具有序列依赖设置时间的阻塞流车间问题中最小化完工时间的有界动态规划方法

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2023-01-01 DOI:10.5267/j.jpm.2022.12.001
Edson Antônio Gonçalves de Souza, M. S. Nagano, Hugo Hissashi Miyata, L. R. Abreu
{"title":"具有序列依赖设置时间的阻塞流车间问题中最小化完工时间的有界动态规划方法","authors":"Edson Antônio Gonçalves de Souza, M. S. Nagano, Hugo Hissashi Miyata, L. R. Abreu","doi":"10.5267/j.jpm.2022.12.001","DOIUrl":null,"url":null,"abstract":"This paper aims at presenting an algorithm for solving the blocking flow shop problem with sequence dependent setup times (BFSP-SDST) with minimization of the makespan. In order to do so, we propose an adapted Bounded Dynamic Programming (BDP-SN) algorithm as solution method, since the problem itself does not present a significant number of sources in the state-of-art references and also because Dynamic Programming and its variants have been resurfacing in the flowshop literature. Therefore, we apply the modified method to two sets of problems and compare the results computationally and statistically for instances with a MILP and a B&B method for at most 20 jobs and 20 machines. The results show that BDP-SN is promising and outperforms both MILP and B&B within the established time limit. In addition, some suggestions are made in order to improve the method and employ it in parallel research regarding other branches of machine scheduling.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times\",\"authors\":\"Edson Antônio Gonçalves de Souza, M. S. Nagano, Hugo Hissashi Miyata, L. R. Abreu\",\"doi\":\"10.5267/j.jpm.2022.12.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper aims at presenting an algorithm for solving the blocking flow shop problem with sequence dependent setup times (BFSP-SDST) with minimization of the makespan. In order to do so, we propose an adapted Bounded Dynamic Programming (BDP-SN) algorithm as solution method, since the problem itself does not present a significant number of sources in the state-of-art references and also because Dynamic Programming and its variants have been resurfacing in the flowshop literature. Therefore, we apply the modified method to two sets of problems and compare the results computationally and statistically for instances with a MILP and a B&B method for at most 20 jobs and 20 machines. The results show that BDP-SN is promising and outperforms both MILP and B&B within the established time limit. In addition, some suggestions are made in order to improve the method and employ it in parallel research regarding other branches of machine scheduling.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2022.12.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2022.12.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了一种求解具有序列相关设置时间(BFSP-SDST)且最大完工时间最小的阻塞流车间问题的算法。为了做到这一点,我们提出了一种适应性的有界动态规划(BDP-SN)算法作为解决方法,因为问题本身并没有在最新的参考文献中提供大量的资源,也因为动态规划及其变体已经在flowshop文献中重新出现。因此,我们将改进的方法应用于两组问题,并对最多20个作业和20台机器使用MILP和B&B方法的实例进行计算和统计比较。结果表明,BDP-SN很有前景,在规定的时间内优于MILP和B&B。此外,对该方法进行了改进,并将其应用于机器调度的其他分支的并行研究中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
This paper aims at presenting an algorithm for solving the blocking flow shop problem with sequence dependent setup times (BFSP-SDST) with minimization of the makespan. In order to do so, we propose an adapted Bounded Dynamic Programming (BDP-SN) algorithm as solution method, since the problem itself does not present a significant number of sources in the state-of-art references and also because Dynamic Programming and its variants have been resurfacing in the flowshop literature. Therefore, we apply the modified method to two sets of problems and compare the results computationally and statistically for instances with a MILP and a B&B method for at most 20 jobs and 20 machines. The results show that BDP-SN is promising and outperforms both MILP and B&B within the established time limit. In addition, some suggestions are made in order to improve the method and employ it in parallel research regarding other branches of machine scheduling.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1