利用延时地震信号标定4D岩石弹性模型

Q2 Earth and Planetary Sciences Leading Edge Pub Date : 2022-12-01 DOI:10.1190/tle41120824.1
D. Rappin, P. Trinh
{"title":"利用延时地震信号标定4D岩石弹性模型","authors":"D. Rappin, P. Trinh","doi":"10.1190/tle41120824.1","DOIUrl":null,"url":null,"abstract":"In the last two decades, 4D seismic monitoring has become a widely used technique for oil and gas field production. Modeling studies are a standard for defining reservoir monitoring plans, optimizing survey design, and justifying the expense of data acquisition. Discrepancies between 4D seismic data and synthetic results can be analyzed through petroelastic modeling of reservoir simulations. However, assuming that a history match is available and that the reservoir model and fluid-flow simulation results can be trusted, characterization of pressure and fluid changes in the field remain challenging. A workflow is proposed to adjust the 4D petroelastic model (PEM) to better fit 4D seismic attributes with the dynamic behavior of the reservoir. The input data for 4D inversion consist of multiple broadband 4D-compliant processed base and monitor surveys recorded in a highly depleted clastic field offshore Africa. The broadband inversion results greatly reduce the background noise level, enhance the signal-to-noise ratio, and improve the definition of 4D signals. Due to various production effects all over the field, a new global calibration workflow to speed up the 4D petroelastic model adjustment is proposed. The combination of good 4D seismic inversions and a well-calibrated PEM is expected to have a significant impact on the reservoir monitoring. During the calibration process, reservoir model discrepancies with 4D seismic attributes can be identified, suggesting some updates of the reservoir model. In addition, when further monitors are considered, the calibrated 4D PEM provides more reliable predictability.","PeriodicalId":35661,"journal":{"name":"Leading Edge","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2022-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"4D petroelastic model calibration using time-lapse seismic signal\",\"authors\":\"D. Rappin, P. Trinh\",\"doi\":\"10.1190/tle41120824.1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the last two decades, 4D seismic monitoring has become a widely used technique for oil and gas field production. Modeling studies are a standard for defining reservoir monitoring plans, optimizing survey design, and justifying the expense of data acquisition. Discrepancies between 4D seismic data and synthetic results can be analyzed through petroelastic modeling of reservoir simulations. However, assuming that a history match is available and that the reservoir model and fluid-flow simulation results can be trusted, characterization of pressure and fluid changes in the field remain challenging. A workflow is proposed to adjust the 4D petroelastic model (PEM) to better fit 4D seismic attributes with the dynamic behavior of the reservoir. The input data for 4D inversion consist of multiple broadband 4D-compliant processed base and monitor surveys recorded in a highly depleted clastic field offshore Africa. The broadband inversion results greatly reduce the background noise level, enhance the signal-to-noise ratio, and improve the definition of 4D signals. Due to various production effects all over the field, a new global calibration workflow to speed up the 4D petroelastic model adjustment is proposed. The combination of good 4D seismic inversions and a well-calibrated PEM is expected to have a significant impact on the reservoir monitoring. During the calibration process, reservoir model discrepancies with 4D seismic attributes can be identified, suggesting some updates of the reservoir model. In addition, when further monitors are considered, the calibrated 4D PEM provides more reliable predictability.\",\"PeriodicalId\":35661,\"journal\":{\"name\":\"Leading Edge\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Leading Edge\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1190/tle41120824.1\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Leading Edge","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1190/tle41120824.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

在过去的二十年里,4D地震监测已成为油气田生产中广泛使用的技术。建模研究是确定储层监测计划、优化勘测设计和证明数据采集费用的标准。4D地震数据和合成结果之间的差异可以通过储层模拟的岩石弹性建模来分析。然而,假设历史匹配是可用的,并且储层模型和流体流动模拟结果是可信的,那么现场压力和流体变化的表征仍然具有挑战性。提出了一种调整4D岩石弹性模型(PEM)的工作流程,以更好地将4D地震属性与储层的动态行为相拟合。4D反演的输入数据包括在非洲近海一个高度枯竭的碎屑岩场记录的多个宽带4D兼容处理基础和监测调查。宽带反演结果大大降低了背景噪声水平,提高了信噪比,提高了4D信号的清晰度。由于油田生产效果各异,提出了一种新的全局标定工作流程,以加快4D岩石弹性模型的调整。良好的4D地震反演和校准良好的PEM的组合预计将对储层监测产生重大影响。在校准过程中,可以识别具有4D地震属性的储层模型差异,这表明储层模型进行了一些更新。此外,当考虑进一步的监测器时,校准的4D PEM提供了更可靠的可预测性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
4D petroelastic model calibration using time-lapse seismic signal
In the last two decades, 4D seismic monitoring has become a widely used technique for oil and gas field production. Modeling studies are a standard for defining reservoir monitoring plans, optimizing survey design, and justifying the expense of data acquisition. Discrepancies between 4D seismic data and synthetic results can be analyzed through petroelastic modeling of reservoir simulations. However, assuming that a history match is available and that the reservoir model and fluid-flow simulation results can be trusted, characterization of pressure and fluid changes in the field remain challenging. A workflow is proposed to adjust the 4D petroelastic model (PEM) to better fit 4D seismic attributes with the dynamic behavior of the reservoir. The input data for 4D inversion consist of multiple broadband 4D-compliant processed base and monitor surveys recorded in a highly depleted clastic field offshore Africa. The broadband inversion results greatly reduce the background noise level, enhance the signal-to-noise ratio, and improve the definition of 4D signals. Due to various production effects all over the field, a new global calibration workflow to speed up the 4D petroelastic model adjustment is proposed. The combination of good 4D seismic inversions and a well-calibrated PEM is expected to have a significant impact on the reservoir monitoring. During the calibration process, reservoir model discrepancies with 4D seismic attributes can be identified, suggesting some updates of the reservoir model. In addition, when further monitors are considered, the calibrated 4D PEM provides more reliable predictability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Leading Edge
Leading Edge Earth and Planetary Sciences-Geology
CiteScore
3.10
自引率
0.00%
发文量
180
期刊介绍: THE LEADING EDGE complements GEOPHYSICS, SEG"s peer-reviewed publication long unrivalled as the world"s most respected vehicle for dissemination of developments in exploration and development geophysics. TLE is a gateway publication, introducing new geophysical theory, instrumentation, and established practices to scientists in a wide range of geoscience disciplines. Most material is presented in a semitechnical manner that minimizes mathematical theory and emphasizes practical applications. TLE also serves as SEG"s publication venue for official society business.
期刊最新文献
Earth Science Week explores innovations in the geosciences Predictive monitoring of urban slope instabilities using geophysics and wireless sensor networks Seismic Soundoff: How to unlock the power of networking Hydrogeologic controls on barrier island geomorphology: Insights from electromagnetic surveys Reviews
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1