K. Mikityuk, L. Ammirabile, M. Forni, J. Jagielski, N. Girault, Á. Horváth, J. Kloosterman, M. Tarantino, A. Vasile
{"title":"欧洲原子能共同体ESNII/Gen IV快中子系统设计、安全评估、研发和许可项目审查","authors":"K. Mikityuk, L. Ammirabile, M. Forni, J. Jagielski, N. Girault, Á. Horváth, J. Kloosterman, M. Tarantino, A. Vasile","doi":"10.1051/epjn/2019007","DOIUrl":null,"url":null,"abstract":"Nine Euratom projects started since late 2011 in support of the infrastructure and R&D of the seven fast reactor systems are briefly presented in the paper in terms of key objectives, results and recommendations.","PeriodicalId":44454,"journal":{"name":"EPJ Nuclear Sciences & Technologies","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1051/epjn/2019007","citationCount":"2","resultStr":"{\"title\":\"Review of Euratom projects on design, safety assessment, R&D and licensing for ESNII/Gen-IV fast neutron systems\",\"authors\":\"K. Mikityuk, L. Ammirabile, M. Forni, J. Jagielski, N. Girault, Á. Horváth, J. Kloosterman, M. Tarantino, A. Vasile\",\"doi\":\"10.1051/epjn/2019007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nine Euratom projects started since late 2011 in support of the infrastructure and R&D of the seven fast reactor systems are briefly presented in the paper in terms of key objectives, results and recommendations.\",\"PeriodicalId\":44454,\"journal\":{\"name\":\"EPJ Nuclear Sciences & Technologies\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1051/epjn/2019007\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EPJ Nuclear Sciences & Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1051/epjn/2019007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"NUCLEAR SCIENCE & TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EPJ Nuclear Sciences & Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1051/epjn/2019007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"NUCLEAR SCIENCE & TECHNOLOGY","Score":null,"Total":0}
Review of Euratom projects on design, safety assessment, R&D and licensing for ESNII/Gen-IV fast neutron systems
Nine Euratom projects started since late 2011 in support of the infrastructure and R&D of the seven fast reactor systems are briefly presented in the paper in terms of key objectives, results and recommendations.