{"title":"倒塌的匹兹堡大桥在不到一年的时间里被重建","authors":"W. Atkinson","doi":"10.15554/pcij68.3-06","DOIUrl":null,"url":null,"abstract":"This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Collapsed Pittsburgh bridge replaced in less than a year\",\"authors\":\"W. Atkinson\",\"doi\":\"10.15554/pcij68.3-06\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.\",\"PeriodicalId\":54637,\"journal\":{\"name\":\"PCI Journal\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PCI Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.15554/pcij68.3-06\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/pcij68.3-06","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
Collapsed Pittsburgh bridge replaced in less than a year
This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.