银行监管监测的建设项目预算和进度的偏差和执行情况——以集体住宅为例

J. Konior, M. Szóstak
{"title":"银行监管监测的建设项目预算和进度的偏差和执行情况——以集体住宅为例","authors":"J. Konior, M. Szóstak","doi":"10.22630/pniks.2020.29.4.42","DOIUrl":null,"url":null,"abstract":"Time and cost are key elements that determine the success or failure of construction projects. The aim of the article is to analyze and assessment of the course of various construction projects in the field deviations and implementation of the budget and schedule of construction projects. Calculations made in accordance with the Earned Value Method methodology allowed the assessment of the actual cost of the work performed and scheduled for the analyzed construction projects. The data for analysis was obtained from the authors' own experience and professional work. The authors carried out Bank Investment Supervision in the years 2006 - 2019 on behalf of the banks that grant investment loans for non-public contracts.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Odchylenia i wykonania budżetu oraz harmonogramu przedsięwzięć budowlanych monitorowanych przez nadzór bankowy na przykładzie budynków zbiorowego zamieszkania\",\"authors\":\"J. Konior, M. Szóstak\",\"doi\":\"10.22630/pniks.2020.29.4.42\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Time and cost are key elements that determine the success or failure of construction projects. The aim of the article is to analyze and assessment of the course of various construction projects in the field deviations and implementation of the budget and schedule of construction projects. Calculations made in accordance with the Earned Value Method methodology allowed the assessment of the actual cost of the work performed and scheduled for the analyzed construction projects. The data for analysis was obtained from the authors' own experience and professional work. The authors carried out Bank Investment Supervision in the years 2006 - 2019 on behalf of the banks that grant investment loans for non-public contracts.\",\"PeriodicalId\":38397,\"journal\":{\"name\":\"Scientific Review Engineering and Environmental Sciences\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Review Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22630/pniks.2020.29.4.42\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/pniks.2020.29.4.42","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
引用次数: 0

摘要

时间和成本是决定建设项目成败的关键因素。本文的目的是分析和评估各种建设项目在现场实施过程中的偏差以及建设项目预算和进度的执行情况。根据挣值法的方法进行的计算,可以对所分析的建筑项目所进行的工作和计划的实际成本进行评估。分析数据来源于作者的亲身经历和专业工作。作者代表发放非公合同投资贷款的银行在2006 - 2019年进行了银行投资监管。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Odchylenia i wykonania budżetu oraz harmonogramu przedsięwzięć budowlanych monitorowanych przez nadzór bankowy na przykładzie budynków zbiorowego zamieszkania
Time and cost are key elements that determine the success or failure of construction projects. The aim of the article is to analyze and assessment of the course of various construction projects in the field deviations and implementation of the budget and schedule of construction projects. Calculations made in accordance with the Earned Value Method methodology allowed the assessment of the actual cost of the work performed and scheduled for the analyzed construction projects. The data for analysis was obtained from the authors' own experience and professional work. The authors carried out Bank Investment Supervision in the years 2006 - 2019 on behalf of the banks that grant investment loans for non-public contracts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientific Review Engineering and Environmental Sciences
Scientific Review Engineering and Environmental Sciences Earth and Planetary Sciences-Earth-Surface Processes
CiteScore
1.50
自引率
0.00%
发文量
24
审稿时长
26 weeks
期刊介绍: Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.
期刊最新文献
Enhancement of tensile performance of concrete by using synthetic polypropylene fibers Labor costs in a construction company in the Czech Republic – a case study A systematic review of clay shale research development for slope construction Implementing GIS and linear regression models to investigate partial building failures Evaluation of physical and mechanical properties of cement-treated base incorporating crushed waste tires
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1