHN)在确定79.5%的项目结果方面具有重要意义。实际意义该研究的发现至关重要,因为它有助于在全球竞争环境中为建筑业制定战略和政策,提高可信度,提高客户满意度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Total quality management practices and its impact on Indian construction projects
Abstract Introduction The current competitiveness in the business arena of the construction industry has forced players to improve and optimise, forcing them to adopt the iterating process of continuous improvement that ensures the adequate quality of projects, in addition to moderating the cost and time involved in their implementation, the three of which have collectively been recognised as the primary factors causing the client's approval or disfavour in relation to a project. Purpose The primary intention of the current study is to analyse the effects of total quality management (TQM) practices for construction projects and their impact on productivity, cost reduction, quality of service, customer satisfaction and Timeliness of Service by conceptualising a model using second-generation partial least squares (PLS) structural equation model (SEM) approach in Tamil Nadu. Design/Methodology The primary data have been gathered through a sample survey collected from 94 respondents from Chennai, Kanchipuram, Coimbatore, Trichy, Karur and Tirunelveli districts of Tamil Nadu through the questionnaire. The responses were collected from various professionals in the field, such as project managers, contractors, engineers, consultants and supervisors. Findings This study also confirmed a significant and positive relationship between TQM practices and the performance of construction projects. TQM factors such as Benchmarking (BM), Employee Involvement and Empowerment (EMPINV), Innovation (INNOV), Supplier Quality Management (SPQM) and Technical (TECHN) are significant in determining the project's outcome by 79.5%. Practical implications The study's finding is of utmost importance because it helps build strategies and policies for the construction industry in the global competitive scenario, in promoting credibility and in increasing customer satisfaction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.10
自引率
0.00%
发文量
8
审稿时长
16 weeks
期刊最新文献
Project success and critical success factors of construction projects: project practitioners’ perspectives Exploring the social legitimacy of urban road PPPs in Nigeria Capability improvement measures of the public sector for implementation of building information modeling in construction projects Linking life cycle BIM data to a facility management system using Revit Dynamo Investigation of the poor-quality practices on building construction sites in Malaysia
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1