一种总延迟最小的订单调度问题的缩减算法

IF 1.3 Q4 ENGINEERING, INDUSTRIAL Journal of Project Management Pub Date : 2022-01-01 DOI:10.5267/j.jpm.2022.1.001
Stéphanie Alencar Braga-Santos, G. Barroso, B. Prata
{"title":"一种总延迟最小的订单调度问题的缩减算法","authors":"Stéphanie Alencar Braga-Santos, G. Barroso, B. Prata","doi":"10.5267/j.jpm.2022.1.001","DOIUrl":null,"url":null,"abstract":"We investigated a variant of the customer order scheduling problem taking into consideration due dates to minimize the total tardiness. Since the problem under study is NP-hard, we propose an efficient size reduction algorithm (SR). We perform an extensive computational experience and compare our proposition with JPO-20 matheuristic, the best existing algorithm for the problem under study. We use the Relative Deviation Index (RDI) and the Success Rate (SRa) as the statistical indicators for the performance measure. We must emphasize that SR presented the lowest average RDI (around 15.5 %), whereas the JPO-20 presented an average RDI approximately three times higher (around 52.5 %). Furthermore, the proposed SR presented a higher average SRa (around 66.9%), whereas the JPO-20 presented a lower average success (around 25.7%). Our proposal used a lower computational effort, resulting in a reduction for the computation times of approximately 22%. The obtained results point to the superiority of the proposed SR in comparison with the JPO-20.","PeriodicalId":42333,"journal":{"name":"Journal of Project Management","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A size-reduction algorithm for the order scheduling problem with total tardiness minimization\",\"authors\":\"Stéphanie Alencar Braga-Santos, G. Barroso, B. Prata\",\"doi\":\"10.5267/j.jpm.2022.1.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We investigated a variant of the customer order scheduling problem taking into consideration due dates to minimize the total tardiness. Since the problem under study is NP-hard, we propose an efficient size reduction algorithm (SR). We perform an extensive computational experience and compare our proposition with JPO-20 matheuristic, the best existing algorithm for the problem under study. We use the Relative Deviation Index (RDI) and the Success Rate (SRa) as the statistical indicators for the performance measure. We must emphasize that SR presented the lowest average RDI (around 15.5 %), whereas the JPO-20 presented an average RDI approximately three times higher (around 52.5 %). Furthermore, the proposed SR presented a higher average SRa (around 66.9%), whereas the JPO-20 presented a lower average success (around 25.7%). Our proposal used a lower computational effort, resulting in a reduction for the computation times of approximately 22%. The obtained results point to the superiority of the proposed SR in comparison with the JPO-20.\",\"PeriodicalId\":42333,\"journal\":{\"name\":\"Journal of Project Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5267/j.jpm.2022.1.001\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5267/j.jpm.2022.1.001","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 3

摘要

我们研究了客户订单调度问题的一个变体,考虑到交货日期,以尽量减少总延误。由于所研究的问题是np困难的,我们提出了一种有效的尺寸缩减算法(SR)。我们进行了大量的计算经验,并将我们的命题与JPO-20数学算法进行了比较,JPO-20是目前研究问题的最佳算法。我们使用相对偏差指数(RDI)和成功率(SRa)作为绩效衡量的统计指标。我们必须强调,SR的平均RDI最低(约15.5%),而JPO-20的平均RDI大约高出三倍(约52.5%)。此外,建议的SR具有较高的平均SRa(约66.9%),而JPO-20具有较低的平均成功率(约25.7%)。我们的建议使用了较低的计算量,从而使计算时间减少了大约22%。所得结果表明,与JPO-20相比,所提出的SR具有优越性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A size-reduction algorithm for the order scheduling problem with total tardiness minimization
We investigated a variant of the customer order scheduling problem taking into consideration due dates to minimize the total tardiness. Since the problem under study is NP-hard, we propose an efficient size reduction algorithm (SR). We perform an extensive computational experience and compare our proposition with JPO-20 matheuristic, the best existing algorithm for the problem under study. We use the Relative Deviation Index (RDI) and the Success Rate (SRa) as the statistical indicators for the performance measure. We must emphasize that SR presented the lowest average RDI (around 15.5 %), whereas the JPO-20 presented an average RDI approximately three times higher (around 52.5 %). Furthermore, the proposed SR presented a higher average SRa (around 66.9%), whereas the JPO-20 presented a lower average success (around 25.7%). Our proposal used a lower computational effort, resulting in a reduction for the computation times of approximately 22%. The obtained results point to the superiority of the proposed SR in comparison with the JPO-20.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.70
自引率
5.90%
发文量
16
审稿时长
16 weeks
期刊最新文献
Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times Review of sustainable concrete based on photocatalytic to reduce the environmental impact in large works in Peru Development of a robust multi-objective model for green capacitated location-routing under crisis conditions The effect of tourism village development project on economic sustainability through tourism villages based on natural and cultural potentials Structural equation modeling of critical success factors in the programs of development regional
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1