Yuan-Zhen Li, K. Gao, Lei-lei Meng, Xue-Lei Jing, Biao Zhang
{"title":"带峰值功耗约束的流程车间最大完工时间最小化的启发式和元启发式方法","authors":"Yuan-Zhen Li, K. Gao, Lei-lei Meng, Xue-Lei Jing, Biao Zhang","doi":"10.5267/j.ijiec.2023.2.004","DOIUrl":null,"url":null,"abstract":"This paper addresses the permutation flowshop scheduling problem with peak power consumption constraints (PFSPP). The real-time power consumption of the PFSPP cannot exceed a given peak power at any time. First, a mathematical model is established to describe the concerned problem. The sequence of operations is taken as a solution and the characteristics of solutions are analyzed. Based on the problem characteristics, eight heuristics are proposed, including balanced machine-job decoding method, balanced machine-job insert method, balanced job-machine insert method, balanced machine-job group insert method, balanced job-machine group insert method, greedy algorithm, beam search algorithm, and improved beam search algorithm. Similarly, the canonical artificial bee colony algorithm and iterated local search algorithm are modified based on the problem characteristics to solve the PFSPP. A large number of experiments are carried out to evaluate the performance of new proposed heuristics and metaheuristics. The results and discussion show that the proposed heuristics and metaheuristics perform well in solving the PFSPP.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"18 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints\",\"authors\":\"Yuan-Zhen Li, K. Gao, Lei-lei Meng, Xue-Lei Jing, Biao Zhang\",\"doi\":\"10.5267/j.ijiec.2023.2.004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the permutation flowshop scheduling problem with peak power consumption constraints (PFSPP). The real-time power consumption of the PFSPP cannot exceed a given peak power at any time. First, a mathematical model is established to describe the concerned problem. The sequence of operations is taken as a solution and the characteristics of solutions are analyzed. Based on the problem characteristics, eight heuristics are proposed, including balanced machine-job decoding method, balanced machine-job insert method, balanced job-machine insert method, balanced machine-job group insert method, balanced job-machine group insert method, greedy algorithm, beam search algorithm, and improved beam search algorithm. Similarly, the canonical artificial bee colony algorithm and iterated local search algorithm are modified based on the problem characteristics to solve the PFSPP. A large number of experiments are carried out to evaluate the performance of new proposed heuristics and metaheuristics. The results and discussion show that the proposed heuristics and metaheuristics perform well in solving the PFSPP.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"18 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2023.2.004\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2023.2.004","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints
This paper addresses the permutation flowshop scheduling problem with peak power consumption constraints (PFSPP). The real-time power consumption of the PFSPP cannot exceed a given peak power at any time. First, a mathematical model is established to describe the concerned problem. The sequence of operations is taken as a solution and the characteristics of solutions are analyzed. Based on the problem characteristics, eight heuristics are proposed, including balanced machine-job decoding method, balanced machine-job insert method, balanced job-machine insert method, balanced machine-job group insert method, balanced job-machine group insert method, greedy algorithm, beam search algorithm, and improved beam search algorithm. Similarly, the canonical artificial bee colony algorithm and iterated local search algorithm are modified based on the problem characteristics to solve the PFSPP. A large number of experiments are carried out to evaluate the performance of new proposed heuristics and metaheuristics. The results and discussion show that the proposed heuristics and metaheuristics perform well in solving the PFSPP.