凝析气田油气开采中气循环周期的评价

S. Matkivskyi, O. Burachok, L. Matiishyn
{"title":"凝析气田油气开采中气循环周期的评价","authors":"S. Matkivskyi, O. Burachok, L. Matiishyn","doi":"10.5604/01.3001.0016.1776","DOIUrl":null,"url":null,"abstract":"Optimization of formation pressure maintenance technologies in the development of gas condensate fields with a high initial content of condensate in the reservoir gas using numerical modelling.\n\nA study on the efficiency of dry gas injection for pressure maintenance in gas condensate fields was performed with the help of numerical 3D models. Key technological indicators of the reservoir development were calculated for the dry gas injection period of 12, 24, 36, 48, and 60 months. The results are presented as plots for the parameters in a study.\n\nBased on the results of the studies, it was found that the introduction of dry gas injection technology ensures that reservoir pressure is maintained at the highest level compared to the development of gas condensate reservoirs on primary depletion. Due to this, further condensate drop-out in the reservoir is slowed down, and the production of partly already condensed hydrocarbons is ensured by their evaporation into the dry gas injected from the surface. The simulation results indicate that increase in the injection duration period leads to an increase of the cumulative condensate production and hence the final hydrocarbon recovery factor.\n\nThe heterogeneity of oil and gas deposits, both in terms of area and thickness, significantly affects the efficiency of the developed hydrocarbon enhancement technologies. In order to minimize the negative impact of heterogeneity, it is necessary to conduct additional studies on the conditions of specific reservoirs or fields.\n\nThe reservoir pressure maintenance technology implementation according to various technological schemes, as well as using various types of injection agents, will significantly intensify the development of depleted gas condensate fields with a high condensate yield.\n\nStatistical analysis of the simulation results identified the optimum value of the dry gas injection period into the gas condensate reservoir, which is 34.3 months for the conditions of a given reservoir in the study.\n\n","PeriodicalId":8297,"journal":{"name":"Archives of materials science and engineering","volume":" ","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of the gas recycling duration on the hydrocarbon recovery from gas condensate fields\",\"authors\":\"S. Matkivskyi, O. Burachok, L. Matiishyn\",\"doi\":\"10.5604/01.3001.0016.1776\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Optimization of formation pressure maintenance technologies in the development of gas condensate fields with a high initial content of condensate in the reservoir gas using numerical modelling.\\n\\nA study on the efficiency of dry gas injection for pressure maintenance in gas condensate fields was performed with the help of numerical 3D models. Key technological indicators of the reservoir development were calculated for the dry gas injection period of 12, 24, 36, 48, and 60 months. The results are presented as plots for the parameters in a study.\\n\\nBased on the results of the studies, it was found that the introduction of dry gas injection technology ensures that reservoir pressure is maintained at the highest level compared to the development of gas condensate reservoirs on primary depletion. Due to this, further condensate drop-out in the reservoir is slowed down, and the production of partly already condensed hydrocarbons is ensured by their evaporation into the dry gas injected from the surface. The simulation results indicate that increase in the injection duration period leads to an increase of the cumulative condensate production and hence the final hydrocarbon recovery factor.\\n\\nThe heterogeneity of oil and gas deposits, both in terms of area and thickness, significantly affects the efficiency of the developed hydrocarbon enhancement technologies. In order to minimize the negative impact of heterogeneity, it is necessary to conduct additional studies on the conditions of specific reservoirs or fields.\\n\\nThe reservoir pressure maintenance technology implementation according to various technological schemes, as well as using various types of injection agents, will significantly intensify the development of depleted gas condensate fields with a high condensate yield.\\n\\nStatistical analysis of the simulation results identified the optimum value of the dry gas injection period into the gas condensate reservoir, which is 34.3 months for the conditions of a given reservoir in the study.\\n\\n\",\"PeriodicalId\":8297,\"journal\":{\"name\":\"Archives of materials science and engineering\",\"volume\":\" \",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of materials science and engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5604/01.3001.0016.1776\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Materials Science\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of materials science and engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0016.1776","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Materials Science","Score":null,"Total":0}
引用次数: 0

摘要

基于数值模拟的高凝析气初始含量凝析气田开发中地层压力维持技术优化利用三维数值模型对凝析气田干注保压效率进行了研究。计算了干气注入周期为12、24、36、48、60个月的储层开发关键技术指标。结果以图的形式表示研究中的参数。研究结果表明,相对于凝析气藏一次衰竭开发,干注气技术的引入确保了储层压力保持在最高水平。因此,油藏中的凝析液进一步下降的速度会减慢,并且已经部分冷凝的碳氢化合物的生产通过将其蒸发到从地面注入的干气中来保证。模拟结果表明,注入时间的增加导致累积凝析油产量的增加,从而提高最终的油气采收率。油气沉积面积和厚度的非均质性对已开发的油气强化技术的效果有显著影响。为了尽量减少非均质性的负面影响,有必要对特定油藏或油田的条件进行额外的研究。根据各种技术方案实施储层保压技术,使用各种类型的注入剂,将大大加强高凝析油枯竭凝析气田的开发。通过对模拟结果的统计分析,确定了在给定储层条件下凝析气藏干气注入周期的最佳值为34.3个月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Evaluation of the gas recycling duration on the hydrocarbon recovery from gas condensate fields
Optimization of formation pressure maintenance technologies in the development of gas condensate fields with a high initial content of condensate in the reservoir gas using numerical modelling. A study on the efficiency of dry gas injection for pressure maintenance in gas condensate fields was performed with the help of numerical 3D models. Key technological indicators of the reservoir development were calculated for the dry gas injection period of 12, 24, 36, 48, and 60 months. The results are presented as plots for the parameters in a study. Based on the results of the studies, it was found that the introduction of dry gas injection technology ensures that reservoir pressure is maintained at the highest level compared to the development of gas condensate reservoirs on primary depletion. Due to this, further condensate drop-out in the reservoir is slowed down, and the production of partly already condensed hydrocarbons is ensured by their evaporation into the dry gas injected from the surface. The simulation results indicate that increase in the injection duration period leads to an increase of the cumulative condensate production and hence the final hydrocarbon recovery factor. The heterogeneity of oil and gas deposits, both in terms of area and thickness, significantly affects the efficiency of the developed hydrocarbon enhancement technologies. In order to minimize the negative impact of heterogeneity, it is necessary to conduct additional studies on the conditions of specific reservoirs or fields. The reservoir pressure maintenance technology implementation according to various technological schemes, as well as using various types of injection agents, will significantly intensify the development of depleted gas condensate fields with a high condensate yield. Statistical analysis of the simulation results identified the optimum value of the dry gas injection period into the gas condensate reservoir, which is 34.3 months for the conditions of a given reservoir in the study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Archives of materials science and engineering
Archives of materials science and engineering Materials Science-Materials Science (all)
CiteScore
2.90
自引率
0.00%
发文量
15
期刊最新文献
Heat transfer improvement using additive manufacturing technologies: a review Influence of manganese content on the microstructure and properties of AlSi10MnMg(Fe) alloy for die castings An experimental and theoretical piezoelectric energy harvesting from a simply supported beam with moving mass Details Matter in Structure-based Drug Design. Investigation of the effect of polymer concentration in fracturing fluid on crack size and permeability during hydraulic fracturing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1