铁路建设完工工程附加工程分析

A. Leśniak, F. Janowiec
{"title":"铁路建设完工工程附加工程分析","authors":"A. Leśniak, F. Janowiec","doi":"10.22630/pniks.2019.28.3.34","DOIUrl":null,"url":null,"abstract":"The railway construction investments are characterized by a significant extension of individual phases and an increased number of entities participating in the construction investment process. Despite the use of many modern methods and techniques unforeseen phenomena and events which may occur during the execution of the investment cannot be excluded. All unexpected situations usually initiate consequences in the form of additional workload and costs not included by the contractor and longer duration of works. This fact is commonly referred to as the occurrence of the so-called additional works. The paper presents the results of research concerning additional works occurring during the realization of railway construction projects performed in southern Poland. The analysis was based on data which concerned projects completed in the period from 1 January 2012 to 31 December 2018.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-09-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of additional works in completed railway construction projects\",\"authors\":\"A. Leśniak, F. Janowiec\",\"doi\":\"10.22630/pniks.2019.28.3.34\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The railway construction investments are characterized by a significant extension of individual phases and an increased number of entities participating in the construction investment process. Despite the use of many modern methods and techniques unforeseen phenomena and events which may occur during the execution of the investment cannot be excluded. All unexpected situations usually initiate consequences in the form of additional workload and costs not included by the contractor and longer duration of works. This fact is commonly referred to as the occurrence of the so-called additional works. The paper presents the results of research concerning additional works occurring during the realization of railway construction projects performed in southern Poland. The analysis was based on data which concerned projects completed in the period from 1 January 2012 to 31 December 2018.\",\"PeriodicalId\":38397,\"journal\":{\"name\":\"Scientific Review Engineering and Environmental Sciences\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Review Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22630/pniks.2019.28.3.34\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/pniks.2019.28.3.34","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

铁路建设投资具有阶段性显著延长和参与建设投资主体数量增加的特点。尽管使用了许多现代方法和技术,但不能排除在投资执行过程中可能发生的不可预见的现象和事件。所有意想不到的情况通常会导致承包商未包括的额外工作量和费用以及更长的工期。这一事实通常被称为所谓附加作品的发生。本文介绍了在波兰南部实施的铁路建设项目实现过程中发生的额外工程的研究结果。该分析基于2012年1月1日至2018年12月31日期间完成的项目数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Analysis of additional works in completed railway construction projects
The railway construction investments are characterized by a significant extension of individual phases and an increased number of entities participating in the construction investment process. Despite the use of many modern methods and techniques unforeseen phenomena and events which may occur during the execution of the investment cannot be excluded. All unexpected situations usually initiate consequences in the form of additional workload and costs not included by the contractor and longer duration of works. This fact is commonly referred to as the occurrence of the so-called additional works. The paper presents the results of research concerning additional works occurring during the realization of railway construction projects performed in southern Poland. The analysis was based on data which concerned projects completed in the period from 1 January 2012 to 31 December 2018.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientific Review Engineering and Environmental Sciences
Scientific Review Engineering and Environmental Sciences Earth and Planetary Sciences-Earth-Surface Processes
CiteScore
1.50
自引率
0.00%
发文量
24
审稿时长
26 weeks
期刊介绍: Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.
期刊最新文献
Enhancement of tensile performance of concrete by using synthetic polypropylene fibers Labor costs in a construction company in the Czech Republic – a case study A systematic review of clay shale research development for slope construction Implementing GIS and linear regression models to investigate partial building failures Evaluation of physical and mechanical properties of cement-treated base incorporating crushed waste tires
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1