在建设项目中运用项目风险监测和控制方法及其与项目成功的关系

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2022-01-01 DOI:10.5267/j.jpm.2021.7.002
K. Obondi
{"title":"在建设项目中运用项目风险监测和控制方法及其与项目成功的关系","authors":"K. Obondi","doi":"10.5267/j.jpm.2021.7.002","DOIUrl":null,"url":null,"abstract":"Risk monitoring and control is often poorly implemented in construction projects because of a failure to monitor and manage identified risks. Construction companies experience significant losses due to project managers' lack of project risk monitoring and control in construction projects. Most studies have concentrated on risk identification, risk assessment, and risk analysis processes while neglecting crucial risk management processes of risk control, risk monitoring, and risk response. The lack of research on these three crucial processes highlights a gap in the literature concerning how these processes can increase the delivery of successful projects. The purpose of this study was to examine whether the utilization of project risk monitoring and control practices was related to project success in construction projects in the United States. An electronic survey instrument was used to collect data from a sample of 50 construction project managers in the Dallas-Fort Worth area in the state of Texas, in the United States. Spearman rho correlation analysis was used to examine the relationship between project risk monitoring and control practices and project success. The results of this study indicated that all project risk monitoring and control practices, including risk reassessment, risk audits, contingency reserves analysis, and risk status meetings, were significantly and positively related to project success in construction projects. One of the recommendations presented in this study was that future research should conduct the same study in developing countries to see if the study’s findings remain the same and generalizable. The study concluded that construction organizations should regularly consider the importance and usage of project risk monitoring and control practices and apply them to improve the success rate of a project.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"The utilization of project risk monitoring and control practices and their relationship with project success in construction projects\",\"authors\":\"K. Obondi\",\"doi\":\"10.5267/j.jpm.2021.7.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk monitoring and control is often poorly implemented in construction projects because of a failure to monitor and manage identified risks. Construction companies experience significant losses due to project managers' lack of project risk monitoring and control in construction projects. Most studies have concentrated on risk identification, risk assessment, and risk analysis processes while neglecting crucial risk management processes of risk control, risk monitoring, and risk response. The lack of research on these three crucial processes highlights a gap in the literature concerning how these processes can increase the delivery of successful projects. The purpose of this study was to examine whether the utilization of project risk monitoring and control practices was related to project success in construction projects in the United States. An electronic survey instrument was used to collect data from a sample of 50 construction project managers in the Dallas-Fort Worth area in the state of Texas, in the United States. Spearman rho correlation analysis was used to examine the relationship between project risk monitoring and control practices and project success. The results of this study indicated that all project risk monitoring and control practices, including risk reassessment, risk audits, contingency reserves analysis, and risk status meetings, were significantly and positively related to project success in construction projects. One of the recommendations presented in this study was that future research should conduct the same study in developing countries to see if the study’s findings remain the same and generalizable. The study concluded that construction organizations should regularly consider the importance and usage of project risk monitoring and control practices and apply them to improve the success rate of a project.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2021.7.002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2021.7.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 7

摘要

由于未能监测和管理已识别的风险,风险监测和控制在建设项目中往往执行得很差。在建设项目中,由于项目管理者缺乏对项目风险的监测和控制,使施工企业蒙受了重大损失。大多数研究集中在风险识别、风险评估和风险分析过程,而忽视了风险控制、风险监测和风险应对等关键的风险管理过程。缺乏对这三个关键过程的研究突出了文献中关于这些过程如何增加成功项目交付的空白。本研究的目的是考察项目风险监测和控制实践的利用是否与美国建设项目的项目成功有关。使用电子测量仪器从美国德克萨斯州达拉斯-沃斯堡地区的50个建筑项目经理样本中收集数据。Spearman rho相关分析用于检验项目风险监测和控制实践与项目成功之间的关系。研究结果表明,在建设项目中,风险再评估、风险审计、应急储备分析、风险状态会议等项目风险监控实践与项目成功之间存在显著正相关关系。这项研究提出的建议之一是,未来的研究应该在发展中国家进行同样的研究,看看这项研究的结果是否保持不变并具有普遍性。该研究的结论是,施工组织应定期考虑项目风险监测和控制实践的重要性和使用,并应用它们来提高项目的成功率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The utilization of project risk monitoring and control practices and their relationship with project success in construction projects
Risk monitoring and control is often poorly implemented in construction projects because of a failure to monitor and manage identified risks. Construction companies experience significant losses due to project managers' lack of project risk monitoring and control in construction projects. Most studies have concentrated on risk identification, risk assessment, and risk analysis processes while neglecting crucial risk management processes of risk control, risk monitoring, and risk response. The lack of research on these three crucial processes highlights a gap in the literature concerning how these processes can increase the delivery of successful projects. The purpose of this study was to examine whether the utilization of project risk monitoring and control practices was related to project success in construction projects in the United States. An electronic survey instrument was used to collect data from a sample of 50 construction project managers in the Dallas-Fort Worth area in the state of Texas, in the United States. Spearman rho correlation analysis was used to examine the relationship between project risk monitoring and control practices and project success. The results of this study indicated that all project risk monitoring and control practices, including risk reassessment, risk audits, contingency reserves analysis, and risk status meetings, were significantly and positively related to project success in construction projects. One of the recommendations presented in this study was that future research should conduct the same study in developing countries to see if the study’s findings remain the same and generalizable. The study concluded that construction organizations should regularly consider the importance and usage of project risk monitoring and control practices and apply them to improve the success rate of a project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1