{"title":"建设项目政治风险研究的文献计量评价","authors":"Chunling Wei, Xiaopeng Deng, Tengyuan Chang, A. Mahmoudi, Safi Ullah","doi":"10.5267/J.JPM.2021.5.003","DOIUrl":null,"url":null,"abstract":"The current study aims to provide an overview of the research on political risk using the Web of Science(WoS)database as well as summarize research results and put forward some suggestions for research directions of political risk in international construction projects. It is the first time scientometric analysis of political risk research is executed. In this regard, the papers related to political risk in the WoS database have been retrieved and the literature is sorted out by visual and content analysis methods. Visual analysis is used to analyze the research overview, knowledge base, and research hotspots of this field. The content analysis method is adopted to expound the current research focus from three perspectives inducing the influence of political risk, risk assessment, and risk management measures. The results show that in the political risk context, the number of publications has experienced an increasing trend in recent years. Based on the existing literature on political risk for all companies, this overview provides some suggestions to address the political risk in international construction projects in the future. The results contribute to the scholars understanding of the research overview, research hotspots, and future research directions of political risk research in construction projects.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2021-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Bibliometric evaluation of research on political risks in construction projects\",\"authors\":\"Chunling Wei, Xiaopeng Deng, Tengyuan Chang, A. Mahmoudi, Safi Ullah\",\"doi\":\"10.5267/J.JPM.2021.5.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The current study aims to provide an overview of the research on political risk using the Web of Science(WoS)database as well as summarize research results and put forward some suggestions for research directions of political risk in international construction projects. It is the first time scientometric analysis of political risk research is executed. In this regard, the papers related to political risk in the WoS database have been retrieved and the literature is sorted out by visual and content analysis methods. Visual analysis is used to analyze the research overview, knowledge base, and research hotspots of this field. The content analysis method is adopted to expound the current research focus from three perspectives inducing the influence of political risk, risk assessment, and risk management measures. The results show that in the political risk context, the number of publications has experienced an increasing trend in recent years. Based on the existing literature on political risk for all companies, this overview provides some suggestions to address the political risk in international construction projects in the future. The results contribute to the scholars understanding of the research overview, research hotspots, and future research directions of political risk research in construction projects.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2021-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/J.JPM.2021.5.003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/J.JPM.2021.5.003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3
摘要
本研究旨在概述利用Web of Science(WoS)数据库对政治风险的研究概况,总结研究成果,并对国际建设项目政治风险的研究方向提出建议。这是首次对政治风险研究进行科学计量分析。为此,我们检索了WoS数据库中与政治风险相关的论文,并通过视觉分析和内容分析的方法对文献进行了整理。通过可视化分析,分析了该领域的研究概况、知识库和研究热点。采用内容分析法,从政治风险的影响、风险评估、风险管理措施三个角度阐述当前的研究热点。结果表明,在政治风险背景下,近年来出版物数量呈增加趋势。根据现有文献对所有公司的政治风险,本文概述了未来应对国际建设项目政治风险的一些建议。研究结果有助于学者了解建设项目政治风险研究的研究概况、研究热点以及未来的研究方向。
Bibliometric evaluation of research on political risks in construction projects
The current study aims to provide an overview of the research on political risk using the Web of Science(WoS)database as well as summarize research results and put forward some suggestions for research directions of political risk in international construction projects. It is the first time scientometric analysis of political risk research is executed. In this regard, the papers related to political risk in the WoS database have been retrieved and the literature is sorted out by visual and content analysis methods. Visual analysis is used to analyze the research overview, knowledge base, and research hotspots of this field. The content analysis method is adopted to expound the current research focus from three perspectives inducing the influence of political risk, risk assessment, and risk management measures. The results show that in the political risk context, the number of publications has experienced an increasing trend in recent years. Based on the existing literature on political risk for all companies, this overview provides some suggestions to address the political risk in international construction projects in the future. The results contribute to the scholars understanding of the research overview, research hotspots, and future research directions of political risk research in construction projects.