{"title":"不爆破规范对深埋隧道工程的影响","authors":"V. Rajaram, D. P. O'Connor, L. Sakamoto","doi":"10.1016/0148-9062(92)93077-w","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":91142,"journal":{"name":"Mining engineering","volume":"44 1","pages":"254-258"},"PeriodicalIF":0.0000,"publicationDate":"1992-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0148-9062(92)93077-w","citationCount":"0","resultStr":"{\"title\":\"Impacts of the no-blasting specification on the Deep Tunnel project Chicago, IL\",\"authors\":\"V. Rajaram, D. P. O'Connor, L. Sakamoto\",\"doi\":\"10.1016/0148-9062(92)93077-w\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":91142,\"journal\":{\"name\":\"Mining engineering\",\"volume\":\"44 1\",\"pages\":\"254-258\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0148-9062(92)93077-w\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1016/0148-9062(92)93077-w\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1016/0148-9062(92)93077-w","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}