采用公私合作方案的收费公路基础设施项目绩效

IF 0.6 Q2 Social Sciences Economic Annals-XXI Pub Date : 2021-10-19 DOI:10.21003/ea.v193-14
Laode Nusriadi, Ilya Avianti, Nanny Dewi Tanzil, D. Parikesit
{"title":"采用公私合作方案的收费公路基础设施项目绩效","authors":"Laode Nusriadi, Ilya Avianti, Nanny Dewi Tanzil, D. Parikesit","doi":"10.21003/ea.v193-14","DOIUrl":null,"url":null,"abstract":"Public-private partnership (PPP) models were employed, especially in the toll road sector, by many governments to boost the development of the infrastructure and build strong connections among regions. PPPs are chosen as a scheme to fill the financial gap. Good project governance is one of the crucial points that should be supported by several significant factors, which will significantly affect projects’ performance. This study analyzes the influence of projects’ intellectual capital, investor protection mechanism, and ownership structure on the implementation of good project governance and the implications for their performance. The data were obtained through questionnaires sent to 43 public-private partnerships in toll road projects in Indonesia. The partial-least-square structural equation model (SEM) was subsequently employed to analyze the data. The study findings showed that (1) projects’ intellectual capital and ownership structure affect the implementation of good project governance, (2) the implementation of good project governance affects projects’ performance, and (3) projects’ intellectual capital and ownership structure affect their performance through the implementation of good project governance. However, the other five hypotheses investigated, namely those concerning projects’ intellectual capital, investor protection mechanism, ownership structure in project performance, investor protection mechanism for the implementation of good project governance, and project performance through the implementation of good project governance, were not supported. This study provides a knowledge basis enabling decision makers to understand precisely the factors that affect project performance through the implementation of good project governance.","PeriodicalId":51923,"journal":{"name":"Economic Annals-XXI","volume":null,"pages":null},"PeriodicalIF":0.6000,"publicationDate":"2021-10-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Project performance in a toll road infrastructure with a public-private partnership scheme\",\"authors\":\"Laode Nusriadi, Ilya Avianti, Nanny Dewi Tanzil, D. Parikesit\",\"doi\":\"10.21003/ea.v193-14\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Public-private partnership (PPP) models were employed, especially in the toll road sector, by many governments to boost the development of the infrastructure and build strong connections among regions. PPPs are chosen as a scheme to fill the financial gap. Good project governance is one of the crucial points that should be supported by several significant factors, which will significantly affect projects’ performance. This study analyzes the influence of projects’ intellectual capital, investor protection mechanism, and ownership structure on the implementation of good project governance and the implications for their performance. The data were obtained through questionnaires sent to 43 public-private partnerships in toll road projects in Indonesia. The partial-least-square structural equation model (SEM) was subsequently employed to analyze the data. The study findings showed that (1) projects’ intellectual capital and ownership structure affect the implementation of good project governance, (2) the implementation of good project governance affects projects’ performance, and (3) projects’ intellectual capital and ownership structure affect their performance through the implementation of good project governance. However, the other five hypotheses investigated, namely those concerning projects’ intellectual capital, investor protection mechanism, ownership structure in project performance, investor protection mechanism for the implementation of good project governance, and project performance through the implementation of good project governance, were not supported. This study provides a knowledge basis enabling decision makers to understand precisely the factors that affect project performance through the implementation of good project governance.\",\"PeriodicalId\":51923,\"journal\":{\"name\":\"Economic Annals-XXI\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.6000,\"publicationDate\":\"2021-10-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Economic Annals-XXI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21003/ea.v193-14\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Social Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Economic Annals-XXI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21003/ea.v193-14","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Social Sciences","Score":null,"Total":0}
引用次数: 1

摘要

许多政府采用公私合作(PPP)模式,特别是在收费公路部门,以促进基础设施的发展,并在各地区之间建立强有力的联系。购买力平价被选为填补财政缺口的方案。良好的项目治理是几个重要因素支持的关键点之一,这些因素将对项目的绩效产生重大影响。本研究分析了项目的知识资本、投资者保护机制和所有权结构对实施良好项目治理的影响及其对其绩效的影响。这些数据是通过向印度尼西亚43个收费公路项目的公私伙伴关系发送的问卷获得的。随后采用偏最小二乘结构方程模型(SEM)对数据进行分析。研究结果表明:(1)项目的智力资本和所有权结构影响良好项目治理的实施。然而,调查的其他五个假设,即关于项目的知识资本、投资者保护机制、项目绩效中的所有权结构、实施良好项目治理的投资者保护机制以及通过实施良好项目管理实现项目绩效的假设,都没有得到支持。这项研究提供了一个知识基础,使决策者能够通过实施良好的项目治理来准确了解影响项目绩效的因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Project performance in a toll road infrastructure with a public-private partnership scheme
Public-private partnership (PPP) models were employed, especially in the toll road sector, by many governments to boost the development of the infrastructure and build strong connections among regions. PPPs are chosen as a scheme to fill the financial gap. Good project governance is one of the crucial points that should be supported by several significant factors, which will significantly affect projects’ performance. This study analyzes the influence of projects’ intellectual capital, investor protection mechanism, and ownership structure on the implementation of good project governance and the implications for their performance. The data were obtained through questionnaires sent to 43 public-private partnerships in toll road projects in Indonesia. The partial-least-square structural equation model (SEM) was subsequently employed to analyze the data. The study findings showed that (1) projects’ intellectual capital and ownership structure affect the implementation of good project governance, (2) the implementation of good project governance affects projects’ performance, and (3) projects’ intellectual capital and ownership structure affect their performance through the implementation of good project governance. However, the other five hypotheses investigated, namely those concerning projects’ intellectual capital, investor protection mechanism, ownership structure in project performance, investor protection mechanism for the implementation of good project governance, and project performance through the implementation of good project governance, were not supported. This study provides a knowledge basis enabling decision makers to understand precisely the factors that affect project performance through the implementation of good project governance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Economic Annals-XXI
Economic Annals-XXI ECONOMICS-
CiteScore
1.50
自引率
0.00%
发文量
0
期刊介绍: The Economic Annals-XXI Journal – recognized in Ukraine and abroad scientific-analytic edition. Scientific articles of leading Ukrainian and other foreign scientists, postgraduate students and doctorates, deputies of Ukraine, heads of state and local authorities, materials of scientific conferences and seminars; reviews on scientific monographs, etc. are regularly published in this Journal.
期刊最新文献
Economic aspects of obtaining a functional creamy vegetable spread with a balanced fatty acid composition System characteristics and matrix tools for evaluating innovative business models of youth tourism Empirical study of business intelligence systems and their influence on innovation performance Phenomenology of the scientific system of Kazakhstan: a study of social and economic effects through the Hofstede’s five-dimensional model of cultural space and beyond Economic viability and market potential of combined intermediate moisture dairy products production in Kazakhstan
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1