{"title":"价值链卓越-管理可变性,以稳定和利用矿山价值链","authors":"M. Bloss, G. Capes, Russell Seib, Liam V. Alford, Jack L. Light, I. Minniakhmetov, C. Nielsen","doi":"10.1080/25726668.2020.1818029","DOIUrl":null,"url":null,"abstract":"ABSTRACT Mining occurs in highly variable, spatially dynamic environments. Existing methods of planning and operations management are insufficient to adequately account for variability. Managing variability within the value chain aims to maximise business value. This paper presents a methodology for managing variability. This includes: assessing the impact of variability on a deterministic mine schedule; applying guiding principles based on Theory of Constraints to stabilise and exploit the value chain; developing a risk approach to minimise costs of plan delivery; and establishing tools for critical path planning, reconciling performance against plan and establishing corrective actions to deliver plan outcomes. A case study is presented from the Olympic Dam mine. Conclusions include: operations contain significant variability that if not managed will fail to deliver the mine plan; the proposed methodology can be applied to reduce variability and robustly deliver the best-value mine plan; and this methodology has broad application across the mining industry.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"17 1","pages":"187 - 205"},"PeriodicalIF":1.8000,"publicationDate":"2020-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Value chain excellence – managing variability to stabilise and exploit the mine value chain\",\"authors\":\"M. Bloss, G. Capes, Russell Seib, Liam V. Alford, Jack L. Light, I. Minniakhmetov, C. Nielsen\",\"doi\":\"10.1080/25726668.2020.1818029\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT Mining occurs in highly variable, spatially dynamic environments. Existing methods of planning and operations management are insufficient to adequately account for variability. Managing variability within the value chain aims to maximise business value. This paper presents a methodology for managing variability. This includes: assessing the impact of variability on a deterministic mine schedule; applying guiding principles based on Theory of Constraints to stabilise and exploit the value chain; developing a risk approach to minimise costs of plan delivery; and establishing tools for critical path planning, reconciling performance against plan and establishing corrective actions to deliver plan outcomes. A case study is presented from the Olympic Dam mine. Conclusions include: operations contain significant variability that if not managed will fail to deliver the mine plan; the proposed methodology can be applied to reduce variability and robustly deliver the best-value mine plan; and this methodology has broad application across the mining industry.\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":\"17 1\",\"pages\":\"187 - 205\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2020-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2020.1818029\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2020.1818029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 1

摘要

采矿发生在高度可变的空间动态环境中。现有的规划和业务管理方法不足以充分考虑到可变性。管理价值链中的可变性旨在最大化业务价值。本文提出了一种管理可变性的方法。这包括:评估变异性对确定的采矿时间表的影响;运用基于约束理论的指导原则来稳定和开发价值链;制定风险管理方法,以尽量减少计划交付的成本;为关键路径规划建立工具,根据计划协调绩效,并建立纠正措施以交付计划结果。以奥林匹克坝煤矿为例进行了分析。结论包括:作业有很大的可变性,如果不加以管理,将无法执行地雷计划;所提出的方法可用于减少可变性和鲁棒性提供最优价值的矿山计划;这种方法在整个采矿业都有广泛的应用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Value chain excellence – managing variability to stabilise and exploit the mine value chain
ABSTRACT Mining occurs in highly variable, spatially dynamic environments. Existing methods of planning and operations management are insufficient to adequately account for variability. Managing variability within the value chain aims to maximise business value. This paper presents a methodology for managing variability. This includes: assessing the impact of variability on a deterministic mine schedule; applying guiding principles based on Theory of Constraints to stabilise and exploit the value chain; developing a risk approach to minimise costs of plan delivery; and establishing tools for critical path planning, reconciling performance against plan and establishing corrective actions to deliver plan outcomes. A case study is presented from the Olympic Dam mine. Conclusions include: operations contain significant variability that if not managed will fail to deliver the mine plan; the proposed methodology can be applied to reduce variability and robustly deliver the best-value mine plan; and this methodology has broad application across the mining industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
期刊最新文献
Digital twins in the minerals industry – a comprehensive review Mining Metaverse – a future collaborative tool for best practice mining Reliability evaluation of CAN-bus connectors with tailored testing Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation A Genetic algorithm scheme for large scale open-pit mine production scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1