Magdalena Kowacka, A. Duchaczek, Dominika Dudziak-Gajowiak, D. Skorupka, Agnieszka Waniewska
{"title":"用模糊逻辑确定大地测量工程的性质和风险值","authors":"Magdalena Kowacka, A. Duchaczek, Dominika Dudziak-Gajowiak, D. Skorupka, Agnieszka Waniewska","doi":"10.22630/pniks.2020.29.4.43","DOIUrl":null,"url":null,"abstract":"The article is a continuation of the series of works on the method for risk analysis in surveying works in road construction projects. The paper presents the application of fuzzy logic to determine the nature and value of the risk of surveying works based on a database of rules and affiliation functions provided by experts. The fact that the issue of occurrence of risk factors in road construction works is not deterministic justifies the above. In such works, there are many uncertainties in establishing the value of their duration in the long term. The theoretical framework of the method is presented together with an example of its application. Moreover, research results are compared with previous publications using other research tools.","PeriodicalId":38397,"journal":{"name":"Scientific Review Engineering and Environmental Sciences","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-12-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Określenie charakteru i wartości ryzyka prac geodezyjnych z zastosowaniem logiki rozmytej\",\"authors\":\"Magdalena Kowacka, A. Duchaczek, Dominika Dudziak-Gajowiak, D. Skorupka, Agnieszka Waniewska\",\"doi\":\"10.22630/pniks.2020.29.4.43\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article is a continuation of the series of works on the method for risk analysis in surveying works in road construction projects. The paper presents the application of fuzzy logic to determine the nature and value of the risk of surveying works based on a database of rules and affiliation functions provided by experts. The fact that the issue of occurrence of risk factors in road construction works is not deterministic justifies the above. In such works, there are many uncertainties in establishing the value of their duration in the long term. The theoretical framework of the method is presented together with an example of its application. Moreover, research results are compared with previous publications using other research tools.\",\"PeriodicalId\":38397,\"journal\":{\"name\":\"Scientific Review Engineering and Environmental Sciences\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Review Engineering and Environmental Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22630/pniks.2020.29.4.43\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Earth and Planetary Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Review Engineering and Environmental Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22630/pniks.2020.29.4.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Earth and Planetary Sciences","Score":null,"Total":0}
Określenie charakteru i wartości ryzyka prac geodezyjnych z zastosowaniem logiki rozmytej
The article is a continuation of the series of works on the method for risk analysis in surveying works in road construction projects. The paper presents the application of fuzzy logic to determine the nature and value of the risk of surveying works based on a database of rules and affiliation functions provided by experts. The fact that the issue of occurrence of risk factors in road construction works is not deterministic justifies the above. In such works, there are many uncertainties in establishing the value of their duration in the long term. The theoretical framework of the method is presented together with an example of its application. Moreover, research results are compared with previous publications using other research tools.
期刊介绍:
Scientific Review Engineering and Environmental Sciences [Przegląd Naukowy Inżynieria i Kształtowanie Środowiska] covers broad area of knowledge and practice on fields such as: sustainable development, landscaping of non-urbanized lands, environmental engineering, construction projects engineering land management, protection and land reclamation, environmental impact of investments, ecology, hydrology and water management, ground-water monitoring and restoration, geotechnical engineering, meteorology and connecting subjects. Authors are welcome to submit theoretical and practice-oriented papers containing detailed case studies within above mentioned disciplines. However, theoretical papers should contain part with practical application of the theory presented. Papers (in Polish or English languages) are accepted for publication after obtaining positive opinions of two reviewers. Papers published elsewhere are not accepted.