AASHTO II型、III型、IV型和VI型桥梁梁中实测预应力损失与设计预应力损失的对比研究

IF 0.9 4区 工程技术 Q4 CONSTRUCTION & BUILDING TECHNOLOGY PCI Journal Pub Date : 2021-01-01 DOI:10.15554/PCIJ66.3-02
Ahmed Almohammedi, C. Murray, Canh N. Dang, W. Hale
{"title":"AASHTO II型、III型、IV型和VI型桥梁梁中实测预应力损失与设计预应力损失的对比研究","authors":"Ahmed Almohammedi, C. Murray, Canh N. Dang, W. Hale","doi":"10.15554/PCIJ66.3-02","DOIUrl":null,"url":null,"abstract":"Inaccurate prediction of prestress losses leads to inaccurate predictions for camber, deflection, and concrete stresses in a bridge girder. This study aims to improve the prediction of prestress losses and provides bridge designers with insights into the differences between design and actual concrete properties. Prestress losses, compressive strength, modulus of elasticity, shrinkage, and creep were measured for several American Association of State Highway and Transportation Officials (AASHTO) Types II, III, IV, and VI girders. The investigation revealed that the measured total prestress losses at the time of deck placement were lower than the design losses calculated using the refined estimates method of the 2017 AASHTO LRFD Bridge Design Specifications. This was mainly attributed to the actual concrete compressive strength at transfer being greater than the design compressive strength. This discrepancy was as high as 73% for some girders. It was also determined that the 2017 AASHTO LRFD specifications’ refined estimates method for estimating prestress losses overestimates the total prestress losses at the time of deck placement for AASHTO Types II and III girders.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":"66 1","pages":"32-48"},"PeriodicalIF":0.9000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Investigation of measured prestress losses compared with design prestress losses in AASHTO Types II, III, IV, and VI bridge girders\",\"authors\":\"Ahmed Almohammedi, C. Murray, Canh N. Dang, W. Hale\",\"doi\":\"10.15554/PCIJ66.3-02\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Inaccurate prediction of prestress losses leads to inaccurate predictions for camber, deflection, and concrete stresses in a bridge girder. This study aims to improve the prediction of prestress losses and provides bridge designers with insights into the differences between design and actual concrete properties. Prestress losses, compressive strength, modulus of elasticity, shrinkage, and creep were measured for several American Association of State Highway and Transportation Officials (AASHTO) Types II, III, IV, and VI girders. The investigation revealed that the measured total prestress losses at the time of deck placement were lower than the design losses calculated using the refined estimates method of the 2017 AASHTO LRFD Bridge Design Specifications. This was mainly attributed to the actual concrete compressive strength at transfer being greater than the design compressive strength. This discrepancy was as high as 73% for some girders. It was also determined that the 2017 AASHTO LRFD specifications’ refined estimates method for estimating prestress losses overestimates the total prestress losses at the time of deck placement for AASHTO Types II and III girders.\",\"PeriodicalId\":54637,\"journal\":{\"name\":\"PCI Journal\",\"volume\":\"66 1\",\"pages\":\"32-48\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PCI Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.15554/PCIJ66.3-02\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/PCIJ66.3-02","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 2

摘要

对预应力损失的不准确预测会导致对桥梁主梁的弧度、挠度和混凝土应力的不准确预测。本研究旨在改善预应力损失的预测,并为桥梁设计师提供设计和实际混凝土性能之间差异的见解。预应力损失、抗压强度、弹性模量、收缩和蠕变测量了几种美国国家公路和运输官员协会(AASHTO) II、III、IV和VI型梁。调查显示,在甲板铺设时测量的总预应力损失低于使用2017年AASHTO LRFD桥梁设计规范的改进估计方法计算的设计损失。这主要是由于混凝土在转移时的实际抗压强度大于设计抗压强度。对于某些梁,这种差异高达73%。此外,2017年AASHTO LRFD规范中估算预应力损失的精确估算方法高估了AASHTO II型和III型梁在甲板放置时的总预应力损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Investigation of measured prestress losses compared with design prestress losses in AASHTO Types II, III, IV, and VI bridge girders
Inaccurate prediction of prestress losses leads to inaccurate predictions for camber, deflection, and concrete stresses in a bridge girder. This study aims to improve the prediction of prestress losses and provides bridge designers with insights into the differences between design and actual concrete properties. Prestress losses, compressive strength, modulus of elasticity, shrinkage, and creep were measured for several American Association of State Highway and Transportation Officials (AASHTO) Types II, III, IV, and VI girders. The investigation revealed that the measured total prestress losses at the time of deck placement were lower than the design losses calculated using the refined estimates method of the 2017 AASHTO LRFD Bridge Design Specifications. This was mainly attributed to the actual concrete compressive strength at transfer being greater than the design compressive strength. This discrepancy was as high as 73% for some girders. It was also determined that the 2017 AASHTO LRFD specifications’ refined estimates method for estimating prestress losses overestimates the total prestress losses at the time of deck placement for AASHTO Types II and III girders.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
PCI Journal
PCI Journal 工程技术-结构与建筑技术
自引率
9.10%
发文量
15
审稿时长
>12 weeks
期刊最新文献
Kgaria (Boletaceae, Boletoideae) gen. nov. in Australia: Neither a Tylopilus nor a Porphyrellus. Ultra-high-performance concrete research at PCI Experimental study on the use of compound alkaline materials to solidify lake sediments Axial load behavior of reinforced concrete columns with high-strength steel coiled strips as confinement Supply chain management for modular construction using building information modeling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1