{"title":"预制、预应力混凝土梁桥粘结连接板分析","authors":"A. Gergess","doi":"10.15554/pcij64.3-03","DOIUrl":null,"url":null,"abstract":"■ The paper investigates the structural behavior of the bonded link slab and identifies a step-by-step procedure for the design of bonded link slabs for bridge structures in the medium-span-length range. Precast, prestressed concrete girders offer a cost-effective solution for the construction of bridge structures in the medium-span-length range (between 12 and 42 m [40 and 140 ft]). Generally, the precast concrete girders are erected as simply supported (Fig. 1) and the reinforced concrete deck slab is placed afterward (either cast in place or by using precast concrete slab units). In multiple-span construction (Fig. 1), the deck slab is made continuous over the intermediate supports to minimize the use of expansion joints. The portion of the deck slab connecting two adjacent simple-span girders is referred to as the link slab (Fig. 1). The link slab can be cast with the deck slab or separately after all dead loads are placed.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":null,"pages":null},"PeriodicalIF":0.9000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Analysis Of Bonded Link Slabs In Precast, Prestressed Concrete Girder Bridges\",\"authors\":\"A. Gergess\",\"doi\":\"10.15554/pcij64.3-03\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"■ The paper investigates the structural behavior of the bonded link slab and identifies a step-by-step procedure for the design of bonded link slabs for bridge structures in the medium-span-length range. Precast, prestressed concrete girders offer a cost-effective solution for the construction of bridge structures in the medium-span-length range (between 12 and 42 m [40 and 140 ft]). Generally, the precast concrete girders are erected as simply supported (Fig. 1) and the reinforced concrete deck slab is placed afterward (either cast in place or by using precast concrete slab units). In multiple-span construction (Fig. 1), the deck slab is made continuous over the intermediate supports to minimize the use of expansion joints. The portion of the deck slab connecting two adjacent simple-span girders is referred to as the link slab (Fig. 1). The link slab can be cast with the deck slab or separately after all dead loads are placed.\",\"PeriodicalId\":54637,\"journal\":{\"name\":\"PCI Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2019-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PCI Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.15554/pcij64.3-03\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/pcij64.3-03","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 3

摘要

■本文研究了粘结连接板的结构性能,并确定了中等跨距范围内桥梁结构的粘结连接板设计的逐步程序。预制、预应力混凝土梁为中等跨度范围(12至42米[40至140英尺])的桥梁结构建设提供了一种经济有效的解决方案。一般情况下,预制混凝土梁以简支形式安装(图1),随后放置钢筋混凝土板(就地浇筑或使用预制混凝土板单元)。在多跨结构中(图1),甲板板在中间支架上连续,以尽量减少伸缩缝的使用。连接相邻两简跨梁的桥板部分称为连接板(图1)。连接板可以与桥板一起浇筑,也可以在全部静载放置后单独浇筑。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis Of Bonded Link Slabs In Precast, Prestressed Concrete Girder Bridges
■ The paper investigates the structural behavior of the bonded link slab and identifies a step-by-step procedure for the design of bonded link slabs for bridge structures in the medium-span-length range. Precast, prestressed concrete girders offer a cost-effective solution for the construction of bridge structures in the medium-span-length range (between 12 and 42 m [40 and 140 ft]). Generally, the precast concrete girders are erected as simply supported (Fig. 1) and the reinforced concrete deck slab is placed afterward (either cast in place or by using precast concrete slab units). In multiple-span construction (Fig. 1), the deck slab is made continuous over the intermediate supports to minimize the use of expansion joints. The portion of the deck slab connecting two adjacent simple-span girders is referred to as the link slab (Fig. 1). The link slab can be cast with the deck slab or separately after all dead loads are placed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
PCI Journal
PCI Journal 工程技术-结构与建筑技术
自引率
9.10%
发文量
15
审稿时长
>12 weeks
期刊最新文献
Ultra-high-performance concrete research at PCI Experimental study on the use of compound alkaline materials to solidify lake sediments Axial load behavior of reinforced concrete columns with high-strength steel coiled strips as confinement Supply chain management for modular construction using building information modeling Investigating UHPC in deck bulb-tee girder connections, part 2: Full-scale experimental testing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1