根据物理运动规律进行项目调度和预测

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2019-01-01 DOI:10.5267/j.jpm.2019.1.001
M. Bagherpour, Hamidreza Mardimamaqani, Amirhossein Fallahdizcheh, H. Steyn
{"title":"根据物理运动规律进行项目调度和预测","authors":"M. Bagherpour, Hamidreza Mardimamaqani, Amirhossein Fallahdizcheh, H. Steyn","doi":"10.5267/j.jpm.2019.1.001","DOIUrl":null,"url":null,"abstract":"Article history: Received: October 24 2018 Received in revised format: November 15 2018 Accepted: January 2 2019 Available online: January 4 2019 Measuring actual project progress and comparing it with the planned time schedule is essential in controlling of a project. The outcome of the latter follows the s-curve diagram, which compares actual progress with the planned amount and finally analyzing any gap between them to draw directions for project scheduling. However, final duration of the project cannot be either estimated or predicted through conventional methods. The new method, using Rules of kinematics, can calculate the final duration of the project. This novel approach is successfully implemented on a construction project. The first objective in new method is forecasting final duration of the project, finding equation path and draw a new s-curve diagram for actual status during the execution process. The second objective is to evaluate schedule performance of the project and report the status of the project at each period which is a useful tool for managers. © 2019 by the authors; licensee Growing Science, Canada.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/j.jpm.2019.1.001","citationCount":"1","resultStr":"{\"title\":\"Project scheduling and forecasting by laws of physical movement\",\"authors\":\"M. Bagherpour, Hamidreza Mardimamaqani, Amirhossein Fallahdizcheh, H. Steyn\",\"doi\":\"10.5267/j.jpm.2019.1.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Article history: Received: October 24 2018 Received in revised format: November 15 2018 Accepted: January 2 2019 Available online: January 4 2019 Measuring actual project progress and comparing it with the planned time schedule is essential in controlling of a project. The outcome of the latter follows the s-curve diagram, which compares actual progress with the planned amount and finally analyzing any gap between them to draw directions for project scheduling. However, final duration of the project cannot be either estimated or predicted through conventional methods. The new method, using Rules of kinematics, can calculate the final duration of the project. This novel approach is successfully implemented on a construction project. The first objective in new method is forecasting final duration of the project, finding equation path and draw a new s-curve diagram for actual status during the execution process. The second objective is to evaluate schedule performance of the project and report the status of the project at each period which is a useful tool for managers. © 2019 by the authors; licensee Growing Science, Canada.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.5267/j.jpm.2019.1.001\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2019.1.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2019.1.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

文章历史:收稿日期:2018年10月24日收稿日期:2018年11月15日接受日期:2019年1月2日在线提供日期:2019年1月4日测量实际项目进度并将其与计划时间表进行比较对于项目控制至关重要。后者的结果遵循s曲线图,将实际进度与计划数量进行比较,最后分析两者之间的差距,从而为项目调度指明方向。然而,项目的最终持续时间无法通过传统方法进行估计或预测。该方法利用运动学规则,可以计算出工程的最终工期。该方法已成功地应用于某建筑工程中。新方法的第一个目标是预测项目的最终工期,寻找方程路径,并绘制新的s曲线图,以反映项目执行过程中的实际状态。第二个目标是评估项目的进度绩效,并报告项目在每个阶段的状态,这是管理人员的有用工具。©2019作者所有;加拿大Growing Science公司
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Project scheduling and forecasting by laws of physical movement
Article history: Received: October 24 2018 Received in revised format: November 15 2018 Accepted: January 2 2019 Available online: January 4 2019 Measuring actual project progress and comparing it with the planned time schedule is essential in controlling of a project. The outcome of the latter follows the s-curve diagram, which compares actual progress with the planned amount and finally analyzing any gap between them to draw directions for project scheduling. However, final duration of the project cannot be either estimated or predicted through conventional methods. The new method, using Rules of kinematics, can calculate the final duration of the project. This novel approach is successfully implemented on a construction project. The first objective in new method is forecasting final duration of the project, finding equation path and draw a new s-curve diagram for actual status during the execution process. The second objective is to evaluate schedule performance of the project and report the status of the project at each period which is a useful tool for managers. © 2019 by the authors; licensee Growing Science, Canada.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1