建筑行业实施建筑信息模型(BIM)的关键成功因素

Bassam A. Tayeh
{"title":"建筑行业实施建筑信息模型(BIM)的关键成功因素","authors":"Bassam A. Tayeh","doi":"10.19080/cerj.2019.08.555739","DOIUrl":null,"url":null,"abstract":"Succar [3] defined BIM as “a set of interacting policies, processes and technologies generating a methodology to manage the essential building design and project data in digital format throughout the building’s life-cycle”. BIM has developed civil engineering industries and construction process over the last years [4]. The implementation of BIM has been slowed particularly in small firms [5,6]. Many solutions have either concentrated onto technical issues (for example, software interoperability and software and training costs) or non-technical issues (for example, cultural change and legal uncertainties) [4,7]. However, solving these issues needs a better knowledge about Critical Success Factors (CSFs) to implement BIM successfully [8]. Rockart [9] defined CSFs as: “few key areas of activity where favorable results are absolutely necessary for a manager to reach his/ her goals.” Therefore, CSFs for BIM implementation was defined by Won [10] as a group of key areas that motivate stakeholders to alter their traditional project delivery system to implement BIM collaboratively from the beginning of design phase to facility management phase.","PeriodicalId":30320,"journal":{"name":"Constructii Journal of Civil Engineering Research","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Critical Success Factors for Implementing Building Information Modeling (BIM) in Construction Industry\",\"authors\":\"Bassam A. Tayeh\",\"doi\":\"10.19080/cerj.2019.08.555739\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Succar [3] defined BIM as “a set of interacting policies, processes and technologies generating a methodology to manage the essential building design and project data in digital format throughout the building’s life-cycle”. BIM has developed civil engineering industries and construction process over the last years [4]. The implementation of BIM has been slowed particularly in small firms [5,6]. Many solutions have either concentrated onto technical issues (for example, software interoperability and software and training costs) or non-technical issues (for example, cultural change and legal uncertainties) [4,7]. However, solving these issues needs a better knowledge about Critical Success Factors (CSFs) to implement BIM successfully [8]. Rockart [9] defined CSFs as: “few key areas of activity where favorable results are absolutely necessary for a manager to reach his/ her goals.” Therefore, CSFs for BIM implementation was defined by Won [10] as a group of key areas that motivate stakeholders to alter their traditional project delivery system to implement BIM collaboratively from the beginning of design phase to facility management phase.\",\"PeriodicalId\":30320,\"journal\":{\"name\":\"Constructii Journal of Civil Engineering Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Constructii Journal of Civil Engineering Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.19080/cerj.2019.08.555739\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Constructii Journal of Civil Engineering Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19080/cerj.2019.08.555739","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

Succar[3]将BIM定义为“一套相互作用的政策、流程和技术,产生一种方法,在整个建筑生命周期内以数字格式管理基本的建筑设计和项目数据”。在过去的几年里,BIM发展了土木工程行业和施工过程[4]。BIM的实施已经放缓,特别是在小公司[5,6]。许多解决方案要么集中于技术问题(例如,软件互操作性以及软件和培训成本),要么集中于非技术问题(例如,文化变革和法律不确定性)[4,7]。然而,要解决这些问题,需要更好地了解成功实施BIM的关键成功因素(csf)[8]。Rockart[9]将CSFs定义为:“几个关键的活动领域,其中有利的结果对于管理者达到他/她的目标是绝对必要的。”因此,Won[10]将BIM实施的CSFs定义为一组关键领域,这些领域激励利益相关者改变其传统的项目交付系统,从设计阶段开始到设施管理阶段协同实施BIM。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Critical Success Factors for Implementing Building Information Modeling (BIM) in Construction Industry
Succar [3] defined BIM as “a set of interacting policies, processes and technologies generating a methodology to manage the essential building design and project data in digital format throughout the building’s life-cycle”. BIM has developed civil engineering industries and construction process over the last years [4]. The implementation of BIM has been slowed particularly in small firms [5,6]. Many solutions have either concentrated onto technical issues (for example, software interoperability and software and training costs) or non-technical issues (for example, cultural change and legal uncertainties) [4,7]. However, solving these issues needs a better knowledge about Critical Success Factors (CSFs) to implement BIM successfully [8]. Rockart [9] defined CSFs as: “few key areas of activity where favorable results are absolutely necessary for a manager to reach his/ her goals.” Therefore, CSFs for BIM implementation was defined by Won [10] as a group of key areas that motivate stakeholders to alter their traditional project delivery system to implement BIM collaboratively from the beginning of design phase to facility management phase.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
4
审稿时长
16 weeks
期刊最新文献
The Abductive Method to Generate Polymath Knowledge in Technical-Scientific Production Trends in the Addition of PET and Natural Fibers to the Concrete- Steel Reinforcement System Psychometric Properties of the Alcohol Use Disorders Identification Test (AUDIT) and Prevalence of Alcohol use Among SA Site-based Construction Workers Security & Happiness by Design for Happiness Initiated Behavioural Lead Intelligence Security System (HIBLISS) Groundwater Level Estimation for Slope Stability Analysis of a Coal Open Pit Mine
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1