Wenkai Dong;Zhigang Lu;Liangce He;Jiangfeng Zhang;Tao Ma;Xiaobo Cao
{"title":"考虑综合需求响应和双向能量交换的综合能源系统最优扩展规划模型","authors":"Wenkai Dong;Zhigang Lu;Liangce He;Jiangfeng Zhang;Tao Ma;Xiaobo Cao","doi":"10.17775/CSEEJPES.2021.09220","DOIUrl":null,"url":null,"abstract":"The challenges of energy shortage and environmental protection motivate people to take various measures to use energy wisely, and integrated energy systems are such a measure to tackle this challenge. In this paper, an optimal expansion planning model for an integrated energy system consisting of power grid, gas network and multiple energy hubs is proposed, where the planning objective is to minimize operational fuel cost and capital investment cost covering carbon capture equipment and energy hubs among others. To demonstrate the advantage of the proposed planning model, six case studies are investigated, and 13.47% annual cost savings can be achieved compared with the baseline planning scenario, which does not consider bidirectional energy exchange and integrated demand response program.","PeriodicalId":10729,"journal":{"name":"CSEE Journal of Power and Energy Systems","volume":"9 4","pages":"1449-1459"},"PeriodicalIF":6.9000,"publicationDate":"2023-04-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://ieeexplore.ieee.org/iel7/7054730/10213441/10106193.pdf","citationCount":"0","resultStr":"{\"title\":\"Optimal Expansion Planning Model for Integrated Energy System Considering Integrated Demand Response and Bidirectional Energy Exchange\",\"authors\":\"Wenkai Dong;Zhigang Lu;Liangce He;Jiangfeng Zhang;Tao Ma;Xiaobo Cao\",\"doi\":\"10.17775/CSEEJPES.2021.09220\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The challenges of energy shortage and environmental protection motivate people to take various measures to use energy wisely, and integrated energy systems are such a measure to tackle this challenge. In this paper, an optimal expansion planning model for an integrated energy system consisting of power grid, gas network and multiple energy hubs is proposed, where the planning objective is to minimize operational fuel cost and capital investment cost covering carbon capture equipment and energy hubs among others. To demonstrate the advantage of the proposed planning model, six case studies are investigated, and 13.47% annual cost savings can be achieved compared with the baseline planning scenario, which does not consider bidirectional energy exchange and integrated demand response program.\",\"PeriodicalId\":10729,\"journal\":{\"name\":\"CSEE Journal of Power and Energy Systems\",\"volume\":\"9 4\",\"pages\":\"1449-1459\"},\"PeriodicalIF\":6.9000,\"publicationDate\":\"2023-04-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://ieeexplore.ieee.org/iel7/7054730/10213441/10106193.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CSEE Journal of Power and Energy Systems\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10106193/\",\"RegionNum\":2,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CSEE Journal of Power and Energy Systems","FirstCategoryId":"1087","ListUrlMain":"https://ieeexplore.ieee.org/document/10106193/","RegionNum":2,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
Optimal Expansion Planning Model for Integrated Energy System Considering Integrated Demand Response and Bidirectional Energy Exchange
The challenges of energy shortage and environmental protection motivate people to take various measures to use energy wisely, and integrated energy systems are such a measure to tackle this challenge. In this paper, an optimal expansion planning model for an integrated energy system consisting of power grid, gas network and multiple energy hubs is proposed, where the planning objective is to minimize operational fuel cost and capital investment cost covering carbon capture equipment and energy hubs among others. To demonstrate the advantage of the proposed planning model, six case studies are investigated, and 13.47% annual cost savings can be achieved compared with the baseline planning scenario, which does not consider bidirectional energy exchange and integrated demand response program.
期刊介绍:
The CSEE Journal of Power and Energy Systems (JPES) is an international bimonthly journal published by the Chinese Society for Electrical Engineering (CSEE) in collaboration with CEPRI (China Electric Power Research Institute) and IEEE (The Institute of Electrical and Electronics Engineers) Inc. Indexed by SCI, Scopus, INSPEC, CSAD (Chinese Science Abstracts Database), DOAJ, and ProQuest, it serves as a platform for reporting cutting-edge theories, methods, technologies, and applications shaping the development of power systems in energy transition. The journal offers authors an international platform to enhance the reach and impact of their contributions.