倒塌的匹兹堡大桥在不到一年的时间里被重建

IF 0.9 4区 工程技术 Q4 CONSTRUCTION & BUILDING TECHNOLOGY PCI Journal Pub Date : 2023-01-01 DOI:10.15554/pcij68.3-06
W. Atkinson
{"title":"倒塌的匹兹堡大桥在不到一年的时间里被重建","authors":"W. Atkinson","doi":"10.15554/pcij68.3-06","DOIUrl":null,"url":null,"abstract":"This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.","PeriodicalId":54637,"journal":{"name":"PCI Journal","volume":"1 1","pages":""},"PeriodicalIF":0.9000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Collapsed Pittsburgh bridge replaced in less than a year\",\"authors\":\"W. Atkinson\",\"doi\":\"10.15554/pcij68.3-06\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.\",\"PeriodicalId\":54637,\"journal\":{\"name\":\"PCI Journal\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.9000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PCI Journal\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.15554/pcij68.3-06\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"CONSTRUCTION & BUILDING TECHNOLOGY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PCI Journal","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.15554/pcij68.3-06","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"CONSTRUCTION & BUILDING TECHNOLOGY","Score":null,"Total":0}
引用次数: 0

摘要

本项目重点讨论了如何使用预制混凝土在2022年1月倒塌后快速更换匹兹堡的Fern空心桥。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Collapsed Pittsburgh bridge replaced in less than a year
This Project Spotlight discusses how using precast concrete enabled the rapid replacement of Pittsburgh's Fern Hollow Bridge after the January 2022 collapse.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
PCI Journal
PCI Journal 工程技术-结构与建筑技术
自引率
9.10%
发文量
15
审稿时长
>12 weeks
期刊最新文献
Kgaria (Boletaceae, Boletoideae) gen. nov. in Australia: Neither a Tylopilus nor a Porphyrellus. Ultra-high-performance concrete research at PCI Experimental study on the use of compound alkaline materials to solidify lake sediments Axial load behavior of reinforced concrete columns with high-strength steel coiled strips as confinement Supply chain management for modular construction using building information modeling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1