项目进度的科学计量学调查

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2019-01-01 DOI:10.5267/J.JPM.2019.1.006
M. Ghaeli, S. Sadi-Nezhad
{"title":"项目进度的科学计量学调查","authors":"M. Ghaeli, S. Sadi-Nezhad","doi":"10.5267/J.JPM.2019.1.006","DOIUrl":null,"url":null,"abstract":"Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, \"decision support systems\" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2019-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.006","citationCount":"0","resultStr":"{\"title\":\"A scientometrics survey on project scheduling\",\"authors\":\"M. Ghaeli, S. Sadi-Nezhad\",\"doi\":\"10.5267/J.JPM.2019.1.006\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, \\\"decision support systems\\\" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2019-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.5267/J.JPM.2019.1.006\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/J.JPM.2019.1.006\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2019.1.006","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

文章历史:收到:2018年10月28日收到修订格式:2018年11月25日接受:2019年1月23日在线提供:2019年1月23日在项目管理中,时间表被认为是项目的里程碑,活动和可交付成果的列表,通常具有一些开始和完成时间表,这些时间表由项目时间表中包含的一些信息估计,包括资源分配,预算,任务持续时间以及依赖关系和计划事件的联系。本文对项目进度的相关研究进行了综述。该研究使用Scopus数据库作为主要搜索引擎,涵盖了1963年至2019年期间的3370条记录。对这些记录进行统计分析,并根据不同的标准进行分类。根据调查结果,“决策支持系统”是密度最高的关键词,其次是启发式方法。在被引次数最多的论文中,德国发表的论文被引次数最多(9084次),其次是美国(7058次)和比利时(4853次)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A scientometrics survey on project scheduling
Article history: Received: October 28 2018 Received in revised format: November 25 2018 Accepted: January 23 2019 Available online: January 23 2019 In project management, a schedule is considered as a list a project's milestones, activities, and deliverables, normally with some start and finish time schedule, which are estimated by some information incorporated in the project schedule including resource allocation, budget, task duration, and linkages of dependencies and scheduled events. This paper presents a comprehensive review of the studies associated with project scheduling. The study uses Scopus database as a primary search engine and covers 3370 records over the period 1963-2019. The records are statistically analyzed and categorized in terms of different criteria. Based on the survey, "decision support systems" is the keyword which has carried the highest densities followed by heuristics methods. Among the most cited articles, papers published by researchers in Germany have received the highest citations (9084), followed by United States (7058) and Belgium with 4853 citations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1